ROFI – Next Generation – DAREL By Mike Pluma. Objectives For New Design: – Main objective: move toward Dynamic Balance Raise center of gravity by moving.

Slides:



Advertisements
Similar presentations
MO-735 Overlock Dealer Training CLICK.
Advertisements

Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Adjustable Head Strap Instructions Step 1: To adjust the head strap hold goggle as above.
Optical Manufacturing Solutions 1 Probe Assembly.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Trinity Highway Products Properly Installed SRT Post HBA System-Slotted Rail Terminal
Leg Assembly A step-by step guide to the disassembly and service of a HUBO leg.
Step 12 Here is the issue…..the mount for the throttle arm is pushed up against the side of the housing. The problem with this is it allows (due to alignment)
Typical Walk-in Closet with elfa® décor
Supermicro © 2009Confidential MCP N installation guide Rech Weng.
Fabrication of Fishtank Platform EAS 199B living with the lab.
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Mer/Sup. 2 & 3 Door Evaporator Coil Repositioning Procedure S. Starnes 7/11/03 1. Remove the 2 screws holding one end of the evaporator coil. (view shows.
This is a sequence shot of a home run by Albert Pujols off Roy Oswalt of Houston in the 2005 NLCS, both side and front views. You can start it by pressing.
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Robot Build IT Girls Allowed 2014 Updated 14 th August.
• Open a new part file • Create Cylinder
Design and Implementation of Metallic Waste Collection Robot
Showing Demonstrations on the TV How to connect the camera to our TV set.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
Sony Handycam Instructions Directions Written By: Stephen Hall, Student Technical Assistant Ms. Miri Kim, Director of Instructional Design and Technology.
General Instructions for “KidWind Light” wind tunnel.
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Overview 2 DOF in Head 4 DOF/Arm 1 DOF in Torso 6 DOF/ Leg.
7.2 V battery pack and charger Put the battery in the charger station at the end of the lab. period. Red light indicates charging. Ken Youssefi Introduction.
This is a fold-down clothes bar that will hold up to 12 plastic clothes hangers or even more wire hangers. As I don’t have a trailer wall to put it on,
Figure 12.1 The UP1-bot. Figure 12.2 Left: Radio Control Servo Motor and Right: Servo with Case and Gears Removed.
Using Stress Analyzer for Tensile Testing © 2012 Project Lead The Way, Inc.Principles Of Engineering.
Motion Constraint Train Down the Track. Apply Angle Constraint to Workplanes Train is assembled at this point. Place a Workplane through the center of.
 PROFESSOR: CHARLES KUNG  GROUP MEMBERS: AKRAM GERIES, JEEVEN HUGH, MICHAEL LADAS, BRAD LONG.
What do I have to do? Cause a motor to turn the center arm. attach motor to frame can redesign the center arm piece as needed use bushings or bearings.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
Port Throttle Solution Does your port throttle drop back when you remove your hand. Here is the fix….and it costs nothing! me with any questions:
Presentation by ANAS AHMAD ME1 B1 batch Submited to
SHAPER, SLOTTER & PLANER SUBMITTED TO PROF. DEEPAK SHARMA SUBMITTED BY ANKIT SHARMA ME-I (III YEAR)
Designing a Next-Generation Surgical Robot Activity.
Flip Video Camera Information By Tabatha Swann & Greg Perry.
 Definition of Micro-Controllers  Comparison between types of Micro- Controllers  Pin Identification of ATMEGA32.
Forging new generations of engineers. USING THE STRESS ANALYSER FOR TENSILE TESTING.
Introduction to VEX® components
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
LESSON 04 Starter Key words: Programmable, environment, design, manufacturing and application Modelling VEX Tumbler solutions In this lesson you are.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
WeldingRod’s Exactly Constrained 3D Printer Plate Identification and Stuffing.
How to model a plate with 3D Experience?. Creating a part 7 create a contour with PowerCopy: contour motor board relative to the left. 6 create a contour.
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Completed Front and Rear Standard 10 ½” 1 ½” 3 ¼” 4 ½” 1” ¾” 1 ½” 6” ¾” Channel Length: 5 ¼”, ¾” from end.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
VIEW SERIES with Sliding Door
Shaft Replacement Standard Operating Procedure
Activity 4.2.8a Satellite Flight Satellite Robot Construction Guide
Easy centering and setting system
Deconstructing a Hubsan and Rebuilding
Brendon Knapp, Edmund Sannda, Carlton Allred, Kyle Upton
LESSON 04. LESSON 04 LESSON 04 STARTER Modelling VEX Tumbler solutions In this lesson you are going to adapt and improve your virtual CAD VEX Tumbler.
LCD Splicing Screens Wall-mounted Guide
SCOUTBOTICS Engineering Notebook
EC Assembling with Assembly Stand of THU
Using Stress Analyzer for Tensile Testing
171-SH SH Box with Pre-Installed 101⁄2" Pigtail Popular 4" square boxes and switch boxes Pre-installed 101⁄2" insulated grounding.
Mounting a BalanceBox®650 to a brick wall
FlySpy Packaging Consideration
Activity 4.2.8a Satellite Flight Satellite Robot Construction Guide
SENSORS.
SCOUTBOTICS Engineering Notebook
Presentation transcript:

ROFI – Next Generation – DAREL By Mike Pluma

Objectives For New Design: – Main objective: move toward Dynamic Balance Raise center of gravity by moving the batteries out of the feet Re-design the foot – To address lack of battery – Narrower foot-print (instability) – "Organic Curves“ – Secondary Objective: Incorporate internal phone sensors Re-design "Head" – Re-orient phone to take advantage of back camera (if available) – Devise mount system to adapt to size of available phone (upgrade capable) – Make room for Batteries, Ultrasonic/IR sensor, Gyro (if available) – "Organic Curves"

Execution of Objectives Parts List: – Uniform Foot – Head Bottom – Phone Bracket Left – Phone Bracket Right – Head Sides – Head Top – Head Dome + Body Riser from Original ROFI

Uniform Foot Same model for both left and right Thicker walls around bearing holes Narrower Footprint “Organic Curves”

New Head

Head Bottom Attaches to Original ROFI “Body Riser” Arduino Mega Mounts Battery body stops Slot mount for Ultra Sonic Range Finder Sliding Phone Bracket Mounts

Sliding Phone Bracket 2 Piece Bracket Adjusts from 48mm-105mm wide 60mm side walls support phone in a vertical orientation Non-slip inserts “Organic Curves” Phone Side Screw side

Head Sides Shell pieces attach with ‘tongue-and-groove’ plus screws Holes to accommodate – Ultra Sonic RF “eyes” – Servo Power Switch – Servo Power Fuse – Arduino Power – Arduino USB

Head Top Attaches to Head Sides and Head Dome via Tabs and screws Notch to accommodate USB from USB shield

Head Dome Attaches to Head Sides and Head Top via grooves and screws Under side Top side

Looking Forward Phone with Back or Front Camera Phone with internal Gyro Use Phone camera for Range Finder Entire assembly may be rotated 180° for phone with Front Camera

Other Models Archos7 Phone Arduino Mega 2560 Arduino USB Shield ROFI Battery Ultrasonic RF