Q G The ins and outs, the rumors and the reality of a PBS program’s journey to broadcast.

Slides:



Advertisements
Similar presentations
NIMAC Operations: The File Certification Process June 24, 2008 Nicole Gaines.
Advertisements

School TV Studio Idea and Information Exchange Bob Hallett Riderwood Elementary.
Controlled Online Accounting General Ledger and Adjustments.
Program Offer Data Service (PODS) v4 and PBS Reports Michael Hunt, PBS Tracy Carter, Myers Information Systems Susan Farrington, Scout Information Services.
Applying for Tuition Assistance using eTA (Electronic Tuition Assistance Application)
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00021 Date: 30 July 2012 Time: 10:00.
How to create good quality online video. About Previsualisation Ltd Creative Director Robert Finlay Since Technical Director Martin Calder 15.
TFACTS Private Provider Financial/Invoicing Overview 1.
What’s happening at PBS? Jim Kutzner / PBS February 16, 2011.
Q G 1 The ins and outs, the rumors and the reality of a PBS program’s journey to broadcast.
ETravel Authorization / Reimbursement Overview SOLAR Financials x 6685 July 8, 2014.
Adjustment & COCP Barbara Kwok Licensing Operations Specialist.
Summary Maximo is an Enterprise Asset Management System used by Cornell University Facilities Services. Many of Cornell's physical assets found across.
Property Control Asset Forms
Television Production Team. Standard 7.0 Standard Text: Exhibit knowledge of the television production team. Learning Goal: Students will be able to understand.
I/3 Budget FY 2008 Department Request Training Nickie Whitaker Department of Management August 14, 2006.
Navigating and Preparing a HRSA Application Responding to a Funding Opportunity Announcement Sarah Hammond, Grants Policy Analyst HRSA’s Office of Federal.
Records Survey and Retention Schedule Recertification 2011.
PURPOSE OF PAYROLL CERTIFICATION 1 The Payroll Certification is an important tool for Fiscal Officers and/or Delegates. It’s purpose is to allow Fiscal.
1 Production Process - overview  Three major stages of production  Preproduction –Planning, research, writing, organizing  Production –Shooting, recording,
RECORDS AND REGISTRATION FOR DEPARTMENT CHAIRS. TOPICS  Prerequisites  Registration Restrictions  Registration Overrides  Waitlists  Enrollment Capacity.
MERLOT PRESENTATION Northeast State Technical Community College A METHOD FOR ENSURING QUALITY IN ONLINE COURSES Dr. Tom Wallace – Director of Academic.
1 Module 4: Post-Award Administration of Sponsored Projects (Part 1) Office of Research and Sponsored Programs The University of Mississippi 100 Barr Hall.
T. Rowe Price, Invest With Confidence and the Bighorn Sheep logo is a registered trademark of T. Rowe Price Group, Inc. Please dial from.
Allen Hughes State Materials Office
 All new faculty hire cases will need to include the “Proposal to Hire Worksheet” which captures in summary form the essential information necessary.
Relational Databases Melton, Beth “Databases: Access Terminology and Relational Database Concepts.” 09/LPMArticle.asp?ID=73http://pubs.logicalexpressions.com/Pub00.
Pools & Workflow ADMIT. Pools When you first log in the applications will not be visible, you will need to click on a specific Pool to view applications.
The Evolution of the Programming Department Scott Dwyer Program Director KQED San Francisco KTEH San Jose KQET Monterey.
Developing a Monitoring and Pre-Scoring Plan for the Virginia Grade Level Alternative (VGLA) Adapted from the Virginia Department of Education Division.
Administrative Services Workshop May 8, 2008 Overview Classified Hiring ProcessClassified Hiring Process Processing Classified IntentsProcessing Classified.
AWARD MANAGEMENT Post Award By Maria Rojas College of Engineering Manager, Sponsored Programs.
©SHRM 2011 Revising Bylaws Dorothy Knapp, SPHR ▪ Volunteer Leaders’ Webcast Series ▪ April 28, 2011.
CS 501: Software Engineering Fall 1999 Lecture 6 Management I: Project Management.
XTRA Translation Services WBT Localization Projects for IBM Global Services.
Bye-Bye NOLA Michael Hunt VP, Enterprise Applications PBS.
Successful Invoicing Training for Success September – October 2006 Schools and Libraries Division Washington, DC Boston Seattle St. Louis.
3/30/04 16:14 1 Lessons Learned CERES Data Management Presented to GIST 21 “If the 3 laws of climate are calibrate, calibrate, calibrate, then the 3 laws.
Developing Monitoring and Pre-Scoring Plans for Alternate/Alternative Assessments Virginia Department of Education Division of Student Assessment and School.
WELCOME - As you enter the room… Walk around, Read the posted questions, and Use the colored dots provided to select the four questions that are most important.
Careers in TV Review. Executive Producer Provides the funding necessary to produce the program Rarely steps foot on the set Involved in every aspect of.
NIMAC for Publishers & Vendors: Using the Excel to OPF Feature & Manually Uploading Files December 2015.
IEEE Central Texas Section Financial Planning 2016 CTS Fall Planning Meeting San Marcos 29 August 2016 Don Drumtra
Broadcast File Delivery and PBS Media Operations Center
Thesis Defense and Submission 1 Spring  Register for Spring semester  Deadline to submit thesis to GPS: Friday, April 22 nd at NOON  Deadline.
DHHS COE Meeting Agenda February 11, 2010 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update.
Finance Training Preparing for the Audit PVP Council November 13, 2015.
Writing A Grant—From Start To Finish Workshop 5: Submitting Your Proposal—And Beyond! Educational Resource Development LCC Foundation November 10, 2015.
Public Libraries Survey Data File Overview. What We’ll Talk About PLS: Public Libraries Survey State level data Public library data (Administrative Entities)
Records Storage Transfers. LABELING RULE OF THUMB: 5 years from now, if a record is needed and you are no longer working for Allen ISD, would someone.
DHHS COE Meeting Agenda February 16, 2011 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update Group Exercise.
Q G Meeting the TOS Challenges and Solutions Steve Welch and Ernie Steve Welch and Ernie Neumann.
HELP each center use the CRM efficiently Provide a tool to build enrollment and replace enrollment losses. Support Directors and Assistant Directors.
FRYSC Record Keeping 101. Cabinet for Health and Family Services Documentation regarding services provided, referrals made and outcomes achieved must.
Boston Medical Center Provider Onboarding Overview Boston Medical Center Provider Onboarding Overview Bob DeMayo Director, Medical Staff Affairs & Credentialing.
Production Process - overview
Digital Television (DTV)
Award Management Post Award By Ana Ayala College of Engineering Director of Finance.
Employee Self Service – HRS Unclassified Leave
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00021
James SHANNON RA44 – BUD 15 Sept 2010
Chair of Tech Committee, BetterGrids.org
Records and Registration for Department Chairs
Afterschool Meals Training
Editing Picture and Sound
Afterschool Meals Training
Back to the New Basics Schools and Libraries Division
Production Process - overview
Digital Library and Plan for Institutional Repository
Digital Library and Plan for Institutional Repository
Presentation transcript:

Q G The ins and outs, the rumors and the reality of a PBS program’s journey to broadcast

Q G T echnical O perations S pecification Demystified  Panel Wendy Allen, Vice President, Media Operations &Engineering, PBS Tim Mangini, Director of Broadcast/Frontline, WGBH Steve Scheel, Sr. Director of Media Operations Center, PBS Steve Welch, Vice President, Engineering & Technology, NCPB Ernie Neumann, Director of TV Broadcast Operations, NCPB/KQED  TOS Overview  PBS Process to Air San Francisco Public Television Quality Workshop

Q G TOS Overview  Interconnection System was established  Need for common operations -- led to PBS establishing technical guidelines.  Engineering Committee assisted in TOS San Francisco Public Television Quality Workshop

Q G TOS Overview The current TOS (2010) consists of three parts:  Submission to PBS  Distribution from PBS  Real Time Satellite Uplinks San Francisco Public Television Quality Workshop

Q G TOS Overview  The TOS serves PBS member stations.  The ETAC provides advice and guidance to PBS on the TOS.  The ETAC is an appointed Engineering group that represents all PBS regions. San Francisco Public Television Quality Workshop

Q G TOS Overview The 2010 ETAC Committee includes the following members: San Francisco Public Television Quality Workshop Alan Popkin, KLCS Bill Schwartz, WCEU David Felland, MPT Helge Blucher, WTVS James Klas, Wisconsin PTV Kevin Crane, WNPT Ron Kain, WITF Russ Abernathy, WKNO Stacey Decker, Nebraska ETV Steve Welch, NCPB (Chair) Terry Harvey, WSIU Joe Tymecki, VPT

Q G TOS Overview The TOS 2010 Working Group included the following members San Francisco Public Television Quality Workshop Terry Harvey, WSIU (Chair) Bill Schwartz, WCEU Bruce Jacobs, TPT David Felland, MPT Gerry Field, APT Greg Tillou, NETA Kip Campbell, UNCTV Mike Norton, Wisconsin PTV Russ Abernathy, WKNO Steve Welch, NCPB Ernie Neumann, KQED/ NCPB Jim Kutzner, PBS (TOS Lead) Steve Scheel, PBS Wendy Allen, PBS Steve Wynn, PBS Stephen Francis, PBS

Q G San Francisco Public Television Quality Workshop PBS Process to Air Why does it take 6 weeks to get to air?

Legal UCC Associate to Media Program Underwriting Policy Program Scheduling and Content Services MI = Media Inventory (media or content metadata being submitted to PBS) Flattening = Packaging all the components that make-up a show Including Containers submitted separately or bugs, v-chip, etc. BV = BroadView Traffic and Scheduling System PAA = Program Acceptance Agreement OAC = On-Air Offer Clearance IWT = Interactive Web Tag UCC = Underwriter Credit Clearance San Francisco Public Television Quality Workshop Programming PUP Producer MOC NOC Orion: Redbook Forms, including PAA, OAC, IWT, UCC, MI, and Cue Sheet MI/Cue Sheet Review & Approve Tape Tape Arrival Tape Check In Library Pull Lists Run BV MI Completed BV MI Approved BV Package Assembled Packages Scheduled Ingest/Tech Eval Flattening Distribution PBS Edit Producer Edit UCC Review & Approval MTR Screening Result Pass Fail Decision No later than 10 days out Media Operations Center Network Operations Center Over 200 producers deliver content to PBS Red Book Forms Review & Approve

Q G San Francisco Public Television Quality Workshop PUP UCC Associate to Media UCC Review & Approval Process 1.Approve funders and funding amounts 2.Approved funding entered onto PAA (including detail of funding amounts, legal funder names (e.g.,), term dates for funding, total production budget) 3.Form is submitted and approved by other departments (legal, production, rights, etc.) 4.Review spot creative (storyboard, script, graphics) 5.Review UCC form (rotations, spot rights dates per the Containerization requirements ) 6.Approved creative 7.Approved UCC form required for submission of Spot Media Inventory PUP – Program Underwriting Policy

Q G San Francisco Public Television Quality Workshop PUP UCC Associate to Media UCC Review & Approval Process PUP – Program Underwriting Policy Challenges 1.Funding is not acceptable per PBS Guidelines 2.Incomplete funding information 3.Funders listed do not match approved funders/funding from step 1 4.Funding does not equal production budget amount 5.Rights dates are not actual (sometimes completed as rights for program) 6.Unacceptable creative 7.Duration of spot may be incompatible with Containerization 8.Form name, spot title, rights, and/or duration could be incorrect 9.Descriptions of audio and/or video may be inaccurate 10.Spots listed do not match approved PAA 11.Format of pod may be incorrect (spots correct, order incorrect) 12.Cuts on Media Inventory don’t not match UCC format 13.Correct files are not attached to correct records/data

San Francisco Public Television Quality Workshop Legal Programming Process MI/Cue Sheet Review & Approve BV MI Completed BV MI Approved BV Package Assembled Packages Scheduled Screen New Package/MI Submission 1. Package is created/scheduled 2. Media Inventory is submitted 3. If metadata looks correct, media inventory is “approved” 4. If incorrect, producer is contacted and asked to make corrections 5. Media Inventory(ies) are associated to package 6. After package metadata is proofed, package is defined

Q G San Francisco Public Television Quality Workshop Legal Programming Process MI/Cue Sheet Review & Approve BV MI Completed BV MI Approved BV Package Assembled Packages Scheduled Screen Repack Package/MI Submission 1. Need for repackaging is identified (MTR, Producer generated or PBS generated) 2. Method is selected by Producer PBS Fix Producer Fix/Re-submission Containerized repack 4. BV Records are created 5. Notification is sent internally Schedules are updated Program Offers are issued 6. After new revised media is available, steps 2-5 from New Package/MI Submission are followed

San Francisco Public Television Quality Workshop Legal Programming Process MI/Cue Sheet Review & Approve BV MI Completed BV MI Approved BV Package Assembled Packages Scheduled Screen Challenges 1. Late delivery of media 2. Late delivery of Redbook forms UCC OAC PAA Producer format 3. Late delivery of Traffic info GA Embed Grid Kids Embed Chart BMP Monthly filler list Break/Filler Chart Misc. initiatives from PBSd and Interactive 4. Inaccurate metadata Bad cut timings Missing or inaccurate audio metadata Missing or inaccurate aspect ratio 5. Tech Eval failure Requires new record creation and approval/definition Producers often disputes impairments and associated cost 6. Missing billing info (should be populated in PAA.) We can’t approve MI until this is correct

San Francisco Public Television Quality Workshop MOC Tape Arrival Tape Check In Library Pull Lists Run Ingest/Tech Eval Flattening PBS Edit MTR Result Pass Fail Decision Myth: Tape arrives 6 weeks out and the MOC is intentionally waiting until a week out to ingest. Reality: The MOC is ingesting material within 4 days of Media Inventory approved status, it is on the schedule and has been pulled from the library. Library is averaging 24 hours pull time.

Q G PBS Process to Air System Changes being worked on:  Improve Orion, eliminate duplication of data  Decouple process status that are tied together: When media arrives, it will be ingested.  Decouple content and underwriting spots on the same tape. All underwriters are getting approved <10 days before air which holds up the entire show from being ingested. San Francisco Public Television Quality Workshop

Q G Questions