I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, Project Manager APWA
Construction Schedule
Concept 1 Pavement reconstruction from Keystone Ave. to 4 th St. Keystone Ave. 4 th St.
Existing Pavement Conditions
Concept 2 and 3 Concept 2: Install transportation technology ~ Intelligent Transportation System (ITS) project-wide. Concept 3: Update and replace highway signs and striping project-wide.
Existing Sign Conditions
Concept 4 and 5 Concept 4 Restripe I-80 EB to I- 580 SB on-ramp. Concept 5 Widen Virginia St. WB off-ramp (to two lanes).
Widen E. McCarran Blvd. EB off-ramp Concept 6
Storm Drain System Improvements at Robb Drive EB on-ramp to I-80 Concept 7
Concept 8 Sparks Blvd. NB to WB I-80 Loop Ramp EB to NB triple lefts
Concept 8 C&G
Concept 9 Auxiliary lanes from E. McCarran Blvd to Vista Blvd.
Concept 10 Widen Rock Blvd. EB off-ramp
Concept 11 Widen Robb Dr. WB off-ramp
keeprenosparksmoving.com Traffic alerts Customize your Commute Live cameras Alternate routes Construction info Photos Events
ITS Devices Closed-caption televisions (CCTV) Speed detectors Dynamic Message Signs (DMS) Travel Time Signs Expanded Highway Advisory Radio (HAR). Intelligent Transportation System (ITS) Benefits Improved trip reliability Quicker incident response times to incidents Real-time traffic updates
Project Challenges Ramp metering Traffic switch Fast timeline for paving Sub grade Equipment Weather Sewer Ramp closures Coordination
All design will be complete by December this year. Concept 1: Pavement reconstruction from Keystone Ave. to Fourth St. Construction of I-80 WB will be complete this year Concept 2: Workzone ITS is complete Concept 3: Signing and Striping: WB will be installed this year Concept 4: Re-stripe I-80 EB to I-580 SB ramp. Will be constructed in Concept 5: Widen Virginia St WB off-ramp. Will be constructed in Concept 6: Widen E. McCarran Blvd. EB off-ramp. Will be constructed in Project Status
Concept 7: Storm Drain at Robb Dr. Will be complete this year. Concept 8: Sparks Blvd. loop ramp improvements. Sewer improvements and fill will be complete this year. Concept 9: Auxiliary lanes from E. McCarran to Vista Blvd. Construction will be complete this year. Open Grade? Concept 10: Widen Rock Blvd. EB off-ramp. Concept 11: Widen Robb Dr. WB off-ramp. Construction will be complete this year Landscape and Aesthetics: Will be partially complete this year. Project Status
July 2011
August 2011
September 2011
Night Time Paving
September 2011
EB Overview from Ralston
Balloon Races
Complete I-80 westbound concrete and open to traffic this construction season Open long-term ramp closures: WB Wells Ave. and 4 th St. Concept 7: Robb Dr. drainage improvements Sparks Blvd. loop ramp preparation Construction of auxiliary lanes East McCarran Blvd. to Vista Blvd. I-80 EB paving in 2012 Upcoming
Questions? Thank you! Jeff Lerud, Project Manager