ADI Industry Briefings July 2005. 2 What we are ADI is Australia’s leading defence company ADI provides a greater range of defence technologies and services.

Slides:



Advertisements
Similar presentations
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Advertisements

Evolution of Parametric Analysis within Rolls-Royce Purchasing
Food Parks Initiative FAO/AGS Presentation on the basic concepts in ‘Food Parks Initiative’ for discussion, Strategy with Rome- Based Food Agencies Organisation”
Organizational buying behavior Presentation created by Mag. Maria Peer based on the lecture BBM1 – Marketing Mag. Andreas Zehetner FH Steyr.
The Engine Driving Business Management in Project Centric Environments MAGSOFT INTERNATIONAL LLC.
Adrian Cook, Group Head of Procurement
About Accenture Panel 3.
ITIL: Service Transition
Training Institute of Public Administration Tirana, ALBANIA
I/ITSEC Orlando, 2012 Stefan Klaes VP Sales Management Rheinmetall Defence.
Noventus Why We Are Different  Demonstrated client focus guarantees better outcomes and superior value for money customised solutions  A successful track.
David Walker Head of Procurement & Property Services, Aegon UK.
MBA (Trimester) Term V Module Title : Project Finance and Management
Supply Chain Management
Viewpoint Consulting – Committed to your success.
SEA1000 Industry Briefing David Gould General Manager.
Purchasing Fundamentals & Role Integration with MM in today context H.A. Nuwan Amila Index No. GDPSCM 12-15/27.
DRIVING INNOVATION AND ABILITY TO COMPETE THROUGH OUTSOURCING Anthony (Tony) C. Bernardo, Alloy Polymers Inc. NPE 2003 bernardo:
Construction Management Practice Implications of the Theory of Construction Management.
HDA’s revised strategic direction and Annual Performance Plan 2013/14 March 2013.
© 2010 Colt Telecom Group Limited. All rights reserved. Next Generation Data Centre Design Akber Jaffer 2.
Human Resource Management Gaining a Competitive Advantage
1 RICS The Royal Institution of Chartered Surveyors London Quantity Surveying & Construction Faculty The Built Environment Group Corporate Professional.
1 COMBAT VEHICLES SUPPORT INITIATIVE (CVSI) Industry Day Briefing Defense Supply Center Columbus 16 Oct 2007.
MultiMedia by Stephen M. Peters© 2002 South-Western Operations Management.
Managing Procurement and Sourcing Getting What You Need.
Construction Category Management Planning Version 1.1 (May 2015)
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
Introduction and Overview ‘TfL and the Primes MOU’ Tessa Staniforth Health, Work and Welfare Reform Nov 5 th 2012 Andrea Fozard Supplier Skills Project.
Acquisitions, a Publisher’s Perspective Craig Duncan Development Manager External Development Studio Building the partnership between.
Leaders in Technology & Innovation ISO 9001:2000 & AS9100 Certified.
Supply Chain Management Common Learning Block I Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the.
Nurjana Technologies Company Presentation. Nurjana Technologies (NT) is a small business enterprise founded in 2012 and operating in Aerospace and Defence.
Noventus Why We Are Different  Demonstrated client focus guarantees better outcomes and superior value for money customised solutions  A successful track.
 Construction company „RAVEL” dates back to 1990’s and was started initially as company „KAVDRATMETRS PLUSS”. In 2008 through the process of reorganization.
NOVEMBER SHIPBUILDING AND SHIP PROCUREMENT FOR THE SPANISH NAVY BRIEFING FOR: SCHOOL OF POLICY STUDIES QUEEN'S UNIVERSITY BRIEFING FOR: SCHOOL OF.
The Engine Driving Purchasing Management in Complex Environments MAGSOFT INTERNATIONAL LLC.
Industrial Engineering Roles In Industry
The Business Research Company Manufacturing, Transport and Defence.
© 2007 Centre for Public Agency Sustainability Reporting Action and Engagement in the Marketplace – the Role of the Public Sector with CSR and Sustainability.
Chapter 1 Management accounting: information for creating value and managing resources Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides.
CE 726 STRATEGIC CAPABILITY. ASSESSMENT OF STRATEGIC CAPABILITY.
North East Lincolnshire Council delivering change through partnership ( Physical Regeneration, Property and Technical Services Partnership) Planning in.
Partnering. The West’s response to Japan’s greater efficiency in major manufacturing industries Japan’s approach is based on cooperative, long term relationships.
Injury Prevention and Injury Management A system of processes that targets workplace physical injury reduction.
VIIP Proposal Preparation Workshop November 3, 2015.
Copyright © 2013 McGraw-Hill Ryerson Limited Slides by Sam Lampropoulos, George Brown College CHAPTER 13 Global Sourcing and Procurement Global Sourcing.
Oklahoma Small Business Manufacturing for Aviation Conference Presentation - Subcontracting August 10, 2005 Nathaniel Stevens Sr. Systems Engineer.
Careers in Distribution, Copyright 2005, WERC Careers in Distribution Management Jobs.
Industry’s Perspective on Industry-University Intellectual Property External Research Directors Network Industrial Research Institute, Inc. April 17, 2001.
Management Approaches. Construction Management Customer appoints Design team and Management team.
Workplace injuries are at least a 50 Billion dollar problem in Australia. Work Safe Australia.
1 BUDGET VOTE 19: DEPARTMENT OF DEFENCE 10 June 2009.
THE JOINT FORCES OF CSIRO & SCION Ensis – Joining Forces for Trans-National Benefit.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Founded in 2005 by four directors from the Automation and Control Industry Applied Integration UK are an independent, Stokesley based solutions provider.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Natalie Stirling-Sanders Procurement Sustainability Manager September 8 th, 2015 – SPE Lunch Mexico Local Content.
Growth through investment. Introduction to Bibby Line Group Started as a family- owned shipping business on 1807 Group now includes logistics, financial.
Washington DC 14 December 2009 Standardization Power Christopher Loeser Distribution Statement A: Approved for Public Release.
Unit 4: Impact of the Use of IT on Business Systems
ITIL: Service Transition
Subtitle Statement of Capabilities.
Corporate presentation
Rear Admiral Mark Campbell RAN Rtd
Supply Chain Management Principles
CHAPTER 5 TECHNICAL ANALYSIS.
Master of Science in Management Science
Lockheed Martin Canada’s SMB Mentoring Program
Purchasing and Supply Chain Management
Presentation transcript:

ADI Industry Briefings July 2005

2 What we are ADI is Australia’s leading defence company ADI provides a greater range of defence technologies and services to the Australian Defence Force than any other Australian company ADI, through its predecessor organisations in Australia, can trace its origins back to the 1880s (Colonial Ammunition Company).

3 Evolution of the Company - History Naval/marine Engineering Garden Island, NSW established (1913) Small Arms/ Light Engineering Established Lithgow NSW (1912) Engineering & Vehicles Established Bendigo VIC (1943) Propellants and Explosives Established Mulwala NSW (1943) ADI Limited corporatised (1989) Colonial Ammunition Company established (1889) Software Engineering & Manufacture Acquired Universal Defence Systems Perth (1991) Munitions & Explosives Restructured this business, established Benalla VIC (1996) Electronics/ Communications Acquired Stanilite Sydney (1996) ADI privatised New owners Transfield and Thales (1999) Electronic Warfare Acquired Advanced Systems Adelaide (2001) Present Structure Naval Electronics & Aerospace Land - Ordnance Land - Engineering & Vehicles Services & Security Naval Established as large scale naval prime contractor (Minehunter contract 1994)

4 Joint Venture Owner - Transfield Holdings Joint owner of ADI Has developed over $6 billion of private infrastructure Major Australian private company with focus on infrastructure development and outsourcing Businesses throughout Australia, New Zealand and South East Asia One of Australia’s most successful owner/developers of infrastructure and related markets.

5 Joint Venture Owner - Thales Group Joint owner of ADI Main businesses: Aerospace, Defence, Security and Services Providing: Prime Contracting, Lead Systems Integration and Equipment More than $20 billion annual turnover worldwide More than 50% turnover and 50% of employees outside France Thales in Australia Turnover is $1 billion, 3,500 employees A global leader in defence systems and security

6 Our Competitive Edge ADI has the financial, technology and human resources to meet our Defence and commercial customers’ current and emerging requirements and to provide a long-term strategic partnering role. Capability edge in: Prime Contract Management Lead System Integration Systems Engineering Specialist Manufacture and Heavy Engineering Research and Technical Development In Service Support Through Life Support Training our people

7 Business Group - Naval FFG upgrade Naval shipbuilding Naval combat systems Naval in service support Commercial maritime support Marine engineering Mine countermeasures Weapons systems Naval programs

8 FFG Upgrade Project Upgrading the four newest FFGs to ensure they are effective against potential threats to at least 2013 New, modern combat system ADACS (Australian Distributed Architecture Combat System) Most sophisticated enhancement of Australian warships in Australia

9 Minehunter Ships Prime contractor Produced six world leading Minehunters for RAN Responsible for detailed design, construction, outfitting, systems integration, testing and trials In-service support

10 FFG Test Centre Land based test site at Garden Island First time that development of a warship combat management system has been done by an Australian company in Australia

11 Military Vehicles - Bushmaster 299 vehicles for ADF Developed by ADI High mobility Integrated protection against anti- tank mines, improvised explosive devices, mortar fragments and small arms fire Deployed with ADF in Timor and more recently in Iraq

12 Military Vehicles - HMEV Developed by ADI Operationally proven with US and Australian armies World’s fastest military tractor - up to 100km/h Equipped with front-end loader, backhoe and other engineering attachments

13 Specialist Vehicles - FireKing Developed by ADI Based on Bushmaster vehicle platform Currently in production for ForestrySA Has unique crew survival cabin tested by CSIRO

14 Marine Gas Turbine Modules for General Electric Components made for over 390 LM2500 modules ADI/GE relationship spans 15 years First module completed for new generation LM2500 and autoderivative gas turbine engine Developed jointly by ADI and GE

15 Ammunition Manufacture 40 main product lines including: Small, medium and large calibre ammunition Grenades and aircraft bombs New 25mm ammunition production line commissioned Technical data packs Maintained for ADI & ADF

16 Summary Major share of Australian defence market Strong track record in managing high technology projects Good, ethical reputation Attuned to customers’ technology needs and long-term aspirations Range of leading products and technologies Excellent technical skills base Proven strength and commitment

ADI PROCUREMENT POLICY

18 ADI Main Sites 16 Sites (Incl. 8 major Sites) 2,600 Staff 8 Purchasing Locations 50 Purchasing Staff 4,000 Suppliers Perth Sydney Darwin Brisbane Nedlands Garden Island City Centre Benalla LithgowMulwala Melbourne Hobart City Centre Newcastle Adelaide Bendigo Canberra

19 Purchasing Segments Mechanical Sub-Contracting & Lasers Mechanical Components Electrical Equipment Sub- Contracting Measurement Equipment Production Equipment Site Maintenance & Operating Human Resources Supplies Communications E-Procurement/Small items Travel Shipping & Packaging Training Hardware Software Intellectual Services Components ( Including Cables) Bare PCB’s GENERAL EXPENSES ELECTRONIC COMPONENTS INDUSTRIAL (Manufacturing) INFORMATION & TECHNOLOGY

20 Group Purchasing Policy Identify and develop dependable and highly efficient suppliers to obtain the right level of performance that matches our customers needs. Initiate real supplier collaborative relationship. Having key target suppliers whilst retaining a degree of diversity and openness towards the market. Achieve optimum value for all Procurement Activity by selecting products and services that meet our requirement. Competitive target suppliers will be treated fairly, information about them will be kept confidential, and their intellectual property rights will be protected. Conduct all business dealings in an ethical and professional manner.

21 The Purchasing Function Involvement of Purchasing at Bid Level and Conception Level Acquisition of all goods, materials and external services required for the running of the business Contribute positively to the financial performance of ADI Purchase at prices that are fair and reasonable for ADI and our suppliers Open minds on new methods and procedures for procuring goods and services Actively involve suppliers at the early stages of new products and bids Install Suppliers Performance Management Capability

22 Benefit of Early Procurement Involvement Capacity to influence costs Process Available technical solutions Potential suppliers Defined goals Tenders Selection of suppliers Coordination of logistics and administrative Purchasing tasks Contribution to defining a solution based on knowledge of the supplier market Synergies and common utilisation on best practices Need to divide functions of purchasing and procurement Profit centre Up Stream Cost centre Down Stream ConceptionNegotiation Admin / Purchasing

Amphibious Capability & Sustainment Kevin Manie – Project Director

24 DESCRIPTION The ADF is seeking to markedly improve the Amphibious Deployment and Sustainment Capability (ADASC) through Project JP The Project will deliver new Watercraft under Phase 3 that will integrate with the ship platform chosen in Phase 4A/4B for the two large amphibious ships It considers only existing Amphibious Ship designs, which are currently either built or under contract for construction. Two designs have been chosen; the French Landing Helicopter Dock (LHD) MISTRAL class by Armaris (DCN/Thales) and the Spanish BPE LHD from Navantia ( previously known as Izar). The delivery date for the first was originally mandated as 2010

25 The 2 Designs Navantia DCN/Armaris

26 The Need for Amphibious Capability In the Defence White Paper – “Defence 2000 – Our Future Defence Force”, the Government’s Primary Responsibility was: Ensure ADF flexibility to respond to a wide range of contingencies Ability to gain and use freedom of action Control activities on/in/under the sea, on land and in the air For this, a variety of capabilities are needed Warships, submarines, aircraft, troops and equipment and transportation options

27 The Need for Amphibious Capability Two sophisticated vessels for the RAN for Amphibious Deployment and Sustainment (ADAS) Part of the overall Amphibious Deployment and Sustainment Capability ADAS Ship & Crew ADAS Watercraft ADAS Helicopters & Crews ADAS Operations ADAS Support In line with Australia’s overall Military strategy To replace HMAS Tobruk, Manoora and Kanimbla

28 About JP2048 Phase 4A/4B c tonnes displacement when fully fitted out Ability to lift, lodge, sustain and withdraw a combined force with equipment whenever and wherever required Helicopters Vehicles Watercraft Deployment in Littoral environment Combat support centre Logistic and Medical support

29 Program Timeline December 2004 Ship Builders Estimating Pack Released from designers January 2005 RFQ released from Commonwealth to 8 parties (including RRDS team) March 2005 RFQ responses received for analysis August 2005 First-pass approval sought from cabinet 2H 2006 Shipbuilder RFT & Selection 2007 Begin build for Ship delivery

30 ADI – Delivering This Capability Risk Reduction Design Study Team (now ASAG) Made up of Industry representatives To provide expert industry assistance to the Commonwealth ADI Representation Project Team in place at ADI New people for a new challenge International experience Professional experts in their fields

ADI – Working With Industry to Deliver JP2048 Greg Parkinson Supply Chain Manager

32 ADI Strategy Our Role: Prime Contractor Lead Systems Integrator Partnering with industry who have experience, facilities and expertise, e.g. Forgacs (Newcastle, Tomago, Cairncross) NASSCO (San Diego, CA) Working together with Government Industry Groups Departments for State Development

33 Maximising The Benefit To Australian Industry Agile Prime Contractor Can best spread the benefit of this project to industry Able to draw upon skills and capacity of both traditional and non-traditionally shipbuilding companies Minimise spikes in labour demand Maximise the benefit to Australian Industry Extensive use of subcontractors around Australia Training of labour through GTO and RTO Developing facilities Creating export opportunities

34 Raw material to Superblock Raw Material plate Plate profile and penetrations cut Plate Prep Stiffeners welded Fabrication Block Panels welded to form 3-D structure Initial outfit started Grand Block Units assembled together Outfit further progressed Super Block Blocks and Grand Blocks brought together to form complete section of ship. Outfit advanced.

35 ROM Quantities 113 or 60 modules per ship (design dependant) Typical of 170 or 300 tonnes per module Maximum Navantia Module Weight – 360t Maximum DCN/Armaris Module Weight – 460t Maximum Module weight set by the designer’s shipyards Modules would be required at the build site at a rate of 1 per week on the Spanish design

36 ROM Quantities Approximately 120km of cabling will be installed Around 600 tonnes of piping will need to be fitted Around 12,000 tonnes of steel will be required 8000 tonnes of steel plate 4000 tonnes of steel structural items

37 Industry Support Requirements ADI/Forgacs will be seeking support in the following areas… Turnkey solutions for complete block assembly Modules up to 200 or 350 tonne mass (design dependant), 30m x 20m x 10m size Maximum efficient level of fit-out Pipe work, cabling, robust equipment etc. Painted Delivery to consolidation facility Engineering and Production Design assistance Demonstrable project management capability Transportation Labour Provision

38 Industry Support Requirements (cont.) Support to major subcontractors from SMEs Steel plate fabrication Beam preparation Ship equipment Winches Hatches Joinery Pumps Safety Equipment Paint Electrical Installation Plumbing and pipe work Pipe spool manufacture Equipment installation and commissioning

39 Registration Of Interest In order to ensure fair and equitable consideration of expressions of interest in this program, formal requests will be only accepted via the ADI website