. Load sensors conditioners – radiation tests Mateusz Sosin BE/ABP/SU RADWG, 15.11.2011.

Slides:



Advertisements
Similar presentations
Load Cell &DP Cell 2007-CHEM-17.
Advertisements

BE/ABP-SU during LHC LS1 CERN, INDICO MTI ACTIVITIES LHC LS1 – low beta magnets and interconnections.
PPT 206 Instrumentation, Measurement and Control SEM 2 (2012/2013) Dr. Hayder Kh. Q. Ali 1.
Data Acquisition Risanuri Hidayat.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Instrumentation System  A Measuring system is required to compare a quantity with a standard or to provide an output that can be related to the quantity.
COMPUCCINO Kalani Rathnabharathi Vithya Shanmugam Robert Armstrong Aaron Kulp.
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
Helicopter Data Acquisition System ECE 4522 Senior Design II.
Oliver Bitterling  Introduction to the QPS  Radiation damage in electronic systems  Construction of radiation tolerant systems  Radiation test and.
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
Survey and Alignment Equipment R2E and Availability Workshop – CERN Mateusz Sosin EN/MEF-SU.
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
ALIGNMENT OF Q2 LOW BETA QUADRUPOLES D. Missiaen, On behalf of the EN-MEF-SU/MTI team 1.
David MacNair POWER SUPPLY 3/30/20061 Ethernet Power Supply Controller.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
18/7/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  How to power the electronics of TILECAL ? Power supply as close as possible to electronics ?  Positives.
1 Warsaw University of Technology Faculty of Electronics and Information Technology Institute of Electronic Systems HARDWARE SIMULATOR of the high-resolution.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Power & Voltage Plan R. Van Berg Electronics Mini-Review.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
JMC – Joint Motion Controller Complete guide to building and testing each JMC.
Dmitry Gudkov BE/RF/PM CLIC Module Working Group PROTOTYPE TWO-BEAM MODULES (CLEX) Supporting and positioning system for CLEX modules main conclusions.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
23 February 2004 Christos Zamantzas 1 LHC Beam Loss Monitor Design Considerations: Digital Parts at the Tunnel Internal Review.
Front End DAQ for TREND. 2 Introduction: analog part 2015, feb 10 th.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
NanoFIP Progress Report Eva. Gousiou BE/CO-HT & the nanoFIP team RadWG 23Nov11.
C. Beigbeder Final design Review ECAL/HCAL Frond End  FE board : current prototype  Test results Qualification Clock adjustment Noise analysis  FE board.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
Low Voltage Power Supplies I.Placement II.Size III.Power consumption IV.Cabling V.Regulators board blocs VI.Component selection VII.Schematics VIII.Firmware.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS.
BLM AUDIT 2010Ewald Effinger BE-BI-BL BLM tunnel installation and data acquisition card (BLECF) Ewald Effinger AB-BI-BL.
. Load Sensors Acquisition System (LSAS) – CNRAD irradiation test ( – ) Mateusz Sosin BE/ABP/SU RADWG,
1 Magnetic measurements proposal of the FAIR magnets Magnetic Measurements of Super-FRS dipoles: budgets 1 Budget for dipoles ( ) document FAIR-SFRS-magnetic_measurement_EVM.xls.
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
ASIC Activities for the PANDA GSI Peter Wieczorek.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
UCLA IEEE NATCAR 2004 SUMMER CLASS Magnetic Sensors & Power Regulation.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future.
Prototype Sensor Status and Measurements u Sensor Response Measurements u Mechanical Response u Noise Expectations u DAQ Status.
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
Presentazione delle richieste immediate per l’upgrade di MEG (gruppo di Roma) Cecilia Voena Mar 15 th, 2013.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
A DSP based on on-line UPS R.Padamaja G.Mamatha Reddy EEE EEE S.V.C.E S.V.C.E BY.
Front End. Charge pre-amp and detector Voltage regulator. TOP side. Detector linear voltage regulator BOTTOM side. Charge pre-amp.
Enhancement Presentation Carlos Abellan Barcelona September, 9th 2009.
PADME Front-End Electronics
SIGNAL CONDITIONING Signal conditioning is stage of instrumentation system used for modifying the transduced signal into a usable format for the final.
ALIGNMENT OF THE NEW TRIPLETS
nanoFIP 5th WorldFIP Insourcing Meeting Progress Report
D. Breton, S. Simion February 2012
Basics of Sensor Compensation for Piezoresistive Sensors
Calorimeter Mu2e Development electronics Front-end Review
Injectors BLM system: PS Ring installation at EYETS
Ideas and design concepts, and challenges
INSTRUMENTASI INDUSTRI
Electronics: Demod + 4Q FE
Data Acquisition Electronics Unit – Lecture 6
LIU BWS Firmware status
Presentation transcript:

. Load sensors conditioners – radiation tests Mateusz Sosin BE/ABP/SU RADWG,

Mateusz Sosin Research status of Low-Beta weighting system Summary Load sensors under Low-Beta quadrupoles – introduction Load sensors – signal conditioner Conditioner crate – components & radiation tests Questions Load sensors conditioners – radiation tests RADWG,

Mateusz Sosin Research status of Low-Beta weighting system Load sensors under Low-Beta quadrupoles Monitoring and adjustment system Monitoring alignment systems: Wire Positioning Systems – (WPS) and Hydrostatic Levelling Systems (HLS) are installed on top of the cryostat (precision of measurements of a few microns) Motorization of the Jacks according to 5 DOF 10 Vertical and 6 Radial Jacks per triplet Problem of loosing articulation point detected at february 2011 !!! Unexpected 0.8mm Q3R5 magnet jump during repositioning dangerous for installation Reported by D.Missiaen at LMC – Load sensor solution proposed Load sensors conditioners – radiation tests RADWG,

Mateusz Sosin Research status of Low-Beta weighting system Load sensors under Low-Beta quadrupoles Sensor Strain gauge – force washer type sensor Solution tested After market study - choosed German HBM MPZ Rad-hard qualified Constraints Very low possible space for sensor installation (ø70, h16 mm) High load (up to 15T) Radioactive area Load sensors conditioners – radiation tests RADWG,

Mateusz Sosin Research status of Low-Beta weighting system Load sensors under Low-Beta quadrupoles Configuration per one IP side: Installation for IP1,2,5,8 L&R Compatible with other SU instalations Load sensors conditioners – radiation tests RADWG, ? S.A.S.tested by A.Marin EDMS , FipADUC cards tested by R.Denz

Mateusz Sosin Research status of Low-Beta weighting system Load sensors – signal conditioner Suitable market accesible conditioners Expensive (0.6..1kCHF per channel) Additional cabling needed We have no influence for used components BE-ABP-SU conditioners (Analog Devices AD ’51 based) Cheap (0.1kCHF per channel) Suited for application Basic DSP abilities included AC/DC modes & cable compensation Load sensors conditioners – radiation tests RADWG,

Mateusz Sosin Research status of Low-Beta weighting system Load sensors – signal conditioner BE-ABP-SU prototype and HBM-AE301 conditioners checked at special test bench Similar noise with 270m cables High output signal stability for both conditioners Both solutions suitable for Low-Beta weighting system application Load sensors conditioners – radiation tests RADWG,

Mateusz Sosin Research status of Low-Beta weighting system SOLUTION: Basing on Survey Acquisition System electronics – create load sensors conditioning crate Use same part of electronics like in S.A.S. (FipADUC card) Add one PCB (12 channel input stage) in place of old S.A.S. input amplifiers board Load sensors – signal conditioner FIP ADUC CARD S.A.S. INPUT AMPLIFIERS BOARD CONN.TAPE FIP ADUC CARD LOAD SENSORS 12 CHANNEL INPUT STAGE PCB CONN.TAPE Advantages No additional cabling between conditioner and S.A.S. Small space in SU racks needed No big updates at FESA/PVSS level needed Load sensors conditioners – radiation tests RADWG,

Mateusz Sosin Research status of Low-Beta weighting system Conditioner crate – components & radiation tests FIP ADUC CARD LOAD SENSORS 12 CHANNEL INPUT STAGE PCB CONN.TAPE Load sensors conditioners – radiation tests RADWG, Semiconductors proposed for 12-channel input stage of conditioner crate: 12 x AD7730 – Analog Devices, CMOS, 24-Bit Sigma-Delta, Bridge Transducer ADC for Load Cell Applications (not tested) 12xMIC4427 – Micrel, MOSFET driver (not tested) 1xCPLD XC95144 – Xilinx CPLD, 144 macrocells, triple mode redundancy (5V logic compatible preffered), Actel if no agreement 1xADUC8xx – Analog Devices, ’51 based MCU with ADC & 12bit DAC (used in FipAduc, tested 100Gy) 12xLED HLMP-1700 or HLMP-1790 (tested 100Gy) 4x rectifying diodes 50WQ03FN (tested100Gy) 1x LM7805 – Linear voltage stabilizer (tested 100Gy) 2x Rail-To-Rail operational amplifier (Vcc=5V ?)

Mateusz Sosin Research status of Low-Beta weighting system Conditioner crate – components & radiation tests Load sensors conditioners – radiation tests RADWG, Equipment locations: IP1: US15 IP2: UA23, UA27 IP8: UA83, UA87 IP5: UJ56 -> after LS1 UL55 Equipment quantity: Each IP -> 2 crates (10 channels for sensors + 2 spares) 8 crates in total

Mateusz Sosin Research status of Low-Beta weighting system ? Questions Load sensors conditioners – radiation tests RADWG, According to future locations of new eqipment and radiation levels – how big is risk of radiation fails in installation places? Because of installation works urgency– is it possible to install electronics and perform the tests later? In that case: Can we treat temporarly our components locations as ‘radiation safety’ areas? According to problems with Xilinx XC95.. CPLD family we can change it for Actel ProAsic3, but is it really necessary in this case? ADC tests: AD7730 & future SAS generation...