Elements of Surveying (CEL271)

Slides:



Advertisements
Similar presentations
Unit 12 Construction Surveying
Advertisements

Final Exam Review 1 1.
Construction Surveys
Legal Descriptions and Site Plan Requirements
Standards of Practice Route Surveys Title 46 Professional and Occupational Standards Part LXI. Professional Engineers and Land Surveyors 1.
Plot Plans & Legal Descriptions. Site or Plot Plans  A plot or site is an area of land generally one lot or construction site in size  The term plot.
BASICS OF SURVEYING Ivy Tech Community College. Surveying Definition DEFINITION The art and science of making such measurements as are necessary to determine.
Chapter 13 Site Plan Layout.
ENGINEERING SURVEYS DEFINITION Surveying has to do with the determination of location of points on or near the surface of the earth. It is the art/science.
Civil Engineering Surveying
Dr. Dan Trent Mississippi Valley State University January 28, 2013.
How GIS and Land Surveying at Created by: Riley Lindsay Created by: Riley Lindsay can help local government?
Harry Williams, Cartography1 Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is.
Faculty of Engineering Technology
Chapter #1: Basics of Surveying
TRYPHINE DUDZAYI.  Surveying instrumentation has undergone a major transformation over the past years transit to the modern instruments.  The theodolite,
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
S.H.H.S Building Construction
TOPOGRAPHIC MAP.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
Chapter 14 Legal Descriptions and Site Plan Requirements.
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
Topography & Topographic Maps 8th Grade Science.
SU 4100 GEODETIC POSITIONING Instructor: Indra Wijayratne.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
STUDENTS NAMEID.NO.ENROLLMENT NO. MOD. JISHAN KHAN13PES NEEL SUTHAR13PES MILAN LAKHANI13PES GUJARAT TECHNOLOGICAL.
CLASSIFICATION OF SURVEYING
Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is rare and/or.
Civil Engineering Surveying Prepaid by:
Coordinate Geometry and Traverse Surveying Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 8 - Week 5 2 nd Semester.
Chapter 3 Section 1- Finding Locations on Earth
TECHNIQUES IN BASIC SURVEYING
Engineering Control and Surveying EAGD 3217 Syllabus and Revision.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
ELEMENTS OF CIVIL ENGINEERING (Subject Code )
Landform Drawings Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
What is a map? Civil Drafting?
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
DISCUSSION PLEASE TURN OFF ALL CELL PHONES IN DISCUSSION Importance Discussion and Homework is 30% of course grade Discussion material will be on exams.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
Unit: Introduction to Land Surveying Lesson: Methods of Surveying
Mapping Chapter 16. Uses of Topographic Maps To determine the topography or relief of a tract of land. To determine hydrologic features such as drainage.
INTRODUCTION TO SURVEYING
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
Models of the Earth Section 3 Section 3: Types of Maps Preview Key Ideas Topographic Maps Topographic Maps and Contour Lines Index Contour, Contour Interval,
Land Surveying Civil Engineering and Architecture
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
Rampurwala Taher Z Panchal Deep S Shah Akash K Patel Apurv K Rathod Hardipsinh.
Civil Engineering Surveying Roy Frank. Planning A Survey  Planning requires a well rounded understanding of surveying practices  Process: 1. Choice.
Gujarat Institute of Technical Studies name: Patel Savan Vasudevbhai Semester: 3 st Sem. Branch: Civil Engineering Enrollment No. : Sub: surveying.
Course Title: Engineering Surveying (CVE 301) Course Lecturer: Engr. F. M. Alayaki Civil Engineering Department, College of Engineering, University of.
Copyright January, Prof. Basuony El-Garhy Geotechnical Engineering and Foundations Civil Engineering Department Faculty of Engineering What is CE.
Construction Surveys. List of Figures Stages and Measurements of CS Design stages: topographic Surveying, and site maps Construction stage: Setting-out.
INTRODUCTION: Land Surveying: It has to do with the determination of relative spatial location of points on or near the surface of the earth. It is the.
Introduction Definition of surveying: the science, art and technology of determining the relative positions of points above, on, or beneath the earth’s.
Unit 1: Fundamental Concepts
Surveying-I.
Visit for more Learning Resources
نقشه های توپوگرافی مهدی کرد.
Common Surveys Used For Commercial Real Estate Transactions
PLEASE TURN OFF ALL CELL PHONES IN DISCUSSION Importance
Civil Engineering Surveying
PLEASE TURN OFF ALL CELL PHONES IN DISCUSSION Importance
Architectural Drafting Unit 2
INTRODUCTION TO GEOMATIC ENGINEERING
Modern Surveying Instruments
INTRODUCTION OF GEOMATIC
Chapter #1: Basics of Surveying
Surveying With Construction Applications, 7th Edition
Presentation transcript:

Elements of Surveying (CEL271) Gazala Habib Dept. of Civil Engg. Contact: Room No. 303, Block-4 E-mail: gazalahabib@gmail.com Phone: 1192 (Office)

Books Surveying by S K Duggal, Tata McGraw Hill, Vol 1 Surveying: Theory and practices, S. S Bhavikatti Surveying and levelling by N. N Basak Plane surveying A M Chandra Surveying (Vol-1) by B. C. Punmia, Ashok K. Jain and Arun K. Jain

Laboratory Lab timing for all group: 2-4 pm (Monday-Friday) Room Number: Block IV, 335 Contact: Mr. Rajeev Sharma (Phone: 6442)

Attendance policy All students must attend all classes. Attendance record will be maintained and will be periodically uploaded through the UG web-site. Lectures: 70 marks for attendance, surprise quizzes, homework, assignments and exams Laboratory: 30 marks for attendance, surprise quizzes, notebook, viva If attendance of the student is greater than 90%, result of the best three quizzes will be considered else average of all quizzes will be considered. If a student’s attendance is less than 75%, the student will be awarded one grade less than the actual grade that he(she) has earned. For example, a student who has got A grade but has attendance less than 75% will be awarded A- grade.

Marks, Exam, Assignment Lectures Lab Minor 1 10 Viva Minor 2 Surprise quiz Major 30 Notebook 5 Surprise Quiz (any number) + Assignments + Homework Attendance >= 90% Attendance (>=90%) + class participation (>=80% of time) means out of 10 question asked in class at least 8 should be correct

Attendance Policy …Contd. If a student has a valid medical certificate (from IITD hospital or a registered medical practitioner) because of which he/she has missed an evaluation component the compensation will be decided and put on notice board. If a student has missed any of the minors due to medical reasons or family emergency alternatives will be arranged. For example if a person misses minor-1 because of health problem he/she should produce the medical certificate immediately after re-joining the class and the re-minor will be conducted last working day of next week after minor-1. If a student misses Major examination he should apply for an I-grade or an extended-I grade. HOD will approve I-grade based on his/her assessment of the situation. In that case examination must be conducted within 10 days of completion of the majors. Dean, UGS will award the extended-I grade and in that case examination must be conducted within the first ten working days of the next semester.

Marks policy Full marks will be awarded for correct procedure and correct answer. 3/4 marks for correct procedure but wrong answer. Zero marks for wrong procedure and correct answer. All evaluation components including Minor and Major scripts will be shown to the students. Within 7-15 days after exam along with the model answer. The date and time for showing script will be displayed in the notice board. The schedule will be group wise. Grading of a course will be finalized and displayed after following the process of moderation. THEREFORE, NO INFORMATION WILL BE GIVEN ABOUT GRADING BEFORE THE MODERATION COMMITTEE’S MEETING, AND NO CHANGES WILL BE DONE ONCE THE GRADE IS DISPLAYED AFTER IMPLEMENTATION OF MODERATION COMMITTEE’S SUGGESTIONS. [PLEASE DO NOT BEG TO CHANGE THE GRADE ONCE IT IS FINILIZED AFTER MODERATION COMMITTEE’S MEETING]

Surveying What is surveying? Surveying may be defined as the science of determining the position, in three dimensions, of natural and man-made features on or beneath the surface of the Earth. These features may then be represented in analog form as a contoured map, plan or chart, or in digital form as a three dimensional mathematical model stored in the computer.

Objective of course To understand the basic concept of surveying Apply the surveying concept and equipments in real life You should be able to use a set of tools to solve the problems in an optimal way You should be able to understand the pitfalls (sources of error) to avoid them

Application of surveying in civil Engineering The planning and design of all Civil Engineering projects such as construction of highways, bridges, tunnels, dams etc are based upon surveying measurements. Project of any magnitude is constructed along the lines and points established by surveying. Thus, surveying is a basic requirement for all Civil Engineering projects. Other principal works in which surveying is primarily utilized are •  to fix the national and state boundaries; •  to chart coastlines, navigable streams and lakes; •  to establish control points •  to execute hydrographic and oceanographic charting and mapping; and •  to prepare topographic map of land surface of the earth.

Instruments… Dumpy Level Digital level Levelling Staff Tilting Level Telescope is fixed cannot be tilted or moved Telescope can be tilted slightly about its horizontal axis with the help of tilting screw. The line of collimation is made horizontal for each observation with the help of tilting screw Instrument can be levelled automatically within a certain tilt range Digital level

Levelling staff

Sewer Projects Firm under contract Preliminary studies General layout map Buildings located on general layout Treatment site search Preliminary paper layout Make sure every building and potential building site can be served Manhole system placed on general layout

Sewer Projects Preliminary filed work Preliminary profiles BM system established Manholes set Profiles run Basement elevations acquired Design mapping Final plans Treatment area Boundary survey Complete topo of area

Sewer Projects Design process Sewer line design Preliminary profiles drawn Basement elevations plotted Manholes placed on profiles Slope between manholes computed Problem areas – alternate service routes selected Manholes set in field Profiles run Revert to 3A

Sewer Projects Treatment plant design Plans drafted Topo map prepared Type system verified Treatment system sized based on existing and projected population System designed Plans drafted Sewer plans normally prepared on plan/profile sheets

Sewer Projects Bidding procedure Treatment plant drawn using plan sheets and cross sections Quantities computed Specifications Written instructions on how every item to be built Include contract documents and bid proposal Bidding procedure Notice of bid advertised on local paper Pre-bid meeting

Sewer Projects Bidding Contract awarded Each contractor submits sealed bid Bids opened and tabulated Engineer reviews proposals Engineer recommends which bid to accept Contract awarded

Sewer Projects Construction As Built Surveying Contractor required to hire surveyor for stakeout Manholes referenced Staking methods Batter board method Laser method Measurement of quantities As Built

Water distribution systems Put under contract – water district formed Preliminary studies General layout prepared Water district signs up users Water source located Waterlines placed on general layout Hydraulic gradient plotted from USGS topo

Water distribution systems Pump station and water storage sites Property acquired by perpetual easement or purchased Boundary survey performed for each site Topo each site Field work Plan preparation Normally photogrammetrically Flight plan sent on general layout Take photos and post measure horizontal control Plan sheets marked on photos using template

Water distribution systems Waterlines placed on plan sheets Crossings and easements Every location where waterline crosses paved road, railroad – has to be topo, cross sectioned, and tied to nearest stationing or milepost Crossings plotted and permits applied for – railroads, state DOT, township and county roads Easement descriptions prepared

Water distribution systems Final design All waterlines and appurtenances on plans, easements, acquired and in docket form, rock excavation on plans Quantities computed System driven to make sure nothing missed Tanks and P.S. Designed and sized

Water distribution systems Bidding Construction Water distribution system Waterline stakeout Each easement plotted on plans Crossings as permitted staked Quantities Tanks and PS Foundation staked Must be checked for plumb As built

Architectural Projects Firm Under contract Preliminary fieldwork Boundary survey Description provided Fieldwork Monument search, traverse site Compute data and analysis Final stakeout Easement and encroachment search Plat of survey

Architectural Projects Topo – grid method most common Grid pattern 25’ – 100’ BM – USGS Entire tract topo and adjacent areas to access Utilities – nearest tied in Include all objects above, on or below, ground Prepare topo map Field check map

Architectural Projects Construction Control If large building – you may want to establish TBM’s on control Mon. Stakeout Convert architects dimensions to engineering Layout clearing and excavation limits Layout underground piping

Architectural Projects Layout footings and foundations Layout building corners and supports Locate roads and parking areas Locate lighting and other project extras As built

Structure and Terrain Movement Used to monitor: Movement of buildings ( x, y, and z) Movement of bridges Movement of dams Landslides and earthquakes Amusement park rides

Structure and Terrain Movement Description – error within system must be less than smallest movement to be observed 2 groups of monuments installed Reference or control monuments Deformation or movement monuments

Structure and Terrain Movement Control – generally concrete pillars extending 3-4 feet out of ground with tribrach permanently attached Movement monuments – for earthquake or landslide may be similar deep monuments

Structure and Terrain Movement Equipment: GPS Turned angles Angle/Distance Leveling

Classification of surveying: Based on function Primary division based on shape of the earth Geodic survey: if the area surveyed is more than 1000 km2 geodic surveying must be employed Plane survey Classification based on function of survey Control surveying: establishing the horizontal and vertical positions of widely spaced control points using geodic method. Land surveying: to determine the boundaries and areas of parcel of land. City surveying: urban planning Topographic surveys: depiction of topography of a region. Including natural and man made features Engineering survey: for laying out engineering projects. Route survey: planning designing and execution of highways, railways, canals, pipelines etc. Construction surveys: required to establish points lines, grades and for staking out engineering works after the plans have been prepared and the structural design has n=been done.

Classification of surveying: Based on function Astronomic survey: are conducted for the determination of latitudes, longitudes, azimuths, local time etc. for various places by observing heavenly bodies such as suns and stars. Geological survey: to determine the strata of the earth’s crust for geological studies. Archaeological surveys: unearthing relics of antiquity Mine surveys: exploration of mineral deposits, and to guide tunnelling and other operations associated with mining. Satellite surveys: to establish intercontinental, interdatum and interisland geodic ties over the world by making satellite observations. Military surveys: conducted for military purpose.

Classification of surveying: Based on instruments Chain survey: only linear measurements are made with chain or tape no angular measurements are taken Compass survey: horizontal angles are measured with the help of magnetic compass Plane table survey: The map is prepared in the field itself by determining the directions of various lines making linear measurements, and plotting the details on paper using a plane table Levelling survey: this type of survey is used to determine the elevations and relative heights of the points with the help of instrument known as level. Theodolite survey: theodolite survey is primarily used in traversing and triangulation for providing controls. The horizontal and vertical angles are measured with the help of theodolite. Tacheometric survey: a special type of theodolite known as tacheometer, is used to determine horizontal and vertical distances directly. Photogrammetric survey: measurements are made with help photograph. EDM Survey: linear measurements are made with the help of EDM instruments.

Principles of surveying Fixing the points in relation to points already fixed http://nptel.iitm.ac.in/courses/Webcourse-contents/IIT-ROORKEE/SURVEYING/modules/module1/htmlpage/9.htm#

Principle of surveying Working from whole to part: to localize the errors and to control the accumulation of errors. Establish primary control points with high precision Establish secondary and tertiary control points within the system boundary and form triangle/rectangle may be with less precision. This will help in localizing the error and to control the propagation of error.

Working from whole to part

Errors