M Flughafen München GmbH, Servicebereich IT, 13.03.2007 Information for ACI Workgroup IT Timeframe: Airport: Date: – November 2007 München 12.12.2007 Madrid.

Slides:



Advertisements
Similar presentations
David Gamper, Director, Safety and Technical Affairs ACI World PRE-CONFERENCE WORKSHOP for the ICAO AIR NAVIGATION CONFERENCE ICAO HEADQUARTERS MONTREAL.
Advertisements

Slide 1 NEWSKY – NEtWorking the SKY for aeronautical communications Michael Schnell, Sandro Scalise German Aerospace Center (DLR) Institute of Communications.
Airside Capacity Enhancement
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
Ames Research Center 1October 2006 Aviation Software Systems Workshop FACET: Future Air Traffic Management Concepts Evaluation Tool Aviation Software Systems.
Panorama Consulting Group LLC ERP Assessment, Selection, and Planning SAMPLE APPROACH.
Tech Indira IT Solutions Pvt Ltd
Web Content Management Hosting & Consulting Service UCLA CITI, February 9, 2011 Rose Rocchio, Albert Wu.
TELECOM Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G : losing or keeping time ? Topics Topics Radio Radio Video Video.
Dubai Government Policies for Enhancing the Competitiveness of Multimodal Transportation and Logistics Cluster June 2014.
Electronic Business (MGT-485)
Adding WAN Optimisation to Boost Storage Sales Success Blue Coat in a Virtual World.
Ballina Byron Gateway Airport Presentation November 2012.
Best Practices in Deploying a PKI Solution BIEN Nguyen Thanh Product Consultant – M.Tech Vietnam
1SWIM-SUIT Public Launch – 23 April 2007 System Wide Information Management in OATA Bert Nijhof OATA Technical Manager EUROCONTROL DAS/SAS/OCA.
Brussels December 5,20021 New Technologies and Airport Management Presented by Cesare Bernabei Università di Piacenza & Politecnico di Milano January.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
 Brandon Watson Director Microsoft Corporation BB56.
Business Productivity Infrastructure Optimization The Business Productivity Infrastructure Optimization Campaign For Microsoft Office 2007 Module 25 –
OnlineOn Premises Hybrid Cloud on your terms Messaging Voice & Video Content Management Enterprise Social Reporting & Analytics Best experience across.
Infrastructure Security Leveraging the ITS Experience Base Presented at ITS America Commercial Vehicle and Mobility Forum K.K Saxena, CCP Principal Kimley-Horn.
ICAO-IATA Cross-Border ATFM Workshop
1 Joan Sollenberger, Chief Office of Strategic Development Division of Traffic Operations, CA Dept. of Transportation (Caltrans)
TAMs – Total Airport Management Systems
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
IP TELEPHONY AT THE AUSTRALIAN CATHOLIC UNIVERSITY A CASE STUDY WIL DANIELS MANAGER, INFORMATION TECHNOLOGY SERVICES.
ACI Apron Safety Survey Issues, Discussion, Solutions.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
Novell Compliance Management Platform Update CMP & CMP Extension for SAP Environments Leo Castro Product Marketing Manager Patrick Gookin.
What Is Multilateration Triangulation System Uses Aircraft Transponder Multiple Ground Receivers Central Computer Calculates & Displays Aircraft Position.
AVINOR FLYSIKRING AS AVINOR AIR NAVIGATION SERVICES INVESTMENTS AND FINANCING FOR AVINOR DEPLOYMENT PER INGAR SKAAR.
Presentation of the TITAN project for the stakeholders.
ICC Copyright 2005 Ifield Computer Consultancy Ltd., Commercial in Confidence Ifield Computer Consultancy Limited Grapevine Texas November 2005 Delivering.
© 2011 LAIC Aktiengesellschaft © Ifield Computer Consultancy Limited 2013 ATRAK-AISS Aeronautical Information System Services.
C-ATM User Group and ASAS…….. Presented on Behalf of the C-ATM User Group Billy Josefsson, LFV Group ASAS Thematic Network 2, Malmö /28.
HUSKY CONSULTANTS FRANKLIN VALENCIA WIOLETA MILCZAREK ANTHONY GAGLIARDI JR. BRIAN CONNERY.
Benefits of CDM Within AFI Region Presented by: Mikateko Chabani.
COLLABORATIVE DECISION MAKING
Michael Przytula Senior Solution Architect HP Services, Asia-Pacific & Japan.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
Momentum. Strategy & Roadmapping Business Analysis Information Architecture Usability / User Experience Rich Media Social Media (Web 2.0) Interface Design.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
Secure Data Exchange Service A Service to Service data exchange, providing data securely and electronically in real-time between two or more State entities.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Overview of SAP Application Services By Accely. Introduction Developed organizations in any business industry will invest in SAP programs to offer progressive.
Business Intelligence dan Dashboard Ensys – minggu ke 6.
Digital Asset Management & Storage Program Program Summary
Aviation System Block Upgrades and NAV CANADA Planning
Work in Progress Build Safety Together
Upsell Small Business Customers to an Office 365 plan
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
The Role of Air Traffic Control in A CDM ENVIRONMENT
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Building A Repository for Digital Objects
Company Getriebebau NORD GmbH &
Fujitsu Service Portfolio for SAP IT Infrastructures
Airport-ANSP Growth & Efficiency ACDM-CATFM
DATA LINK IMPLEMENTATION IN EUROPE
Bringing Large Commercial Airport Capabilities to Your Local Community
Teledyne DALSA – Prophix story
Project Advance Introduction.
Presentation transcript:

m Flughafen München GmbH, Servicebereich IT, Information for ACI Workgroup IT Timeframe: Airport: Date: – November 2007 München Madrid

m Flughafen München GmbH, Servicebereich IT, Overall Airport Figures - 11/2007 Timeframe: High Pax increasement Project 3rd Runway New Freight Forwarders Building opened 11/2007. New 3 star Hotel (Building works started 11/2007). „Best Airport in Europe“ and rank 4 worldwide (Skytrax 2007). Pax [Mio. Pax] Revenue [Mio. €] Qualitative 2007 act./act. 2006: +10,7% YTD: 31,5 Plan YE: 32,5 FC YE: 34,2 YTD: 700,9 Plan YE: 741 FC YE: >750

m Flughafen München GmbH, Servicebereich IT, Runway

m Flughafen München GmbH, Servicebereich IT, New Freight Forwarder Building

m Flughafen München GmbH, Servicebereich IT, Service Division IT Organisation change (split of service field “Operation” into “Operation & Service” and “IT Engineering”) New business unit for IT Consulting (focus on external market) 2nd ISO Audit (06/2007). Product management established. Heavy price pressure from airlines (special LH) IT-Cost / FMG-Revenue [%] YTD: 3,0% Plan YE: 3,3% FC YE: 3,2% Qualitative - 10/2007 Timeframe:

m Flughafen München GmbH, Servicebereich IT, APM (Airport Process Management Suite): New Application Framework for traffic related applications APM RealTime : localization and status information for 600 Apron vehicles (Ressource and process optimization); Implementation finished by year end; CDM: Collaborative Decision Making (together with ATC, Airline, Airport and Eurocontrol SAP RE/FX: Implementation finished by 01/2008 Upgrade to SAP ERP 2005: done in 06/2007 Identity Management: Pre Study finished, Product Evaluation, Implementation with single sign on and 2 factor authentication in 2008 Office 2007: Implementation and Migration concept in work; start of operation planned for Q3/2008 LH-Wartelistenanzeige am Gate flächendeckend umgesetzt Document Management System: System ELO in implementation Application and system projects - 11/2007 Timeframe: Service Division IT

m Flughafen München GmbH, Servicebereich IT, A irport P rocess M anagement Suite The modular solution for complete airport management and control APM

m Flughafen München GmbH, Servicebereich IT, APM Service Bus CORBA, XML APM Real Time APM Access APM Base Data Store APM Ground Control APM Recon APM Bag Control APM Planning APM Apron Control APM Terminal Control APM Gate Control APM Hub Control APM Airport CDM APM Service Bus CORBA, XML APM Real Time APM Access APM Base Data Store APM Access APM Base Data Store APM Ground Control APM Recon APM Bag Control APM Planning APM Apron Control APM Terminal Control APM Gate Control APM Hub Control APM Airport CDM APM Architecture Voice Video Location A irport P rocess M anagement Suite Integration of real time information

m Flughafen München GmbH, Servicebereich IT, UDS (Universal Display System): Migration to new platform with functional enhancements Voice-Communication: Pilot for VoIP with Alcatel implemented (~ 200 Users); Start of added value applications in 12/2007 (Web-CTI, Collaboration) Multilateration / sensor data fusion: localization of aircrafts; joined project with DFS; Status: Implementation with ERA Digital Trunk Radio: Motorola Dimetra (Tetra) is in operation; Rollout of handsets - Q2/2008 WLAN: Upgrade of WLAN Access Points to CISCO Airspace done Storage: Migration to new storage technology done in Q2/2007 (EMC 2 ) CCTV: RFP started in 12/2007 Operation & Service / IT Infrastructure Engineering - 11/2007 Timeframe: Service Division IT