Slide 4-1 UNIT 4: RESCUE, VENTILATION, SUPPORT, AND OVERHAUL.

Slides:



Advertisements
Similar presentations
Author: Thomas Maloney Near-Miss 24/7/365 Safety Calendar February 2009 Incident Command.
Advertisements

FIRE GROUND STRATEGY AND TACTICS
Strategy and Tactics with Limited Staffing
TRUCK COMPANY OPS Truck company operations are tasks that support the fire attack. Often called Support Functions The engine companies put the fire out.
Safety Officer State Practical Skill Final Exam. Create a Incident Safety Plan State Practical Skill Exam Using the Structure Fire Safety Report complete.
Apparatus Assignments Presentation January 24, 2011.
Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8.
Slide 5-1 UNIT 5: WATER SUPPLY, FIXED FIRE PROTECTION SYSTEMS, AND SALVAGE.
May 2014 MCO Training:.  Session:  2 Hours  30 minutes class  2 Practice drills  Objectives:  Review RIC and Mayday procedures  Introduce the default.
THE INTERNATIONAL SOCIETY OF FIRE SERVICE INSTRUCTORS Electronic INSTRUCT-O-GRAM Program The “Safety Engine” Concept – Part 1.
1 Fire in CHS Environmental Health & Safety Fire Marshals Office.
Slide 3-97 WHAT NEEDS TO BE DONE? INCIDENT STRATEGY(IES) Exposure protectionExposure protection Confinement/ExtinguishmentConfinement/Extinguishment VentilationVentilation.
Blackwood Fire Company
Riding Assignments Presentation February 28, 2011.
State of Kuwait 3rd Intl Fire & Safety Conference & Expo 4-6 March 2014 Building Performance for Emergency Response Incident Examination and Tactical Response.
Troy Fire Department Incident Command System
East Metro Training Group Tactical Training 1 st Quarter, 2011.
Slide 1-1 MANAGING COMPANY TACTICAL OPERATIONS: TACTICS.
Training On Demand. Purpose To provide fire fighters at an emergency incident a team with pre-assigned duties aimed at rescuing downed, lost or trapped.
Fire Suppression Techniques IFSTA Chapter 14
Tactics.  Garden Apartments  Town Homes  Apartment Buildings 2.
Rapid Intervention Team & MAYDAY Procedures
CVFD Training – Ventilation Practices
Managing Company Tactical Operations
13 Search and Rescue. 2 Objectives (1 of 2) Define search and rescue. Describe the importance of scene size- up in search and rescue. Describe search.
Standard Operating Procedures. The firefighter will demonstrate a basic knowledge of standard operating procedures as a means of positioning and utilizing.
MODULE:3 FIRE CONFINMENT AND EXTINGUISHMENT. OBJECTIVES Module 3 Select and deploy the appropriate hose lines to accomplish fire confinement and extinguishment.
Slide 3-1 DEVELOPING AN ACTION PLAN. Slide 3-2 OBJECTIVES Given a structural fire scenario, demonstrate the ability to develop a strategy using the command.
Slide 2-1 UNIT 2: THE ANALYTICAL SIZEUP PROCESS. Slide 2-2 OBJECTIVES The students will: Discuss the scientific method.Discuss the scientific method.
MODULE:3 FIRE CONFINMENT AND EXTINGUISHMENT. OBJECTIVES Module 3 Overview Select and deploy the appropriate hose lines to accomplish fire confinement.
Maryland FF Fatality October 10, Investigation  NIOSH General Engineer  NIOSH Occupational Safety & Health Specialist  Fire Department Safety.
MODULE 1: INTRODUCTION. OBJECTIVES Explain the purpose and use of the Communication Model and the Quick Access Prefire Plan in tactical operations at.
High Rise October DISPATCH E82, E83, E81, E97, E86, E95, T82, T98, R81, R83, R97, B8, B9, OSO respond to a reported structure fire at 777 W. Lake.
MODULE 6: PRIVATE DWELLING SIMULATIONS. OBJECTIVES Module 6 Overview Identify the unique construction factors of single-family dwellings. Recognize the.
MODULE 6: PRIVATE DWELLING SIMULATIONS. OBJECTIVES Module 6 Identify the unique construction factors of single-family dwellings. Recognize the basic problems.
1 © 2009 Delmar, Cengage Learning Special Concerns in Fire Fighting Chapter 6 Page 133.
Slide 6-1 MODULE 6: PRIVATE DWELLING SIMULATIONS.
Search & Rescue Ins and Outs Presented for use by Emory Arnold For.
Search and Rescue.
State of Georgia BASIC FIRE FIGHTER TRAINING COURSE
Aerial Apparatus Operator Positioning Aerial Apparatus.
ELGIN FIRE DEPARTMENT - TRAINING DIVISION INCIDENT MANAGEMENT SYSTEM.
SIZE-UP The systematic process consisting of the rapid, yet deliberate, consideration of all critical fire ground factors that leads to the development.
TRANSITION TO COMPANY OFFICER Arlington Fire Department Officer Development September 2000.
INITIAL APPARATUS PLACEMENT and STAGING OPERATIONAL GUIDELINE SALT LAKE VALLEY FIRE ALLIANCE.
Part C: Class D Fires and Tactical Considerations.
MODULE 4: WATER SUPPLY AND EXPOSURE PROTECTION. OBJECTIVES Module 4 Identify the principles of water supply and tactics for establishing water supplies.
Slide 4-1 UNIT 4: INCIDENT COMMAND SYSTEM GENERAL STAFF FUNCTIONS AND APPLICATIONS.
TACTICS & STRATEGY II Fire Suppression.
INCIDENT MANAGEMENT SYSTEM SETS & REPS DEPLOYMENT.
Managing Company Tactical Objectives Tactics Module 1: Introduction.
INCIDENT MANAGEMENT SYSTEM SETS & REPS RADIO PROCEDURES.
RAPID INTERVENTION TEAMS This presentation is a work in progress and has not yet been adopted as policy. It is meant as a training guide to better.
FIRE COMMAND 1A Incident Command Project. SYNOPSIS: While operating at a residential structure fire, three firefighters experienced a catastrophic floor.
Division/Group Supervisor, Roles and Responsibilities.
Fireground Operations: Structure Fires Union County SOG 3.16.
13 Search and Rescue.
GENERAL ORDER INITIAL OPERATIONS AT HIGH RISE STRUCTURE FIRES HOWARD COUNTY DEPARTMENT OF FIRE AND RESCUE SERVICES AND FIFTH DISTRICT VOLUNTEER.
Quarterly Training May  Terminology  Building Construction  Keys to Incident Resolution  First Alarm STRIP MALL S.O.G.
Fireground Operations: Staging Union County SOG 3.24.
“The initial radio report is probably one of the most important communications we transmit throughout an entire incident”. Alan Brunacini.
Fire Service Incidents. Today’s fire service does much more than fight fires. The Fire Service has become the primary source of emergency response and.
Fire Ground Roles & Responsibilities On scene reports & Truck and seat assignments.
First To Arrive Duties Training Union County SOG 3.12.
COMMAND BOARD BASIC DESIGN AND OPERATION (Command and Control) (Accountability) (ICS) Presented By: OCWFCD 1.
Fires in Residential and Commercial Townhouses and Rowhouses
NOVA MANUAL TRAINING TOWNHOUSE June 2009
Steps to Interior Attack
Presentation transcript:

Slide 4-1 UNIT 4: RESCUE, VENTILATION, SUPPORT, AND OVERHAUL

Slide 4-2OBJECTIVES Select appropriate ventilation tactics based on identified ventilation principles and tactical considerations.Select appropriate ventilation tactics based on identified ventilation principles and tactical considerations. Using the command sequence cycle, develop a ventilation action plan based on the incident presented.Using the command sequence cycle, develop a ventilation action plan based on the incident presented. Select appropriate rescue tactics based on identified rescue principles and tactical considerations.Select appropriate rescue tactics based on identified rescue principles and tactical considerations. The students will:

Slide 4-3 OBJECTIVES (cont'd) Using the command sequence cycle, develop a rescue action plan based on the incident presented.Using the command sequence cycle, develop a rescue action plan based on the incident presented. Understand the incident support activities that are necessary to promote safe fireground operations before, during, and after a fire.Understand the incident support activities that are necessary to promote safe fireground operations before, during, and after a fire. Understand the necessary safe practices that need to be implemented during overhaul operations.Understand the necessary safe practices that need to be implemented during overhaul operations.

Slide 4-4 RESCUE

Slide 4-5 RESCUE Rescue is a systematic process used to locate, protect, and remove occupants and fire victims safely from a structure and convey them to a place of safety.

Slide 4-6 RESCUE TACTICS Conduct primary searchConduct primary search Conduct secondary searchConduct secondary search Provide for rescued occupantsProvide for rescued occupants

Slide 4-7 CONDUCT PRIMARY SEARCH Rapid search of all areas involved in or exposed to fire, if they can be entered, to verify removal and/or safety of occupants.Rapid search of all areas involved in or exposed to fire, if they can be entered, to verify removal and/or safety of occupants. Key elements.Key elements. Removal of victims.Removal of victims. Transmit "ALL CLEAR."Transmit "ALL CLEAR."

Slide 4-8 CONDUCT SECONDARY SEARCH Extremely thorough search of interior fire area after initial fire control, ventilation, and interior lighting are completed, to ensure that there is no possibility of victims remaining undiscovered.Extremely thorough search of interior fire area after initial fire control, ventilation, and interior lighting are completed, to ensure that there is no possibility of victims remaining undiscovered. Key elements.Key elements.

Slide 4-9 PROVIDE FOR RESCUED OCCUPANTS Victim removal pathsVictim removal paths Move victims to triage areaMove victims to triage area Treat victimsTreat victims Transport victimsTransport victims Provide for uninjured, displaced personsProvide for uninjured, displaced persons

Slide 4-10 TACTICAL SIZEUP FOR RESCUE Sizeup factorsSizeup factors – Stage of fire development – Number, location, and condition of victims; effect of fire on victims – Capability of onscene companies Sizeup questionsSizeup questions

Slide 4-11 SUPPORT FOR RESCUE OPERATIONS TimingTiming Protective linesProtective lines EntryEntry VentilationVentilation LadderingLaddering Confinement/ExtinguishmentConfinement/Extinguishment

Slide 4-12

Slide 4-13 RESCUE COORDINATION ISSUES Teamwork, organization, and good communication.Teamwork, organization, and good communication. Rapid ventilation.Rapid ventilation. Keep fire away from people and protect escape routes with hoselines.Keep fire away from people and protect escape routes with hoselines. Laddering to ventilate and advance protective hoselines.Laddering to ventilate and advance protective hoselines.

Slide 4-14

Slide 4-15 RESCUE Command Sequence # 4

Slide 4-16 REVIEW SIZEUP REPORT OF FIREGROUND CONDITIONS

Slide 4-17 SIZEUP REPORT OF FIREGROUND CONDITIONS Initial reportInitial report To be given immediately upon arrival on location Exact location and conditions as observedExact location and conditions as observed – Nothing showing – Size of structure--stories and dimension-- type of construction--occupied or vacant – Smoke/Fire--location and density – Status of occupants--if known – Exposures--Sides A, B, C, D, or other – Engine __ is establishing ___ Street Command.

Slide 4-18 SIZEUP REPORT OF FIREGROUND CONDITIONS (cont'd) Subsequent reportSubsequent report Information not immediately reported and/or information developed upon investigation. To be given ASAP or within 5 minutes. Progress reportProgress report To be given by the Incident Commander (IC) every 10 minutes until fire is under control.

Slide 4-19 COMMAND SEQUENCE RESCUE ACTION PLAN Command Sequence # C St.

Slide 4-20 COMMAND SEQUENCE # 4 PLOT PLAN

Slide 4-21 Walk-around 450 C Street Command Sequence # 4 Three-story apartment building, 50'x 125'. Occupied. Side A N

Slide 4-22 Side B Side A Sides A and B Walk-around 450 C Street Command Sequence # 4

Slide 4-23 Side B Walk-around 450 C Street Command Sequence # 4

Slide 4-24 Side C Side B Sides B and C Walk-around 450 C Street Command Sequence # 4

Slide 4-25 Side C Side D Sides C and D Walk-around 450 C Street Command Sequence # 4

Slide 4-26 Side A Side D Sides A and D Walk-around 450 C Street Command Sequence # 4

Slide 4-27 COMMAND SEQUENCE # 4 1ST ALARM RESOURCES Engine 1Engine 1 Engine 2Engine 2 Engine 3Engine 3 Truck 1Truck 1 Squad 1Squad 1 Battalion Chief 1Battalion Chief 1 – All companies staffed with four firefighters – Battalion Chief 1: 30-minute response

Slide 4-28 Fire is located first floor storage room, center building. Report of people trapped on upper floors. Side A 450 C Street Command Sequence # 4 Storage Room Wednesday 6AM Wind 15 MPH Out of the West 73ºF N

Slide 4-29 Parking Side A 450 C Street Side B Side D Side C N

Slide 4-30 WHAT IS THE SITUATION (SIZEUP) On location at 450 C Street, three-story brick apartment building, 50' x 125', wood-frame construction, occupied.On location at 450 C Street, three-story brick apartment building, 50' x 125', wood-frame construction, occupied. Medium to heavy smoke showing all floors.Medium to heavy smoke showing all floors. Many occupants reported still in the building.Many occupants reported still in the building. Exposure Side B is a similar attached apartment building.Exposure Side B is a similar attached apartment building. No other immediate exposures.No other immediate exposures. Engine 1 is establishing C Street Command.Engine 1 is establishing C Street Command. Sizeup report example:

Slide 4-31 RESCUE ACTION PLAN

Slide 4-32 WHAT CAN BE ACCOMPLISHED? INCIDENT OBJECTIVES Safe removal of occupantsSafe removal of occupants Contain and control fire to room/building of originContain and control fire to room/building of origin

Slide 4-33 WHAT NEEDS TO BE DONE? INCIDENT STRATEGY(IES) RescueRescue Confinement/ExtinguishmentConfinement/Extinguishment VentilationVentilation Special equipmentSpecial equipment

Slide 4-34 HOW ARE YOU GOING TO DO IT? INCIDENT TACTICS RescueRescue – Deploy search and rescue groups to remove occupants – Deploy one 1-3/4-inch hoseline Side A first floor for stairwell protection Confinement/ExtinguishmentConfinement/Extinguishment – Deploy 1-3/4-inch hoseline to Side A first floor for fire confinement/extinguishment – Deploy one 1-3/4-inch hoseline to Side C first floor for fire confinement/extinguishment

Slide 4-35 VentilateVentilate – Ventilate stairwells to support occupant removal – Vent roof apertures – Horizontal ventilation all floors for fire confinement Special equipmentSpecial equipment Employ imaging camera to support search and rescue groups HOW ARE YOU GOING TO DO IT? INCIDENT TACTICS (cont'd)

Slide 4-36 IMPLEMENT THE RESCUE ACTION PLAN Communicate all assignments clearly to all resources operating on the incident.

Slide 4-37 EVALUATE THE RESCUE ACTION PLAN Evaluate progress every 10 minutes.Evaluate progress every 10 minutes. Obtain feedback reports from resources operating on the incident.Obtain feedback reports from resources operating on the incident.

Slide 4-38 Activity 4.1 Scenario M Street

Slide 4-39 Sides A and D Side D Walk-around 122 M Street Activity 4.1 Scenario 1 Side A 122 M Street

Slide 4-40 Side B Walk-around 122 M Street Activity 4.1 Scenario 1

Slide 4-41 Side C Walk-around 122 M Street Activity 4.1 Scenario 1

Slide 4-42 Exposure C-1 Side C Walk-around 122 M Street Activity 4.1 Scenario 1

Slide 4-43 Side D Exposure C-2 Walk-around 122 M Street Activity 4.1 Scenario 1

Slide 4-44 ACTIVITY 4.1 SCENARIO 1 1ST ALARM RESOURCES Engine 1Engine 1 Engine 2Engine 2 Engine 3Engine 3 Truck 1Truck 1 Squad 1Squad 1 Battalion Chief 1Battalion Chief 1 – All companies staffed with four firefighters – Battalion Chief 1: 30-minute response

Slide 4-45 Report of two occupants trapped third floor front bedroom Side C. 122 M Street Activity 4.1 Scenario 1 Side C

Slide 4-46 N Exposure C1 Exposure C2 Parking Side A Side B Side C Side D 122 M Street

Slide 4-47 LR BR 1 BR 2 Ba K 45' 25' Side A Third Floor Side B Side C Side D 122 M Street

Slide 4-48 Activity 4.1 Scenario Block of 25th Street

Slide 4-49 Side A 25th Street Walk-around 700 Block 25th Street Activity 4.1 Scenario 2

Slide 4-50 Side A Side B Sides A and B Side B Side A Walk-around 700 Block 25th Street Activity 4.1 Scenario 2

Slide 4-51 Sides B and C Side BSide C Walk-around 700 Block 25th Street Activity 4.1 Scenario 2

Slide 4-52 ACTIVITY 4.1 SCENARIO 2 1ST ALARM RESOURCES Engine 1Engine 1 Engine 2Engine 2 Engine 3Engine 3 Truck 1Truck 1 Squad 1Squad 1 Battalion Chief 1Battalion Chief 1 – All companies staffed with four firefighters – Battalion Chief 1: 30-minute response

Slide 4-53 Report of two occupants trapped 2nd floor front bedroom. Report of two children trapped 2nd floor rear bedroom. Report of an invalid 2nd floor front bedroom, B-1 exposure. No communications with occupants in exposure D-1. Side A th Street Activity 4.1 Scenario 2 25th Street Exp. B-1 Exp. D-1

Slide 4-54 First Floor 7 Row houses N LR KDR LR KDR 21' 45' LR KDR LR KDR LR KDR LR KDR LR KDR Side A th Street Side C

Slide 4-55 Second Floor 7 Row houses BR Br Ba BR Br Ba N BR Br Ba BR Br Ba BR Br Ba BR Br Ba BR Br Ba Side A th Street Side C

Slide 4-56 Activity 4.1 Scenario E Street

Slide 4-57 Side A 356 E Street Walk-around 356 E Street Activity 4.1 Scenario 3

Slide 4-58 Sides A and B Side B Side A Walk-around 356 E Street Activity 4.1 Scenario 3

Slide 4-59 Sides B and C Side C Side B Walk-around 356 E Street Activity 4.1 Scenario 3

Slide 4-60 Side D Sides C and D Side C Walk-around 356 E Street Activity 4.1 Scenario 3

Slide 4-61 ACTIVITY 4.1 SCENARIO 3 1ST ALARM RESOURCES Engine 1Engine 1 Engine 2Engine 2 Engine 3Engine 3 Truck 1Truck 1 Squad 1Squad 1 Battalion Chief 1Battalion Chief 1 – All companies staffed with four firefighters – Battalion Chief 1: 30-minute response

Slide 4-62 Side A Heavy fire second floor, side D. 14 occupants per floor. Report of many occupants unaccounted for. 356 E Street Activity 4.1 Scenario 3 Side D Sides A and D

Slide 4-63 Lobby Balcony Balcony Balcony Second Floor Third Floor First Floor N Side A Side B Side C Side D 356 E Street

Slide 4-64 VENTILATION

Slide 4-65 VENTILATION (cont'd) A planned, systematic procedure for reducing, redirecting, or removing heat, smoke, and fire gases from a structure and replacing them with clean, fresh air.

Slide 4-66 VENTILATION PRINCIPLES Ventilation for life safetyVentilation for life safety Ventilation for incident stabilizationVentilation for incident stabilization Ventilation for property conservationVentilation for property conservation Ventilation to support other tactical operationsVentilation to support other tactical operations

Slide 4-67

Slide 4-68 DETERMINE WHERE VENTILATION IS NEEDED Planned, systematic approachPlanned, systematic approach General location prioritiesGeneral location priorities

Slide 4-69

Slide 4-70 SELECT APPROPRIATE TACTICS(S) Horizontal ventilationHorizontal ventilation Vertical ventilationVertical ventilation A combinationA combination

Slide 4-71 VENTILATION METHODS Natural ventilationNatural ventilation Self-ventilationSelf-ventilation Forced (mechanical) ventilationForced (mechanical) ventilation

Slide 4-72 TYPES OF FORCED VENTILATION Fog streamsFog streams Building heating, ventilating, and air conditioning (HVAC) systemBuilding heating, ventilating, and air conditioning (HVAC) system Negative pressureNegative pressure Positive pressurePositive pressure

Slide 4-73

Slide 4-74 SUPPORT FOR VENTILATION Proper apparatus placementProper apparatus placement Proper hoseline placementProper hoseline placement EntryEntry Selection and placement of laddersSelection and placement of ladders LightingLighting Breathing airBreathing air

Slide 4-75 VENTILATION HAZARDS Opening below fire or at same levelOpening below fire or at same level Opening too soonOpening too soon Opening in wrong placeOpening in wrong place Opening into blind atticOpening into blind attic Insufficient openingInsufficient opening Delayed too longDelayed too long

Slide 4-76 Wrong Way Right Way

Slide 4-77

Slide 4-78

Slide 4-79 VENTILATION COORDINATION ISSUES With rescue.With rescue. With entry and fire attack.With entry and fire attack. Hoselines should not hinder ventilation.Hoselines should not hinder ventilation.

Slide 4-80 RESCUE AND VENTILATION Command Sequence # 5

Slide 4-81 REVIEW SIZEUP REPORT OF FIREGROUND CONDITIONS

Slide 4-82 SIZEUP REPORT OF FIREGROUND CONDITIONS Initial reportInitial report To be given immediately upon arrival on location Exact location and conditions as observedExact location and conditions as observed – Nothing showing – Size of structure--stories and dimensions-- type of construction--occupied or vacant – Smoke/Fire--location and density – Status of occupants--if known – Exposures--Sides A, B, C, D, or other – Engine __ is establishing ___ Street Command.

Slide 4-83 SIZEUP REPORT OF FIREGROUND CONDITIONS (cont'd) Subsequent reportSubsequent report Information not immediately reported and/or information developed upon investigation. To be given ASAP or within 5 minutes. Progress reportProgress report To be given by the IC every 10 minutes until fire is under control.

Slide 4-84 COMMAND SEQUENCE RESCUE VENTILATION ACTION PLAN Command Sequence # th Street

Slide 4-85 COMMAND SEQUENCE # 5 PLOT PLAN

Slide 4-86 Burns Nursing Home, one-story, 75' X 250', ordinary construction. Occupied. Walk-around th Street Command Sequence # 5 Side A th Street N

Slide 4-87 Walk-around th Street Command Sequence # 5 Side A Burns Nursing Home

Slide 4-88 Walk-around th Street Command Sequence # 5 Side A Burns Nursing Home

Slide 4-89 Walk-around th Street Command Sequence # 5 Side B Burns Nursing Home

Slide 4-90 Side B and C Walk-around th Street Command Sequence # 5 Side B Side C Burns Nursing Home