I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.

Slides:



Advertisements
Similar presentations
General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
Advertisements

Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
West Contra Costa Unified School District
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
Design/Build Team for the US 36 Express Lanes Project.
10 miles on I-80 from Robb Dr. to Vista Blvd. Reconstruction through congested downtown Installation of new 10-mile ITS system Preserved Operational Capacity.
Tropicana Avenue To Blue Diamond Road I-15 South Design-Build Project Paving the Way to a More Mobile Las Vegas Presented to Las Vegas Convention and Visitors.
TRANSPORTATION SOLUTIONS: GETTING THE MOST BANG FOR YOUR BUCK! GPA Fall Conference 2013 Garth Lynch, PE, AICP HNTB Corporation October 10, 2013.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
RED LIGHT CAMERAS CITY COUNCIL WORKSHOP NOVEMBER 29, 2011.
US 93 Improvements – Buchanan Boulevard to the Hoover Dam Interchange Transportation Category, Projects $10 Million to $20 Million 2012 APWA Project of.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Definition - CommuterLink CommuterLink is an interagency transportation management system. What does that mean? Put another way, it is the use of computer.
1 Dixie ITS Architecture Study Section ? Utah ITS History.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
Keeping Wisconsin Moving: An Overview of WisDOT’s DMS Travel Times Kelly Langer, WisDOT, Freeway Operations Supervisor.
Current Construction Projects Major Projects Pinellas County.
July 29, 2009 George Saylor, PE ODOT Senior ITS Engineer.
THE I-75 DAYTON RECONSTRUCTION
TRANSPORTATION ENGINEERING Planes, Trains, Automobiles and More Ardrey Kell High School February 23, 2012.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Enhanced 511: Beyond the Basics Jerry Woods Florida DOT – District 5 iFlorida - Automated Message Generation Based on Travel Times.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
PUBLIC HEARING Draft Amendments FY 2011/12 – 2015/16 Transportation Improvement Program (TIP)
FORTIFY……… ……………..I-40 / I-440 NC DOT Project. August 2012 New I-40/440 rebuild project dubbed 'Crawleigh' by NC DOT October 2013 New I-40/440 rebuild.
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
Tennessee DOT SmartWay Update Presented by: Don Dahlinger, P.E. – TDOT September 2006 Presented by: Don Dahlinger, P.E. – TDOT September 2006.
Challenged Detectors – Volume- Occupancy Plots & Maps.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, PE, CPM Project Manager APWA.
1 Using Intelligent Transportation Systems (ITS) Technologies and Strategies to Better Manage Congestion Jeffrey F. Paniati Associate Administrator of.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013.
PROJECT 123(14) LOR PID INTERCHANGE IMPROVEMENT PARTNERING RE-CONNECT MEETING NOVEMBER 19, 2015.
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT Transportation Committee Meeting January 27, 2012.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
MnDOT Intelligent Transportation Systems Project Management Design Course Section 6: Discussion.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
Work Zone & Incident Management Strategies Denise Markow, PE, TSMO Administrator Susan Soucie, PE ITS Project Manager ACEC/NHDOT 2016 Technical Exchange.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
Visit Our Website at: Click to edit Master title style.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
I-84 Baker Valley Variable Speed Limit System
The I-465 West Leg Reconstruction Project
Lynnhaven Parkway Widening Project Update
DICKINSON AVENUE RECONSTRUCTION
IA 122 RECONSTRUCTION PRE-BID MEETING
US26: Cornelius Pass Rd -185th Ave
Highway 169 Bridge Replacement & Pavement Resurfacing
North Main Street Intersection Improvements at Route 460 Bypass
SW Gage Blvd - Street Repair Project
NEVADA TRANSPORTATION CONFERENCE March , 2011 Reno, Nevada
Contract 60X10 Informational Meeting Weber I-55
Metropolitan District | mndot.gov
Presentation transcript:

I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project

I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, Project Manager APWA

Construction Schedule

Concept 1 Pavement reconstruction from Keystone Ave. to 4 th St. Keystone Ave. 4 th St.

Existing Pavement Conditions

Concept 2 and 3 Concept 2: Install transportation technology ~ Intelligent Transportation System (ITS) project-wide. Concept 3: Update and replace highway signs and striping project-wide.

Existing Sign Conditions

Concept 4 and 5 Concept 4 Restripe I-80 EB to I- 580 SB on-ramp. Concept 5 Widen Virginia St. WB off-ramp (to two lanes).

Widen E. McCarran Blvd. EB off-ramp Concept 6

Storm Drain System Improvements at Robb Drive EB on-ramp to I-80 Concept 7

Concept 8 Sparks Blvd. NB to WB I-80 Loop Ramp EB to NB triple lefts

Concept 8 C&G

Concept 9 Auxiliary lanes from E. McCarran Blvd to Vista Blvd.

Concept 10 Widen Rock Blvd. EB off-ramp

Concept 11 Widen Robb Dr. WB off-ramp

keeprenosparksmoving.com  Traffic alerts  Customize your Commute  Live cameras  Alternate routes  Construction info  Photos  Events

ITS Devices  Closed-caption televisions (CCTV)  Speed detectors  Dynamic Message Signs (DMS)  Travel Time Signs  Expanded Highway Advisory Radio (HAR). Intelligent Transportation System (ITS) Benefits  Improved trip reliability  Quicker incident response times to incidents  Real-time traffic updates

Project Challenges  Ramp metering  Traffic switch  Fast timeline for paving  Sub grade  Equipment  Weather  Sewer  Ramp closures  Coordination

All design will be complete by December this year. Concept 1: Pavement reconstruction from Keystone Ave. to Fourth St. Construction of I-80 WB will be complete this year Concept 2: Workzone ITS is complete Concept 3: Signing and Striping: WB will be installed this year Concept 4: Re-stripe I-80 EB to I-580 SB ramp. Will be constructed in Concept 5: Widen Virginia St WB off-ramp. Will be constructed in Concept 6: Widen E. McCarran Blvd. EB off-ramp. Will be constructed in Project Status

Concept 7: Storm Drain at Robb Dr. Will be complete this year. Concept 8: Sparks Blvd. loop ramp improvements. Sewer improvements and fill will be complete this year. Concept 9: Auxiliary lanes from E. McCarran to Vista Blvd. Construction will be complete this year. Open Grade? Concept 10: Widen Rock Blvd. EB off-ramp. Concept 11: Widen Robb Dr. WB off-ramp. Construction will be complete this year Landscape and Aesthetics: Will be partially complete this year. Project Status

July 2011

August 2011

September 2011

Night Time Paving

September 2011

EB Overview from Ralston

Balloon Races

Complete I-80 westbound concrete and open to traffic this construction season Open long-term ramp closures: WB Wells Ave. and 4 th St. Concept 7: Robb Dr. drainage improvements Sparks Blvd. loop ramp preparation Construction of auxiliary lanes East McCarran Blvd. to Vista Blvd. I-80 EB paving in 2012 Upcoming

Questions? Thank you! Jeff Lerud, Project Manager