Arterial Street Rehabilitation for Riverside Drive 24 th Street to 35 th Street Public Informational Meeting July 22, 2014
Introductions Doug Helt, P.E. City of Tulsa Transportation Lead Brooke Caviness, P.E. City of Tulsa Senior Engineer / Project Manager Tim Morgan, P.E. HNTB Corporation Project Manager
Project Location Map
Overview Roadway Improvements Stormwater Improvements Water Main Improvements Sanitary Sewer Improvements Anticipated Project Schedule Questions
Roadway Improvements Roadway Geometry Improved = Safer Drive
Roadway Improvements 35 mph Speed Limit Median Separation Through Park Lane Widths Increased New Lighting (LED)
Roadway Improvements
Stormwater Improvements Travis Park RCB System Swan Creek RCB System Crow Creek Bridge Replaced Riverside Drive Storm System Upgraded
Stormwater Improvements Pre-Project Storm Conveyance System
Stormwater Improvements Post-Project Storm Conveyance System
Water Main Improvements Riverside Drive 12” Water Main Gathering Place 8” Water Main Creating Looped Water Main Systems Improved Function and Flow in Neighborhoods
Water Main Improvements Pre Project Water Main Network
Water Main Improvements Post Project Water Main Network
Sanitary Sewer Improvements Existing Systems are years old Reconstruction of Major Sanitary Mains High Strength Fiberglass for New Systems No Impact to Users
Sanitary Sewer Improvements Pre-Project Sanitary Sewer Network
Sanitary Sewer Improvements Sanitary Sewer Replacements
Anticipated Project Schedule Fall Construction Contract Award Winter 2014/ Construction Begins Spring Riverside Drive Closure Riverside Drive Pavement Construction Project Completed