Study Days THE ISSUE: There is confusion around the definition of STUDY DAY and the date assigned by the computer in the eCRF. WHO DOES THIS IMPACT? Sites.

Slides:



Advertisements
Similar presentations
Task: Add a Role To see this in PennWorks...click herehere Task Definition: Add additional roles to an existing employee’s record. Steps – From the Roles/Distributions.
Advertisements

Public School Concurrency Plat Implementation Process Broward County Environmental Protection and Growth Management October
1 Introduction to Data Flow Analysis. 2 Data Flow Analysis Construct representations for the structure of flow-of-data of programs based on the structure.
ProCalc Nsg 132 Calculating ml per hour Example 1 An IV will be administered using an infusion pump that delivers ml/hr. D2.5W (2.5% Dextrose in Water)
SECTION 4-4 C Rate Graphs. Graphs of “rates” are common in Calculus. While the horizontal axis in such graphs may stand for many things, it often stands.
MAIN FEATURES OF THE PEP uP PROTOCOL All patients will receive Peptamen ® Bariatric initially All patients will start on Beneprotein ® -2 packets (14.
Secondary Master Schedule Development Lesson 2: Information Gathering & Articulation Carol Waldron.
Eran Chinthaka & Jaliya Ekanayake Class Project for: Knowledge Based Computing (B552)
WARS WARS ONE Intern WARS –Dec 21-Dec 26 th Resident WARS –Dec 22-Dec 27th.
Hospital Surveillance. Impact of infectious diseases  IDs are considered to be the leading cause of death  Mass population movement  Emerging and re-emerging.
Case Report Form Start-up Meeting March 25, 2010 Kingston, ON.
Telling Time!!! Using a.m./ p.m. 24 hour clocks There are 24 hours in a day…
Pathways for ED Hospital Admissions Baptist Memorial Hospital-Golden Triangle.
© 2012 Pearson Prentice Hall. All rights reserved. Process Costing.
Anytime 24 hours a day, 7 days a week the parts library around the world will come to you. Toyota Industries Corporation.
College Algebra Credit Through Kentucky State University.
Abstractor Training Locating Data in StarPanel and HED August 26, 2014 Systems Support Services.
Supplies: markers, posters, tape, admissions essay prompts.
Copyright © 2010ZPM Solutions. All rights reserved. Contractor Management Work Bench.
computer
First and Last Name Date10/25/13 Hour 1
SWBAT… calculate ratio and proportion problems
Date: 9/25 (B) & 9/26 (A – Sub) Outcome: Students will identify and evaluate types and availability of renewable and nonrenewable resources Question: How.
AFTER-SCHOOL STUDY HALL DON’T WAIT UNTIL IT’S TOO LATE! WHICH CLASS IS FOR YOU?
Converting Time Revision Level D Learning Intention Success Criteria
Copyright © 2016 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
This is Not a Book About …. Author: Illustrator: Class: Date:
1 By: Prof. Y. Peter Chiu POM Chap-8: Scheduling ~ Homework Problems ~
Author Study Activity: Langston Hughes. Activity You will be working in groups. Your group will be assigned a section of the text. Your group will be.
Lab Test 2 Session 1 Date: Friday, December 3 Time: 2:30 - 4:20 (110 minutes) Locations: - Lab 1006 (for Friday students) - Lab 1004 (for Monday students)for.
HOW CAN I USE A CLOCK TO HELP TELL ELAPSED TIME? UNIT 7 CONCEPT: MCC.4.MD.1 Elapsed Time.
Why your baby’s data are important
Calculating IV Infusion and Completion Times
MEASURE(S)/OUTCOME(S)
What Are Friends?.
Activity List the human resources needed on your project
Why your baby’s data are important
ASSIGNMENT NO.-2.
IS IT EFFECTIVE TO RUN ONLINE DATING BACKGROUND CHECKS YOURSELF?
INVENTORIES AND THE COST OF GOODS SOLD
Module 15 Observing and Charting
ECH 531 Innovative Education-- snaptutorial.com
Time Revision.
Pegasus Impact Priority and Urgency
Solar City: Effect of Solar Technologies on Network Performance
Year 10 End of Year Exam Timetable
Li Ne O Mg Chemical Symbols and Information Name: Class: Date:
Unit Flow In the long run, the product flow through each operation must be proportional to the output flow of the process 8/24/04 Paul A. Jensen Operations.
1. Volume-Based Feeds: (most patients)
Measurement Strategy Project Topic: ____________________________ Date: _____________ Primary Driver (Which primary driver does this measure fall into?)
Observation/Inpatient
Why your baby’s data are important
Measurement Strategy Project Topic: ____________________________ Date: _____________ Primary Driver (Which primary driver does this measure fall into?)
مديريت موثر جلسات Running a Meeting that Works
ECONOMICS: August 31 Warm-up #1 (SLO)
        CALCULATING THE MATURITY DATE 1 2 CALCULATING INTEREST
Chemistry – Sept 15, 2017 P3 Challenge – Do Now (on slips of paper today) ACT Practice papers for “ACT Friday” REAL ACT questions for two passages. It.
The REDOXS© Study REducing Deaths from OXidative Stress PART 2 of 4
Assignment write-up date- 21st of February
An object travels 40 miles in 2 hrs. Calculate its speed?
BUS 211 Principle of Business Management
Bell-ringer: 1 minute Talk to person next to you about these
INSTITUTO ANGLO BRITÁNICO “Una visión universal” MYP IV Homework
Thing / Person:____________________ Dates:_________________
1. Volume-Based Feeds: (most patients)
HISTORY OF THE EARTH ANSWER SHEET
This is my sheet And this is my sheet.
Elapsed Time Using Benchmarks.
Manager Self Service with HR Direct Approval of Time
Presentation transcript:

Study Days THE ISSUE: There is confusion around the definition of STUDY DAY and the date assigned by the computer in the eCRF. WHO DOES THIS IMPACT? Sites who have flow sheets that DO NOT run midnight- to-midnight. The confusion arises when there is an ICU admission time after midnight but before the end of the flow sheet.

Study Day 1 Study Day 1 is the day & time of ICU admission to the END of your site’s flow sheet. EXAMPLE: Flow sheet: 07:00 to 06:59 ICU admit: 05:30 The computer assigns Study Day 1: 08-Jan-08 This means you collect data from 08-Jan-08 at 05:30 UNTIL 08-Jan-08 at 06:59 Note: Study Day 1 is only 1 hr 59 min.

STUDY DAY 1 08-Jan-08 at 05:30 UNTIL 08-Jan-08 at 06:59 ICU admit: 05:30

Study Day 2, etc. Subsequent study days are represented by the 24 hours period according to your flow sheet. The study day date assigned by the computer is the date at the end of your flow sheet EXAMPLE: Flow sheet: 07:00 to 06:59 ICU admit: 05:30 Day 2: 08-Jan-08 at 07:00 UNTIL 09-Jan-08 at 06:59 Day 3: 09-Jan-08 at 07:00 UNTIL 10-Jan-08 at 06:59 Day 4: 10-Jan-08 at 07:00 UNTIL 11-Jan-08 at 06:59 Day 5: 11-Jan-08 at 07:00 UNTIL 12-Jan-08 at 06:59 ……etc

Study Day 2 = 09/Jan/2008 You collect data from 07:00 until 06:59 Study Day 3 = 10/Jan/2008 You collect data from 07:00 until 06:59 Study Day 4 = 11/Jan/2008 You collect data from 07:00 until 06:59