Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.

Slides:



Advertisements
Similar presentations
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting November 19, 2012.
Advertisements

Town of Mount Airy Main Street Construction Update Community Forum #5 and #6.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
Timeline of Key Milestones and Dates DateKey Milestone February 2007Washtenaw County Drain Commissioner’s Office authorizes a project to identify opportunities.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting July 12, 2012.
6 th Street Water Main And Street Reconstruction 2013.
City of Bloomfield Hills 2015 Road Improvement Program.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
AWARD OF CONTRACT FOR CONSTRUCTION OF MASTER DRAINAGE FACILITY LINES D & D1 CIP NO City Council Meeting December 20, 2011.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
1 Status Report on H. Ligarde Elementary School Parking Lot Facility Construction Department August 16, 2002.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Special Order by Consent Wastewater Collection Improvement Projects Mark Fisher and Dennis Asbury Final Report to City of Eden October 20, 2009.
Britannia Village Flood Control System Information Meeting for Directly Affected Landowners February 5, 2009.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
1 School District of Osceola County Facilities, Planning, Maintenance & Construction Monthly Update – April 2007 Construction Workshop 24 April 2007.
Erosion & Sediment Control. Wind Erosion Water Erosion.
1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.
December 3, 2015 TOWN OF MILLBURY DPW, MA Robert McNeil, P.E., Director PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer This project.
Oakcreek, Copperfield Court, and Coulee’s Crossing Area Flood Risk Management Project City of Fargo Oakcreek, Copperfield Court, and Coulee’s Crossing.
PUBLIC INPUT SESSION NOVEMBER 10, 2015 City of Asbury Birchwood Drive Reconstruction Project.
I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
TOMMY OLIVER STADIUM John Bozarth February 23, 2016.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
P ART A - S TANDARDS A NNUAL ‘A’ B OOK R EVIEW  Conducted by City of Toledo -Division of Engineering Services  Review Typically performed in Q4.
Hummock Pond Road Bike Path Implementation Update January 25, 2012.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
1 Punch list / Close Out - Project Completion Best Practices May 2016.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
City of Johnston NW55th Avenue Improvements Public Open House June 24, 2014.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
2nd Street Drainage and Paving Improvements
Big French Creek Slide Timeline of Events
Hays County Commissioners Court
DICKINSON AVENUE RECONSTRUCTION
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Springbrook Estates Sewer Improvement Area Informational Meeting
Right of Way – Eligible for State Aid Reimbursement
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Participatory Road Program neighborhood meeting Donahoo 174th Street
Request by Councilmember Madison to reagendize the Desiderio Park Design for reconsideration September 17, 2018 Item 17.
Meadow Lane – Brandon Road Improvements Welcome!
URBAN TRAIL PROJECT UPDATES
Walker Street Reconstruction Project 25% Design Public Hearing
Construction Considerations
Robincrest/Elmgate/ Linneman Improvements Welcome!
Southwood/Fargo Country Club Flood Risk Management Project
Ward Park Restroom Timeline
Sacramento Environmental Commission January 2019.
Presentation transcript:

Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012

Agenda  Phase 1 - Project Overview  Phase 1 - Project Status Update  Phase 2 - Project Overview  Phase 2 - Project Schedule  Questions Introduction

Phase 1 – Project Completed June 2012

Phase 1 – Project Status Update  Construction Began October 3, 2011  Project Construction Cost  North Pine Aggregate - $620,000  Completion Date – June 2012  Phase 1 - “To-Do” List/Warranty Items  Minor Grading Around Catch Basins & Area Drains  Seeding  Removal of Erosion Control Devices

Phase 2 – Project Overview Design Considerations  Long Term Stability  Minimizing Encroachment on to Your Property While Maintaining the Long Term Stability  Original Goal was No Encroachment on to Private Property, but it was determined to not be Possible due to Existing Site Limitations  Grading  Level Rear Yards to the Extent Practical

Phase 2 – Project Overview Design Considerations (continued)  Bike Trail  Replace Bike Trail at Generally the Same Elevation as it is was Prior to Construction  Internal Drainage System  PVC Storm Sewer with Concrete Catch Basins  5 Year Design (3.05” in 24 Hours) □ 10 Year Event (3.77” in 24 Hours) □ July 2011 Event (1.18” in 1 Hour)  Three (3) Surge Basins

Phase 2 – Project Overview Flood Protection Levels  Earthen Levee  Flood Stage 43 (1 Foot Below Temporary Levee) □ This is lower than what has been done in other locations in Town due to the Geotechnical Engineer’s findings that the existing material on site has become consolidated due to the temporary levee being in place for the past couple years.  Structural Wall  Flood Stage 45 (1 Foot Below Temporary Levee)  5 Feet Exposed

Phase 2 – Project Overview

Phase 2 Project Overview – Timberline Flood Wall Backfilled Flood Wall with Approximately 7 feet of Exposed Flood Wall Flood Wall Prior to Backfilling

Phase 2 Project Overview – Timberline Flood Wall

Phase 2 – Project Schedule October 2012/November 2012  Finalize Construction Plans and Specifications  Begin Easement Acquisition  Stake Permanent Easements  Meet with the City of Fargo & Ulteig Right-of-Way Agent(s) December 2012  Prepare Project to Present to the City Commissioners for Approval to go to out for Bids  Finalize Easement Acquisition

Phase 2 – Project Schedule January 2013  Advertise & Receive Contractor Bids February 2013  Award Construction Contracts May 2013 – November 2013  Construction

Easement Acquisition Process  Initial Contact (Easement Acquisition Form) □ Donate □ Minimum Payment Policy □ Mutual Agreed Amount □ Appraised  Appraisal Review  Offer with Copy of Appraisal Mailed Out  Closing Set Up  Recording of Documents Phase 2 – Project Schedule

Easement Acquisition Process (Continued)  The City also has an irrigation policy in place that will reimburse the property owner for repairs to their irrigation system that was damaged due to the temporary levee construction.  This policy has a maximum staff discrepancy of $1, Phase 2 – Project Schedule

Questions? Presentation can be viewed at