1 of 17 DA0770 - Centralised Stock, BOM & Route Maintenance Last updated: 03-01 DA0770 - Centralised Stock, BOM & Route Maintenance DA0770 Centralised.

Slides:



Advertisements
Similar presentations
Using the Palm Pilot for Data Collection. Overview: These procedures will assist when using the Palm Pilot for: Physical Inventory Counts Bar Code Collection.
Advertisements

How to release MRP planned orders through OBPM MO/PO create and maintain through OBPM Jim Simunek
1 of 29 DA Purchase Invoice Matching to Goods Received Last updated: DA0533 Purchase Invoice Matching to Goods Received DA Purchase Invoice.
Seed Management System Software for the Seed Industry.
User Friendly Price Book Maintenance A Family of Enhancements For iSeries 400 DMAS from Copyright I/O International, 2006, 2007, 2008, 2010 Skip Intro.
Using XA Browser/Power-Link Preferences to Improve Efficiency
What is New in Inventory & Purchasing? Presented by: Derek Kratz.
Advanced Order Copy with Online Availability Checking An Enhancement For iSeries 400 DMAS from  Copyright I/O International, 2005 Skip Intro.
Vendor Analysis. 2 of : Vendor Analysis / DA0199-w1 Last updated: Vendor Analysis Information in Inventory Control Introducing numerous modifications.
1 of : Multi-Currency Payments / DA0813 Last updated: Project Walkthrough: Multi-Currency Payments Multi-Currency Payments.
1 of 39 DA1245 Enhanced Transaction Tracking Last updated: March-2009 DA1245 Enhanced Transaction Tracking.
1 of 30 G/L Journal Authorisation / DA00594-w1 Last updated: G/L Journal Authorisation.
ICEPU – IC ENTRY PHSYICAL UPDATE Use this function to update or clear the completed runs after you complete entry and reconciliation. Post the adjustments.
User Friendly Item Maintenance A Family of Enhancements For iSeries 400 DMAS from  Copyright I/O International, 2006, 2007, 2008, 2010 Skip Intro Exit.
Last Updated: March of 55 DA Sales VAT Postings.
1 of 90 DA Supplier Contracts Last updated: DA Supplier Contracts DA0534 Supplier Contracts.
1 of 20 Lot Attributes & Pallet Numbers / DA w1 Last updated: Lot Attributes & Pallet Numbers.
1 of 23 DA1236 Prepayments Last updated: March-2004 DA1236 Prepayments.
1 of 24 G/L Journal Text Extensions / DA0583-w1 Last updated: G/L Journal Text Extensions.
Top Reasons why users call ECCA. Agenda Reason for the call: What is the question or problem? Reason for the call: What is the question or problem? Answer.
Inter-Warehouse Transfers An Enhancement For iSeries 400 DMAS from  Copyright I/O International, 2004, 2005, 2007, 2010 Skip Intro.
Bar Code Assisted Receiving and Put-Away
1 of 16 DA Bin Movements Last updated: DA Bin Movements DA0771 Bin Movements.
1 of : Multi-Currency Receipts / DA0814 Last updated: Project Walkthrough: Multi-Currency Receipts Multi-Currency Receipts.
User Friendly Customer Ship-To Maintenance A Family of Enhancements For iSeries 400 DMAS from  Copyright I/O International, 2006, 2007, 2008, 2010, 2011.
PM Bills of Material Getting the Most Out of BOMs Session 3604
The Production Process
MATERIALS STAGING AND TRACKING Session 3605 Gary Zien Bayer Corporation Pittsburgh PA.
1 of 9 DA1243 A/R Reminder Letter Enhancements Last updated: March-2004 DA1243 A/R Reminder Letters Enhancements.
1 of 19 VAT on Core / DA0483-w1 Last updated: VAT on Core.
David Warne Independent Manufacturing Consultant.
1 of 16 DA Enhanced Warehouse Management Last updated: DA Enhanced Warehouse Management DA0744 Enhanced Warehouse Management.
User Friendly Vendor Maintenance A Family of Enhancements For iSeries 400 DMAS from  Copyright I/O International, 2010, 2011 Skip Intro Exit.
1 of 22 Consolidated Requisitions / DA0682-w1 Last updated: Consolidated Requisitions.
1 of 55 DA0514 Extended Discounts Last updated: June-2002 DA0514 Extended Discounts.
TRW Code Updates Planned for ERD Activity in Windchill CRS User Help Guide for New System Changes October, 2005 TRW Automotive September, 2005 TRW Automotive.
ICP Kit 2011 HHC Data Entry Module The World Bank ICP Kit Training African Development Bank.
Enhancements From R6, R7.x to R9 Enterprise Product Data Management (EPDM) David Kemp
FlexGen Trustee Review Class In this session we will review dashboard receipting, troubleshooting day end issues, pitfalls of assessment changes, adding.
EMS Supply Chain Management System. Why should this be important to you? There is a growing use of EMS as a front door to healthcare in the US EMS is.
1 of 26 DA930-Project Enquiry Enhancements Last updated: December 2001 DA Project Enquiry Enhancements/Project Issues from Stock Improvements.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Warehouse Report. Log into EDS using your Address/User Id and Password. If you have forgotten your password, click on the Forgot Password? link.
State of Kansas Travel Authorizations Statewide Management, Accounting and Reporting Tool Entering a Travel Authorization Navigation: Employee Self Service.
Troubleshooting in MDS. Overview Order Entry Alerts / Holds Invoicing Holds Drop Ship Purchase Order Creation Alerts End of Day Process End of Day Error.
Slide#: 1© GPS Financial Services Revised 05/03/2009 cms 2 RW Rep-AP-CashReq.Report ™ Cougar Mountain Software Professional Version.
 SAP AG 2007 Production Maintaining bills of material (BOM) Production process Contents:
 SAP AG 2003 Production Maintaining bills of material (BOM) Production process Contents:
New Millennium Enhancements SEE HANDOUT. Release 2002 Improved record editor Easier to navigate to NEXT and PREVIOUS records (Ctrl [ and Ctrl ]) More.
Student Fees A-Z. Ed Kobus This document contains confidential proprietary trade secret information of SunGard K-12 Education. This file is not to be.
Meditech 6x Pharmacy Medication Stock Charges. What is a Stock Charge? The Enter Stock Orders routine in Pharmacy allows you to enter the doses for medications.
Item Features and Options An Enhancement For iSeries 400 DMAS from  Copyright I/O International, 2003 Skip Intro.
Templates. Several options available when using Templates.
Order Inquiry RLM System. Page 2 What is Order Inquiry? Customer Orders that arrive in RLM (either via EDI or Data Entry) can be viewed using the Order.
Purchase Orders Notes:.
1 Parts/Merchandise Inquiry. 2 There are two methods to finding information in the parts/merchandise file. Searches can be performed on the following:
Invoices and Service Invoices Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
© 2015 Ex Libris | Confidential & Proprietary Yoel Kortick Senior Librarian Cataloging introductory flow.
Spanish internet ordering system – Slide 1
Compatible with the latest browsers; Chrome, Safari, Firefox, Opera and Internet Explorer 9 and above.
To add a new requisition, enter an 'a' here
Requisitions from Stock
Version Control Master Data
06 Master Data – Item
09 Calculation
NextGen Purchasing Calendar Year End 1099 Process
DA0492 BOM /Route Supersessions & Alts.
Two methods to observe tutorial
Powerful Tools for Tracking Your Inventory
Two methods to observe tutorial
Presentation transcript:

1 of 17 DA Centralised Stock, BOM & Route Maintenance Last updated: DA Centralised Stock, BOM & Route Maintenance DA0770 Centralised Stock, BOM & Route Maintenance

2 of 17 DA Centralised Stock, BOM & Route Maintenance Last updated: Master-Slave Relationships

3 of 17 DA Centralised Stock, BOM & Route Maintenance Last updated: Master-Slave Relationships This option allows you to define a master-slave relationship for each stock code and its associated bill of material, and route To select the default fields to be copied from the master to the slave warehouse, leave the Slave warehouse code blank and select F8-Stock Place the cursor on the required field using the ARROW keys then select F8- Toggle to switch the Copy value from n to y You can select F8-Toggle to deselect the field, if required To confirm the selected fields, select Enter-Amend

4 of 17 DA Centralised Stock, BOM & Route Maintenance Last updated: Master-Slave Relationships Next, type in or use F2-Browse to select a Slave Warehouse Code and select CR-Accept to display this window To amend the default fields to be copied to this slave warehouse, select F8-Stock

5 of 17 DA Centralised Stock, BOM & Route Maintenance Last updated: Master-Slave Relationships This Popup window informs you that the default fields are being copied to the Slave warehouse - select CR-OK to continue

6 of 17 DA Centralised Stock, BOM & Route Maintenance Last updated: Master-Slave Relationships To amend the default fields, place the cursor on the required field using the ARROW keys, then select F8-Toggle to switch the Copy value

7 of 17 DA Centralised Stock, BOM & Route Maintenance Last updated: Master-Slave Relationships To confirm your amendments, select Enter-Amend

8 of 17 DA Centralised Stock, BOM & Route Maintenance Last updated: Master-Slave Relationships Set the Update mode flags as follows: N if the item is not to be updated when you run the Master-Slave Update Y to update the item when you run the Master-Slave Update C to update the item when you run the Master-Slave Update or create a new record if the item does not exist Set the Update mode flags as follows: N if the item is not to be updated when you run the Master-Slave Update Y to update the item when you run the Master-Slave Update C to update the item when you run the Master-Slave Update or create a new record if the item does not exist Then type in or use F2-Browse to select a Master Warehouse – select CR-Accept to save the master-slave relationship You must now run the Master-Slave Update to update the slave stock, bill of material and route items in line with their associated master items

9 of 17 DA Centralised Stock, BOM & Route Maintenance Last updated: Master-Slave Update This option allows you to update the slave stock, bill of material and route items in line with their associated master items Type in a start and end Warehouse range – alternatively, leave both fields blank to update ALL warehouses Leave the field Report Level set to F (full) to produce a detailed report of the warehouses and stock codes processed, plus a list of fields to be updated for each warehouse Alternatively, type in one of the following: D to produce a detailed report of the warehouses and stock codes processed, plus any errors S to produce a summary report of the warehouses, plus any errors Leave the field Report Level set to F (full) to produce a detailed report of the warehouses and stock codes processed, plus a list of fields to be updated for each warehouse Alternatively, type in one of the following: D to produce a detailed report of the warehouses and stock codes processed, plus any errors S to produce a summary report of the warehouses, plus any errors To run the master-slave update and produce the audit report – select CR- Accept

10 of 17 DA Centralised Stock, BOM & Route Maintenance Last updated: Master-Slave Update The progress of the updates are displayed – the audit report is produced when the run has finished Warning: If you set the Update mode flag in the Master- Slave Relationship to C to create stock items and only have some fields flagged for copying, you might find the resulting stock item is 'invalid ’ – error messages will be displayed during stock transactions or when updating the stock record via Full Stock Details

11 of 17 DA Centralised Stock, BOM & Route Maintenance Last updated: Master-Slave Update Results

12 of 17 DA Centralised Stock, BOM & Route Maintenance Last updated: Full Stock Details

13 of 17 DA Centralised Stock, BOM & Route Maintenance Last updated: Full Stock Details - Item in Slave Warehouse The bin number has been left blank as this particular field was set to N in the Master-Slave Relationship (see slide 8) This product has been created in the slave warehouse The bill of material and route items are updated in association with their master items if the Update mode flag was set to Y or C for the Master-Slave Update run

14 of 17 DA Centralised Stock, BOM & Route Maintenance Last updated: Full Stock Details - Item in Slave Warehouse If you try to update a stock item in a slave warehouse this message is displayed as a warning before the stock details are displayed – you can make updates to the item but these might be overwritten when the next Master-Slave Update is run This warning is also displayed if you try to amend a Bill of material (via the option Assemblies), or a Route (via the option Routes), if the bill of material or route is in a slave warehouse

15 of 17 DA Centralised Stock, BOM & Route Maintenance Last updated: Stock Valuation

16 of 17 DA Centralised Stock, BOM & Route Maintenance Last updated: Costed Bills of Material You can choose your Costing method using this new field: S for standard costs C for current costs E for expected costs You can choose your Costing method using this new field: S for standard costs C for current costs E for expected costs This report has been enhanced to allow you to compare different costing methods without affecting your live system You can now report upon the overall change in the proposed stock valuation based on an alternative cost to the cost defined in the system key STCOSTTYPE For each item revalued, the total cost of the revaluation is calculated as: Change in Cost * Quantity on Hand You can now report upon the overall change in the proposed stock valuation based on an alternative cost to the cost defined in the system key STCOSTTYPE For each item revalued, the total cost of the revaluation is calculated as: Change in Cost * Quantity on Hand

17 of 17 DA Centralised Stock, BOM & Route Maintenance Last updated: Product Revaluation Leave this field set to S to calculate costs based upon the standard costs for stock items To run the revaluation based on the current costs or expected costs for stock items type in: C to run the revaluation based on the current costs for stock items, or E to run the revaluation based on the expected costs for stock items Leave this field set to S to calculate costs based upon the standard costs for stock items To run the revaluation based on the current costs or expected costs for stock items type in: C to run the revaluation based on the current costs for stock items, or E to run the revaluation based on the expected costs for stock items The Bills of Material Product Revaluation has been enhanced to allow revaluation based on current costs or expected costs Note: You are advised to run the Costed Bills of Material report prior to revaluing your stock