May 3, 2015 1 Northern line upgrade Merton Public Transport Liaison Committee Meeting 26 October 2010.

Slides:



Advertisements
Similar presentations
Consultation on key routes which run parallel to Oxford Road corridor September 2012 Bus priority package.
Advertisements

CityCo, Piccadilly Hoteliers Forum
Journey Management Nigel DAth Journey Manager Bay of Plenty RTIM Seminar 18 March 2014.
Getting the North Up to Speed: On Liverpool, High Speed 2… and High Speed 1.5 Professor Ian Wray University of Liverpool 18 June 2013.
Seven day services in Microbiology. Mark Cioni. Directorate Service Manager (Bacteriology) and Laboratory Manager. Path Links. North Lincolnshire and Goole.
Demolishing Information Silos for the Benefit of Customers Pete Johnston Programme Manager.
Legacy of the 2012 Games Ben Plowden Director of Surface Planning Transport for London.
Metropolitan Transport Strategy The next step – a visual context January 2006 Local Government Association of South Australia.
Wimbledon Station - a station fit for Chris Chowns (Principal Transport Planner) Nick Greenwood (Transport Planning Manager) LB of Merton Transport.
MTF Rail Development Forum
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
THE PLANET99 MODEL DEMAND AND REVENUE FORECASTING TOOL FOR RAIL OPERATORS 8th EUROPEAN EMME/2 USERS CONFERENCE Jeremy Douch GIBB Transport Planning May.
A Very Big Experiment Congestion Charging in London Peter Jones Transport Studies Group University of Westminster.
Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.
Accessibility Unlocking London for All Christopher Upfold Accessibility and Inclusion Manager London Underground.
LONDON UNDERGROUND Презентация к УМК «Spotlight,10»
16 October Transport in Merton Youssef Cockbaine.
Introducing Passenger Focus and local rail services for Peckham Rye Sharon Hedges Passenger Link Manager.
First Capital Connect St Albans City & District Council Overview & Scrutiny (Public Services) Committee 13 July 2011 Neal Lawson Managing Director First.
Examples of Transport for London Campaigns appearing in the Evening Standard for FY’s April 2007-March 2013.
International Conference on Critical Infrastructure Protection Helsinki 4-5 October ‘07 ‘Future partnerships in critical Infrastructure protection’ Charles.
Welcome to London Head of Delivery Planning, TfL Lilli Matson.
Highways and Engineering Savings and Efficiencies Review November 2010.
WORKING IN THE DARK: Citizens Budget Commission October 20, 2009 IMPLEMENTATION OF THE METROPOLITAN TRANSPORTATION AUTHORITY’S CAPITAL PLAN.
High Speed Rail for Nottingham Nottingham City Council June /9/20151.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
Action for business, by business Action For Business – Tameside Friday 30 th November 2012.
Central London Congestion Charging David Hutchinson GREATER LONDON AUTHORITY International Union of Air Pollution Prevention and Environmental Protection.
SKILLS AND INNOVATION - ARE WE ON TRACK? 8 JULY 2015.
Briefing on the Washington Metropolitan Area Transportation Operations Coordination (MATOC) Program Presentation to the Transportation Planning Board Michael.
Enhancing the passenger experience in London with data-driven insights Duncan Horne Transport for London 9 July 2013.
LONDON UNDERGROUND. The London Underground was the first city underground in the world LONDON UNDERGROUND.
1 “Old fashioned” problem solving in a modern railway RSA- 08/01/14 Jo Kaye.
West Anglia Rail Services Hertfordshire County Council Scrutiny Panel 20 May 2010 Geraint Hughes Stakeholder Manager.
Public behaviour issues facing the railway industry Maurice Wilsdon Head of National Programmes, Railway Operations
Gauteng Strategic Plan Update Public Transport GDS 2055 Summit Hishaam Emeran, General Manager: Strategic Network Planning 7 September 2012.
Putting Luas Cross City in context - Public Transport and Sustainable Measures in Dublin Dublin City Council 21 st March 2013 Gerry Murphy.
The London Underground was the first city underground in the world LONDON UNDERGROUND.
First Capital Connect London Borough of Merton Public Transport Liaison Committee Tuesday 26 October 2010.
16 October London Borough of Merton Transport Liaison Robert Pontin.
Rob Shorthouse, Client and Communications Director, ScotRail Alliance SEStran Transport for Regional Growth.
THE LONDON UNDERGROUND. AKA “The Tube” Oldest underground network in the world 270 stations 11 lines 270 miles 3.2 million passengers.
LONDON UNDERGROUND.
Crossrail 2 London Assembly Regeneration Committee.
Crossrail: Station Accessibility Matthew Lodge 10 July 2013.
SARCC Budget and Strategic Plan 2007/08 Portfolio Committee on Transport 28 February 2007 Presented by SARCC CEO: TL Montana.
Data and the future of city mobility Lauren Sager Weinstein – Head of Analytics, Customer Experience Transport for London April 2016.
. David Statham Managing Director. What you told us - Passengers priorities for improvements in Great Britain PASSENGER PRIORITIES.
Northern Transforming Rail Travel in the North Matthew Worman Stakeholder Manager 11 th April 2016.
April 2016 HSR Workshop York 1 Jim Steer Director Greengauge 21 HS2 Objectives “what are the economic, operational (especially capacity and connectivity)
How to Keep a City Moving During: a. Planned Disruption b. Unprecedented Pressure c. The Inevitable!
Land Transport Infrastructure Integration. TfL’s purpose Meet the rising expectations of our customers and users Plan ahead to meet the challenges of.
Transport Committee Leading the way Travelling with a sensory impairment in London.
Industry Briefing 25 May 2016.
Rail North Manchester Airport Transport Forum
Train Performance Challenges
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
Sir Terry Morgan CBE Chairman, Crossrail
Capital Metro Long-Range Financial Forecast ( )
Quantitative Methods Dr. Aravind Banakar –
Quantitative Methods Dr. Aravind Banakar –
Quantitative Methods
Quantitative Methods
Quantitative Methods
Quantitative Methods
Rail Service Update Peter Jermany Principal Planner (Planning Policy)
Update on Accessibility and Transport
Transdev Dublin Light Rail –
FARES DATA BUILD TOOL RICHARD MASON – INFORMATION STRATEGY MANAGER, INTEGRATED AND SMART TRAVEL (IST) PROGRAMMME PUBLIC TRANSPORT AND MAAS FORUM – 9 JULY.
Presentation transcript:

May 3, Northern line upgrade Merton Public Transport Liaison Committee Meeting 26 October 2010

2 Context – London Underground network Tube is key to London’s economic recovery Long term trend towards rising demand: - Nearly 1.1 billion journeys in 08/09 – the highest number ever and over a billion for third year running - 3.5m journeys a day and over 4m on the busiest days

Transformation programme: key elements Most comprehensive investment in decades Line upgrades – overall network capacity increase around 30% Station modernisations and refurbishments bringing improvements to safety and security, accessibility, passenger information and decor Major congestion relief at critical stations like King’s Cross St. Pancras, Tottenham Court Road, Bond Street and Victoria Improving access – step-free access programme eg Morden 3

4 Northern line – overview Busiest line on the Tube network - around 850,000 journeys per day and one sixth of all journeys on network 6 branches - most complex and challenging manually operated railway in Europe Most Northern line stations have been modernised (except where major station upgrade like Tottenham Court Road) Timetable change at the beginning of 2008 transformed performance – Northern line now one of our best performing lines Won a number of awards as a result - including National Rail Award for Commuter line of the year for London and the South East in 2009 Signalling upgrade is the next big improvement planned Prepares the way for further 17% peak capacity increase at end of decade – through partial-separation

5 Northern line upgrade New state-of-the-art signalling and control system, meaning trains can be driven automatically As a result customers have a faster, more frequent and reliable train service: -20% additional capacity - Significant boost to reliability - 18% reduction in journey time Without the upgrade, performance will deteriorate due to life-expired assets and increasing demand meaning greater late running and delay

Where we were in March 2010 The Northern line upgrade was originally being carried out under the PPP by Tube Lines - contractual completion date of January 2012 The programme for the Northern line followed Tube Lines’ delayed upgrade of the Jubilee line The PPP Arbiter said earlier this year that Tube Lines’ programme for the Northern line was already significantly delayed Tube Lines originally proposed an extremely intensive programme to deliver the Northern line upgrade with: -65 weekend closures (50 of which would have affected the south of the line between Kennington and Morden) and; -14 months of early weekday closing on the rest of the line north of Stockwell 6

Where we are now In June 2010 TfL bought Amey’s (Ferrovial) and Bechtel’s shares in Tube Lines making it a wholly owned subsidiary of TfL Our overriding priority since then has been to ascertain the progress of all Tube Lines’ upgrades On the Northern line, we immediately took the decision to cancel the early weekday closures on the line north of Stockwell We then also cancelled the closures on the south of the line We are currently working to come up with a programme that minimises disruption and delivers the work in a way that provides value for money May 3,

Customer and stakeholder communications We seek to give as much notice as possible to stakeholders and customers about closures We will update stakeholders and notify customers as soon as new the programme is confirmed Customer information includes high profile ‘check before you travel’ campaign, information available through, for example: - Train and station announcements and station posters - s to customers - ‘Travel Tools’ section on website: and Journey Planner at: - Articles and items in London media (eg Metro) - Travel information telephone line (24 hours) or customer services (8am-8pm, 7 days) 8

Commitment to making the Tube more accessible London Underground is committed to making the Tube more accessible for everyone Accessibility improvements include: - Step-free access at as many stations as possible for mobility impaired customers - or those with pushchairs and carrying heavy luggage - New trains comply with RVAR (eg District line trains due from 2013) with lower floor height of the trains to reduce the step height between the platform and train to make them easier to board - Localised platforms works will be undertaken at some stations to facilitate boarding/alighting new trains - Tactile strips, visually contrasting handrails, enhanced station PA and on-train announcement for customers with visual impairments; and enhanced visual information for those with hearing impairments - May 3,

10 Accessibility improvements delivered & planned All stations on the Northern line been modernised and refurbished, meaning improvements for visually and hearing impaired customers Over 150 stations have been refurbished/modernised across the network - in Merton includes: Colliers Wood, South Wimbledon and Morden 62 stations have been made step-free – around 15 since 2007 including Morden Seven more stations will become step-free over the next eight years: Tottenham Court Road Victoria Bond Street Blackfriars Farringdon Green Park Paddington (Hammersmith & City) We are working to increase the number of step-free stations over time as funding allows. New District line trains will be RVAR compliant (on network from 2013)

11 Q&A