2014 NEC Code Changes Ted “Smitty” Smith E Light Electric.

Slides:



Advertisements
Similar presentations
Control Circuit Protection Supplementary Protectors vs
Advertisements

ECCODES A Leader in Education Are You smarter than a THIRD Year Apprentice? Electricians.
2014 NEC Code Changes Ted “Smitty” Smith.
10 The Service Entrance. 10 The Service Entrance.
4/30/2015 AFCI 9/01/07 Rev 5 1 Arc Fault Circuit Interrupters For NEMA Field Reps.
Receptacles Nightmare at about a foot and a half (with apologies to The Twilight Zone and William Shatner)
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
REVIEW OF CODE BREAKFAST QUESTIONS Brought to you by fellow members who attended the Section Meeting.
Mark W. Earley, P.E. Chief Electrical Engineer.  Also known as the NEC ® or ANSI/NFPA 70  There are two electrical codes that govern electrical installation.
Electrical Principles and Wiring Materials. Principles of Electricity n Electricity is a form of energy that can produce light, heat, magnetism, chemical.
EET Survey of Electronics
Electrical Power Systems
© 2011 Ericson Manufacturing, Willoughby, Ohio
Electrical Principles and Wiring Materials
Hazard - Inadequate Wiring
2014 CHANGES TWO MINUTE DRILL COPYRIGHT TED “SMITTY” SMITH ©2014.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Two Minute Drill Number 32- Journeyman Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Two Minute Drill #8 Copyright 2005 Ted "Smitty" Smith Practice Code Look Up.
Electrical Principles and Wiring Materials. Principles of Electricity n Electricity is a form of energy that can produce light, heat, magnetism, chemical.
Two Minute Drill #9 Copyright 2005 Ted "Smitty" Smith.
1 INTRUSION ALARM TECHNOLOGY POWER SUPPLIES. 2 INTRUSION ALARM TECHNOLOGY Security systems shall have a primary power source and a secondary power source.
Calculation Speed Drill # NEC
Smitty’s Speed Drills 2008 Code Drills Health Care Facilities (C) Copyright 2008 Ted "Smitty" Smith1.
©Ted “Smitty” Smith This speed drill focuses on subjects that will be required for the journeyman and masters examination arranged by chapter of.
Two Minute Drill Number 22- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Home Electrical Systems. Behavior Objectives  Define the basics of Electrical Systems  Explain the basic principles of Electricity.  Describe the different.
2008 Code Drills (C) Copyright 2008 Ted "Smitty" Smith 1 Smitty’s Speed Drills.
Ag. Mechanics for Beginning Teachers
SERVICE ENTRANCE EQUIPMENT
Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 21- Residential Improving your skill in code Look Up Increasing Speed Drill.
By: Mr. Brock.  Electricity- Source of energy that can be easily converted into light, heat or power  Ampere (Amp)- Unit of measure of the rate of flow.
1 © 2015 Eaton. All Rights Reserved.. Suggestion on How to Use Industry Trainers are encouraged to use this material in their sessions Download the presentation.
2014 NEC C ODE C HANGES C LASS P ART III C ALCULATIONS Ted “Smitty” Smith 8/15/2014 E Light Electric Services, Inc.
Planning The Electrical System  Safe means for the entrance of electrical supply into a building  Means of disconnecting all electrical power in a building.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
Electricity. TYPES OF CIRCUITS Individual electrical circuits normally combine one or more resistance or load devices. The design of the automotive electrical.
N.E.C. Installation Techniques and Common Violations
Smitty’s Two Minute Drill Grounding
Planning The Electrical System
Electrical Principles and Wiring Materials
License Examination Practice Drill
Special-Purpose Outlets— Electric Heating, Air Conditioning
Chapter 12 Branch Circuits and Feeders. Chapter 12 Branch Circuits and Feeders.
Lighting Branch Circuit and Small-Appliance Circuits for Kitchen
2011 Changes Two Minute Drill
Smitty’s Two Minute Drills
Planning The Electrical System
Smitty’s Two Minute Drill Mixed Content -05
2014 NEC – Code Changes Pertaining to Wiring Devices
AFCI Protection: AFCI Receptacles and the NEC
Chapter Six Ground-Fault Circuit Interrupters, Arc-Fault Circuit Interrupters, Surge Protective Devices, Immersion Detection Circuit Interrupters, and.
Your Inspection Business Name Goes Here.
Outlet Branch Circuit Arc Fault Circuit Interrupter (OBC AFCI)
Calculations: Transformers and Service Conductor Calculations
Smitty’s Two Minute Drill #1: Feeders and Branch Circuits
Overcurrent Protection— Fuses and Circuit Breakers
2014 Changes Two Minute Drill
EET 323 – Electrical System Design Lecture 9: Grounding
Conductor A material, such as copper, that permits the flow of electricity; usually refers to the a wire.
Objectives Finish with Practice circuits problems for
2008 Code Drills Health Care Facilities
2020 National Electric Code
Smitty’s Two Minute Drill Services, Feeders, and Branch Circuits 1
Smitty’s Two Minute Drill Varied Number 7
Cooking , Electric Dryer and Appliance Calculations 3
Debunking the Myths of AFCI
Presentation transcript:

2014 NEC Code Changes Ted “Smitty” Smith E Light Electric

Article 750 Energy Management Systems Brand New Article Prompted by the need to meet energy management requirements There are certain systems that we do not want to interfere with in this process

Alternate Power Sources Energy management systems shall not override alternate power sources for the following systems Fire Pumps Health Care Facilities Emergency Systems Legally Required Standby Systems

Load Shedding Controls Energy Management Systems can not interfere with the load shedding controls for the following Fire Pumps Health Care Facility Emergency Systems Legally Required Standby Systems

Low and Medium Voltage Demarcation The code has historically divided low and medium voltage at 600V Solar and Wind had moved towards a standard of 1000 Volts In almost all circumstances where a proposal was submitted to change from 600V to 1000V it was accepted. Code Making Panel 1 did not change Article 110 and deferred other changes to individual code making panels.

Outward opening door and panic hardware requirement for electrical rooms has changed from being required for equipment 1200 Amps and greater to now be 800 Amps and greater

210.8 GFCI Laundry Areas has been added to the list of areas in a dwelling unit where GFCI protection is required Dishwashers are now required to be GFCI protected.

AFCI AFCI is now required in kitchens and laundry areas of dwelling units Dormatory Units will now need to be AFCI protected Several new options have been added to provided AFCI protection

Six Methods to Provide AFCI 1. AFCI Combination Breaker 2. Branch/ Feeder Breaker for the homerun only, then AFCI device at first receptacle 3. Supplemental Arc Protection breaker for homerun then a AFCI receptacle for first outlet. Limited to 50 ft or 75 ft homerun. 4. A listed branch circuit AFCI device that has been listed to work together to protect both the homerun and the demand side of the circuit. Limited to 50 and 75 ft homeruns 5. Use a steel wiring method from breaker to first outlet. Use a AFCI receptacle at first outlet 6. Encase homerun in 2” of concrete and then use an AFCI receptacle at the first outlet.

Lighting Loads Related to new energy code requirements Energy codes are requiring fewer watts per square foot but systems are required to be designed to handle much more load New code requirement allows you to size lighting loads at a lower amount if you meet specific requirements of a energy management system in the building.

Arc Energy Reduction Formally named Non-instantaneous Trip Circuit Breakers Renamed to be more definitive of the subject matter If the CB has a rating or can be adjusted to 1200A or greater then the requirements of.87 must be met Uses the same language as the GFI requirement

310.15(B)(7) Dwelling Unit Service Entrance Conductor Sizing Table Table is now eliminated Replaced with an adjustment factor of.83 It also will clarify that other adjustment factors apply

406.9(B)(1) Wet Location Receptacles Same requirements as 2011 for in use covers, etc New requirement that the cover be extra hard usage listed

Article 517 Health Care Facilities Patient Bed Receptacles: Increased from 4 to 8 receptacles required. Critical Care Patient Care Area Receptacles: Increased from 6 to 14 Operating Rooms now require 36 receptacles ISOLATED GROUND RECEPTACLES NO LONGER ALLOWED IN PATIENT CARE BED AREAS

Essential Electrical System needed to meet the requirements of Article 700 in the 2005 NEC Now clarified to be just be a requirement of the Life Safety Branch and not the entire Essential Electrical System.

Electric Vehicle Supply Equipment New requirement electric vehicle supply equipment is considered to be a continuous load 125% application If supplied by an energy management system then size OCPD and conductor based on the load supplied by the energy management system WITHOUT 125% requirement.

Solar Power Disconnect Switch Added a list of listing requirements that are acceptable for PV disconnects switchs. The old requirement just required they be listed. There are numerous listing specifications available so the NEC narrowed them down to the ones that are acceptable.

Surge Protection for Emergency Standby Systems Article 700 Surge protection is now also required for the alternate power supply system New requirement

Emergency Illumination now requires emergency illumination at the emergency power disconnect devices and transfer switch areas.

Article 705 Interconnection of Power Production Systems Utility Supply and PV system for example Requires now OCPD near the point of interconnection to protect against faults in the feeders that could flow back to utility

Commercial Electrical Service Areas A new requirement for 120v receptacle installed adjacent to the electrical service. Dwelling units excepted

PV System Rapid Shutdown The new requirement is going to be difficult to meet This requires the same type of rapid shutdown that is required by the 6 handle rule There is no current equipment to accommodate this.