PROPOSED HOUSING DEVELOPMENT—TWEEDBRIDGE COURT—PEEBLES Forfar East & Old Parish Church Brian Smith, Wellwood Leslie; Graham Kerr, John Duguid Partnership-

Slides:



Advertisements
Similar presentations
AGM 2012 Proposed Redevelopment Proposed Redevelopment of Church Entrance & Foyer APCM 2012 St Peter s Church Bishop Waltham St Peter s Church Bishop Waltham.
Advertisements

Development Strategy nd Consultation. Our Mission To proclaim Gods kingdom and call people to worship God in Streatham To seek to serve our community.
N E W O F F I C E S F O R Electricity Headquarters Jelf Taylor Crescent Old Fort Complex Excerpts from Presentation 1: 15 March 2010.
Berwickshire High School Presentation compiled 15 th October 2009.
Rha RHA Architects Ltd 17. The Diocese of Portsmouth The Improved and enlarged St Joseph Parish Church: Romsey Existing st Joseph Church Location.
Saint Bonaventure Parish Building Our Future and 2012 Pastoral Services Appeal.
Housing Policy – Meeting the needs of all of the community. Michael Kirby Chief Planning Officer Lancashire County Council.
Building Renovations and Improvements College Park Church is engaged in major Renovations and Improvement of its building. This is the first large renovation.
ACCESSIBILITY: A CODE COMPLIANCE AND EXISTING CONDITIONS ASSESSMENT AND SURVEY OF THE LIMERICK TOWN HALL MAIN STREET LIMERICK, ME ttl-Architects LLC 28.
Project Title Eli and Edythe Broad Art Museum Award Category Building.
NEW MERCY CENTER. Dramatic 35 foot tall Bright Silver Building entrance cross. Recognition by custom engraved plaque. This Cross will be up lit at night.
Building Plan Presentation The Evangelical Lutheran Church of The Holy Trinity.
ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.
Building Project Update January Contents Recap Options Order of Cost Where do we go from here?
Leytonstone Refurbishment Update. Leytonstone Library Improvement works beginning! The library will be closed from Monday 20 October 2014 until September.
QMC Option B. Vision Our vision : More people following the way of Jesus Christ Our mission : To strengthen and unify our community through the.
Church Renovation/ Expansion Proposals Willowdale.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
Director of Buildings' Office Slide no.1 January 2010 Trinity College Universal Design Issues Access 2010 Cobble Reduction Access to Historic (Protected)
Hinckley Baptist Church Sanctuary Refurbishment Proposals 2010.
Overview of HMS Facility Planning Educational Specifications Committee November 16, 2005 Educational Specifications Committee November 16, 2005.
St. Peter Lutheran Church East Peoria, Illinois SacredSpace liturgical design consultants What do we want from our building? Architectural Programming.
GATHERED FOR GROWTH SEMINAR Growing within the local community: making local networks work CASE STUDIES.
London Transport Museum Exploring the story of London, its transport system and the people who have travelled and worked in the city over the last 200.
IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
1. 1 3/14/11 Church Conference 14-Mar-11 Welcome and Introduction Opening Prayer Presentation of Building Project Motion to Approve Project Vote on Proceeding.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
This question speaks to primary ownership of the room décor. Will the space be designed for contemporary worship that youth will be allowed to occupy.
March :00pm and 7:00pm Sanctuary. Dedication of current Sanctuary : September 9, 1962 Cost of construction: $650,000.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
March 12, 2015 Ss. John & Paul Catholic Church Feasibility Study.
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
If we build it… Creating and using a flexible teaching and learning space Jennifer Thiessen & Carol Wu Brock University Ontario Library Association Super.
Topic : Places of Worship Y5 visit to Ainsworth Unitarian Chapel and The Parish of Christ Church Ainsworth.
“People feel better in Colt conditions” | feel better in Colt conditions” | Colt International Ltd Smoke control.
Your Birchwood Park Golf Centre and Horizones Health and Fitness Club are changing...
POV Renovations November 14,2014. Repairing the East Wall.
10 December 2015 Campus Master Plan. 10 December 2015 Draft Master Plan Concept Site Development Plan New Facilities Maintenance Building New College.
TDR Conventional Facilities Chapter 7. The site 1.Where the ESS property is located 2.How the property looks today and what kind of activities there is.
Chelmsford Cathedral case study Cathedrals and Climate Change 2 nd November 2009 Daniel Kenning CEng CEnv Principal Environmental Consultant Harrison Group.
Facilities for a Quality Child Development Program Child Services II.
COZYEON Residence Main facilities gallery. Corridor of each floor.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
Unique assets … of Glentrool: 1.Surrounded by forest 2.Local tourist attractions 3.Amazing local scenery and outdoor activities 4.Only village in the.
POSTECH H uman S ystem D esign Lab oratory Chapter 14 LIFETIME HOMES: ACHIEVING ACCESSIBILITY FOR ALL Thu. Kim, Hee-jin.
“Unless the Lord builds the house...” Psalm 127:1 Church Reordering 2016 Appeal Launch.
MASTERPLAN Drivers for Masterplan: There are a number of drivers determining the need for – and direction of a Masterplan covering the entire St.
+ The Future of the Community Centre. + What we did Test the feasibility of running the Centre without the County Council Building survey Consultation.
The Aston Campus 2010 – Topics highlighted in strategy discussions Student Experience What makes Aston special? Connections to the City.
SMITH SCOTT MULLAN ASSOCIATES 1 KING’S PARK PRIMARY SCHOOL FEASIBILITY STUDY STAKEHOLDER ENGAGEMENT 03 February 2016.
St Martin’s Projects “Welcomes you to know Christ and to make Him known” Renovation, Refurbishment & Maintenance Rectory Bathroom and study.
White Pigeon Community Schools
Diocese of Northampton Scott Tallon Walker Architects
Proposed New CMS Conference Room on first floor of SHL
Penn Medicine Chester County Hospital
Cazorla Hotel.
Pre-Contract Cost Control
THE PROPOSED EXHIBITION CENTRE PERADENIYA UNIVERSITY
2007 Bond Issue Capital Improvement Program
Welcome to Gallery Oldham
The following slides show just how this transformation took place.
Westminster House, The Wells Road Centre, Nottingham
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
LEE ACRES CHURCH OF CHRIST TUPELO, MISSISSIPPI
EAST PENNSBORO AREA SCHOOL DISTRICT
PROPOSED HOUSING DEVELOPMENT—TWEEDBRIDGE COURT—PEEBLES
Presentation transcript:

PROPOSED HOUSING DEVELOPMENT—TWEEDBRIDGE COURT—PEEBLES Forfar East & Old Parish Church Brian Smith, Wellwood Leslie; Graham Kerr, John Duguid Partnership- 26 June 2013

PROPOSED HOUSING DEVELOPMENT—TWEEDBRIDGE COURT—PEEBLES Existing Site Plan

PROPOSED HOUSING DEVELOPMENT—TWEEDBRIDGE COURT—PEEBLES Existing Ground Floor Plan

PROPOSED HOUSING DEVELOPMENT—TWEEDBRIDGE COURT—PEEBLES Existing First Floor Plan

PROPOSED HOUSING DEVELOPMENT—TWEEDBRIDGE COURT—PEEBLES Existing Section

PROPOSED HOUSING DEVELOPMENT—TWEEDBRIDGE COURT—PEEBLES Brief Requirements To provide a building that will accommodate a range of community and visitor facilities within the existing envelope of Forfar East and Old Parish Church. Including- Limited external works to formalise ad-hoc car parking arrangements Ground floor alterations to form-  New entrance foyer, reception and exhibition space  New Vestry, with minister’s changing and toilet facilities

PROPOSED HOUSING DEVELOPMENT—TWEEDBRIDGE COURT—PEEBLES Brief Requirements (continued)  Reduced and re-orientated Sanctuary space to seat people- Removal of existing organ and replacement with new electronic organ Removal of fixed pews and replacement with flexible seating Chancel area to accommodate: Communion table Font Reading lectern Space for music group Space for an organ console and audio-visual equipment New audio-visual system  Rationalised circulation routes  Social space for community/congregational use  Feature wall to accommodate existing tablets, scrolls and community art  New lift

PROPOSED HOUSING DEVELOPMENT—TWEEDBRIDGE COURT—PEEBLES Brief Requirements (continued) First floor alterations to form-  Refurbished Small Chapel to accommodate 30 people, a keyboard and audio-visual equipment  Toilets  Storage  Multi-function space  Removal of east gallery to accommodate altered Sanctuary space  Interconnecting stair between Session House and main building  Exhibition/meeting spaces above reception space Limited fabric survey to ascertain extent of any necessary structural works Review and possible upgrading of small power distribution system Review and possible upgrading of domestic hot water, heating and ventilation systems

Proposed Phase 1 Development

Proposed Site Plan