GlueX Collaboration Meeting October 2-4, 2014 Trigger System Update R. Chris Cuevas Trigger Hardware/Firmware Status  Hardware Status  Performance Test.

Slides:



Advertisements
Similar presentations
A 250 MHz Level 1 Trigger and Distribution System for the GlueX Experiment David Abbott, C. Cuevas, E. Jastrzembski, F. Barbosa, B. Raydo, H. Dong, J.
Advertisements

GlueX Collaboration Meeting June 3-5, GeV Trigger Electronics R. Chris Cuevas 1.Hardware Status  Production Updates 2.DAq and Trigger Testing 
Level-1 Trigger Commissioning H.Dong, A.Somov Jefferson Lab Trigger Workshop, Jul 8, 2010.
Integrated Tests of a High Speed VXS Switch Card and 250 MSPS Flash ADC Hai Dong, Chris Cuevas, Doug Curry, Ed Jastrzembski, Fernando Barbosa, Jeff Wilson,
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
GlueX Collaboration Meeting May 12-14, GeV Trigger Electronics R. Chris Cuevas Trigger Hardware/Firmware Status  Global Trigger  Installation.
EIC Workshop 21 May 2008 Experience with high trigger R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division Topics Cebaf’s Large.
1.Status update from May 2011  FADC250 and Trigger modules  Two crate testing success 2.Schedule  How about those requirements?  What’s happened since.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Trigger Database Dmitry Romanov. Run Control Super- visor Agent CODA ROC Write Configuration tag – run number Run Config DB CODA ROC Agent    Hardware.
GlueX Collaboration Oct '06 C. Cuevas 1 Topics: Projects and Progress 250Msps Flash ADC Energy Sum Module The Bigger Picture DAQ/Electronics Work Plans.
 Brief status update of DAQ/Trigger production hardware  Firmware development for HPS application  CLAS12 CTP ‘upgrade’ notes  Summary Status of the.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
Prototype of the Global Trigger Processor GlueX Collaboration 22 May 2012 Scott Kaneta Fast Electronics Group.
GlueX Collaboration Meeting February , GeV Trigger Electronics R. Chris Cuevas Hardware Status ( A top down view,, )  Global Trigger Processing.
GlueX electronics Collaboration Meeting May, 2004 Paul Smith.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
GlueX Collaboration Meeting February , GeV Trigger Electronics R. Chris Cuevas 1.Hardware Design Status Updates  Production News  Status.
DAQ Status Report GlueX Collaboration – Jan , 2009 – Jefferson Lab David Abbott (In lieu of Graham) GlueX Collaboration Meeting - Jan Jefferson.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
GlueX Collaboration Meeting 12GeV Trigger Electronics October 4 - 6, 2012 R. Chris Cuevas 1.Hardware Design Status Updates  Production News  Acceptance.
Data Acquisition for the 12 GeV Upgrade CODA 3. The good news…  There is a group dedicated to development and support of data acquisition at Jefferson.
06/07/041 F1TDC Status Update Hall D Collaboration Meeting Indiana University – Bloomington, IN May 20-22, 2004 Fernando J. Barbosa
Hall D Level 1 Trigger Dave Doughty 1/10/2008 Hall D Collaboration Meeting.
David Abbott - JLAB DAQ group Embedded-Linux Readout Controllers (Hardware Evaluation)
1 Trigger and DAQ for SoLID SIDIS Programs Yi Qiang Jefferson Lab for SoLID-SIDIS Collaboration Meeting 3/25/2011.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
Trigger Interface and Distribution J. William Gu Jefferson Lab 1. What is TID 2. TID Structure and functions 3. Possible usage in the system 4. TID related.
David Abbott - Jefferson Lab DAQ group Data Acquisition Development at JLAB.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
GlueX Collaboration Meeting 12GeV Trigger Electronics 10 May 2010 R. Chris Cuevas 1.FY10 Project Goals  Update from January 2010 Collaboration Meeting.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Hall D Online Meeting 9 August 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division Mission Who’s Who.
1 April 2009 NA62 DAQ meeting1 LKr calorimeter readout project H.Boterenbrood, A.Ceccucci, B.Hallgren, M.Piccini, H. Wendler.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
GTP Update 3 March Cuevas. CPUPP17PP15PP13PP11PP09PP07PP05PP03PP01SWASWBPP02PP04PP06PP08PP10PP12PP14PP16PP18 64x***SSP GTPA GTPB SSP TI DP1LVPECL.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Hall–D Level-1 Trigger Commissioning Part II A.Somov, H.Dong Jefferson Lab 12 GeV Trigger Workshop, July 8, 2010  Play Back Test Vector in Hall-D commissioning.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
A 250 MHz Level 1 Trigger and Distribution System for the GlueX Experiment David Abbott, C. Cuevas, E. Jastrzembski, F. Barbosa, B. Raydo, H. Dong, J.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Fast Electronics Group Experimental Nuclear Physics Division
CLAS12 DAQ & Trigger Status
B. Raydo, C. Cuevas, D. Abbott, B. Moffit, J. Wilson, S. Boiarinov
Injectors BLM system: PS Ring installation at EYETS
fADC125 Status Cody Dickover
GlueX Electronics Review Jefferson Lab July 23-24, 2003
JLAB Front-end and Trigger Electronics
Fernando J. Barbosa F1TDC Status Update Hall D Collaboration Meeting Indiana University – Bloomington, IN May 20-22, 2004 Fernando J.
New Pipeline DAQ and 12GeV Trigger Systems
Example of DAQ Trigger issues for the SoLID experiment
CLAS12 Timing Calibration
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

GlueX Collaboration Meeting October 2-4, 2014 Trigger System Update R. Chris Cuevas Trigger Hardware/Firmware Status  Hardware Status  Performance Test Plan L1 Firmware Status Round Trip Latency Check Diagnostics/Monitoring  Summary

2 Hardware Status Trigger Supervisor ( TS ) - Complete  No open issues  ‘3 rd ’ Trigger crate installed in U1-14 to support separate FDC-CDC DAq -TD boards must be swapped to TS crate when using global system DAq Trigger Supervisor Input/Output (TSIO) – Complete Rear transition board tested with Densishield cable from GTP Polarity of receivers was incorrect. Repaired in firmware. Global Trigger Processor ( GTP ) – Complete Testing continues and verification of CODA libraries with the latest firmware release is ongoing. GTP manual to be released to web site soon. (Ben, Bryan, D. Abbott)  CODA process runs on embedded Linux OS on the GTP  Interface through Ethernet for configuration and diagnostics William Gu Ben Raydo Bryan Moffit C. Cuevas

TI – TD Trigger Interface – Trigger Distribution – Complete Additional spares on site and tested SubSystem Processor ( SSP ) – Complete Signal Distribution ( SD ) – Complete Electronics group has 4 new spares 3 William Gu B. Moffit D. Abbott Hardware Status

Trigger Fiber Optics Trigger System Fiber Optics - Complete  System diagrams updated for Hall D  Patch cable labels updated  Thanks to Hall D group for installation help! 4 A. Stepanyan M. Taylor

5 William Gu B. Moffit D. Abbott Hardware Status Electrical –Optical-Electrical Electrical-to-Optical converters have been installed in the Tagger area and the FCAL platform. (Highland Technology – V720) There is a single Optical-to-Electrical converter in the TS crate (V730) The transmit units (EO) convert NIM signals to optical Simple method to send diagnostic signals from these areas to the TS rack IN1 IN6 NIM Input Signals Tagger Area Rack T-2 TS Crate Rack U1-14 IN1 IN6 NIM Input Signals Six (6) ST FO Connectors Six (6) ST FO Connectors FCAL Platform Rack D2-1(TOF) Only 6 FO INputs FO Trunk Line OUT1 OUT6

Crate Trigger Processor Firmware VXS Connectors Collect serial data from 16 FADC-250 (64Gbps ) Hai Dong Jeff Wilson B. Moffit A. Somov 2013 Production CTP New Front Panel I/O 6 Crate Trigger Processor ( CTP ) - Complete Production quantities (30) for Hall D All production boards pass (FCAT) Full Crate Acceptance Testing -CTP boards delivered to Hall D group Custom firmware for FCAL and BCAL energy sum and pedestal subtraction are tested with CODA libraries. CTP  SSP fiber link ID firmware feature is complete. Custom trigger firmware for: TAGM TAGH PS ST are complete and are in the final stage of test verification with latest CODA libraries. MTP Parallel Optics 8 Gbps to SSP Hardware Status

 Flash ADC 250Msps ( FADC250 ) - Production board delivery to JLAB groups is complete Production board repairs are progressing. (Only 8 more Hall D boards to repair!)  Bryan Moffit’s DAQ site contains the latest Jlab Module Manuals with notes for relevant firmware version and CODA libraries. -Firmware change request method seems to be working well. 1.Submit request to Hall D DAQ person 2.Hall D DAQ person sends to FE and DAQ group leaders 3.FE/DAQ groups will prioritize and organize relevant discussion meetings as required. 7 Trigger Hardware Status F. Barbosa H. Dong E. Jastrzembski Jeff Wilson

Round Trip Trigger Latency Check 8 Ben Raydo William Gu B. Moffit A. Somov

9 Performance Testing Measured in the lab, need to measure in the Hall next?

Performance Testing What’s next? Activity – Performance Testing Establish trigger distribution connections (Fiber) to all crates Global Crate o Establish CTP  SSP fiber link connections o Initial GTP and TS Trigger functions appear to work well o 2 nd TS crate added for FDC and CDC for independent readout Is this a permanent solution? o Limited high rate testing accomplished with TOF, Global and TS crates Cosmic Ray trigger testing successful FCAL, BCAL, TOF BCAL with FDC and CDC -TAGH crate remains in the Tagger area for another week 10

Activity – Performance Testing  Trigger system hardware design goals need to be tested and verified  The CODA/DAq/Network/EB/ET hardware and software testing ran into issues, so there may not be enough time before 1 st beam to fully test the Trigger system at design goal rates. (200KHz)  High rate (>10KHz?) not required for initial beam commissioning in the next month. 11 Performance Testing What’s next?

Activity – Performance Testing  Firmware features and tools exist to fully test the front end hardware and trigger modules without detector signals. -- Test procedure { Use ALL DAq crates }  Use “Playback” mode to simulate low or high occupancy in FADC250 crates.  Configure readout mode for Integral value. [Reduce data size per trigger]  Configure BUSY assertion level in FADC250 crates  Configure L1 CTP boards for Energy Sum, or Bit-Patterns  Use TS to produce TRIG2 command at random rate. -TRIG2 is used to start the “Playback” waveform -Use TRIG2 to test rate up to 200KHz  VERIFY  Trigger counters – All boards, All crates  Clock counters – All boards, All crates  Sums and Bit-Patterns should be deterministic and align without issue  Test duration - How long will the system remain error free? - At what rate does the system become unstable? 12 Performance Testing What’s next?

Activity – Performance Testing  Would be nice to have expert ‘screens’ for diagnostics of Trigger boards. - Every board has FPGA temperature and voltage registers for readout - May be a good idea to log these at a slow rate (back round process?)  Other diagnostic tools that will prove very useful in the future should use small scale DAq/Trigger setups that include the TS-TD crate, Global Crate and a single L1 crate. - This type of 3 crate tool would use “Playback” data to quickly run deterministic Trigger testing and verify that all timing, FO links, Gigabit Serial transport hardware is functioning properly. 13 Performance Testing What’s next?

Summary All Global Trigger and Trigger Distribution hardware installed All Trigger FO trunk lines are installed and tested Firmware released for all boards is stable - Final testing and verification in progress for CTP applications Essential CODA library development and library release is complete for almost every board. GTP still going through final iterations. High rate performance testing still needs to be completed and documented -Tools for “Playback” mode testing exist 12GeV Trigger hardware meetings have concluded, but meetings for specific trigger application development in each Hall will continue. Questions? 14

All sorts of cool stuff

All Trigger Modules Delivered! 2 Front End Crate FADC250, (FADC125), (F1TDC) Crate Trigger Processor Signal Distribution Trigger Interface Trigger Control/Synchronization Trigger Supervisor Trigger Distribution L1 Trigger ‘Data’ MTP Ribbon Fiber Trigger ‘Link” Control Clock, Sync MTP Ribbon Fiber Global Trigger Crate Sub-System Processor Global Trigger Processor

Full DAq Crate Testing Plans 17 Before deploying full crates with all required modules: Will test using “Playback” mode and CODA No input cables necessary; User defined signals loaded in front-end FPGA Deterministic test for all channels and Gigabit serial lane alignment check Verify TI  SD  Payload Board Synchronization and Clock Re-Use these tools for Hall commissioning effort Test station used for FINAL firmware verification and software ‘library’ development Bryan Moffit has created a preliminary plan and list of test functions See wiki link  This full crate test station in EEL109 is an essential infrastructure element needed to test and verify the front end and trigger hardware/software before installation in the Halls. Bryan Moffit Et al.

System Description Crate Trigger Processing Flash ADC Modules Detector Signals Sub-System Processing (Multi-Crate) Global Trigger Processing Trigger Supervisor (Distribution) TS -> TD -> TI Link 1.25Gb/s Bi-Directional BUSY Trigger Sync Trig_Comnd CTP -> SSP -> GTP L1 Trig_Data Uni_Directional Energy Sums 6

Noise in the FADC (No Readout during data taking) 03/21/2012CniPol Meeting 19 Single Event All Events

Noise in the FADC (Readout during data taking) 03/21/2012CniPol Meeting 20 Single Event All Events

Two DAQ Crate Testing: FY11 200KHz Trigger Rate! Pre-Production and 1 st article boards have been received and tested Significant effort for circuit board fabrication, assembly and acceptance testing System testing includes: Gigabit serial data alignment 4Gb/s from each slot 64Gb/s to switch slot Crate sum to Global Low jitter clock, synchronization ~1.5ps clock jitter at crate level 4ns Synchronization Trigger rate testing Readout Data rate testing Bit-Error-Rate testing - Need long term test ( hrs) Overall Trigger Signal Latency ~ 2.3us (Without GTP and TS) Readout Controller Capable of 110MB/s - Testing shows we are well within limits