IN GOD’S HANDS SERVICE CAMP 2013 Attended by Ruth, Barb, Carrie, Gilda, Patty, Martha Karl, Keith, Paul R., Ayars Parker, Kevin, James, Hunter and Chaplain,

Slides:



Advertisements
Similar presentations
Sunny day, installing exterior casings on the windows.
Advertisements

Working Journal Chad Fernelius. Dayt Construction Internship 2006 Projects: Huish Detergents (converted a warehouse into a production facility) Farmington.
S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725.
Work Weekend Projects Projects that need to be done around Lyrecrest.
LMS Teach-To’s FAQs What are Teach-To’s? – Expectations and specific guidelines for how we are to act, how we are to respond, and what we are.
This is a Redneck “Handy Man’s” reference book. Feel free to use any of the ideas. (Click to See Next Slide) Not responsible for fires, flooding, electrocutions,
When the floors are in position they are left a few weeks to dry. Meanwhile various tradesmen can start to put the finishing touches to the building, both.
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
Mrs. Reeves’ 5th Grade Classroom Procedures.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
Mrs. Eagle’s Expectations for Student Success
Objectives : ANALYZE home maintenance techniques.
Architectural Elevations
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
How to update your kitchen for under $1,000. This is the before picture Here were some of the issues: –Kitchen has 30+ year old cabinets. The white dishwasher.
IET 120 CONSTRUCTION PROJECT Name: David Marcum. Dwelling  Number of Floors 2 Place image of your floor plan in this space.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
Constructing Homes and Other Buildings
Renovation 2014 Preserving the Past | Preparing for the Future The renovation we are planning seeks to preserve the past by maintaining the character and.
Dave Brake, Darren Adams, Sean Tobin Charmaine Dean, Jessie MacDonald.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Opening School Checklist Below is a reminder list of “Things to Do” for Opening School Tasks to help you keep track. Thanks for working to check off the.
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
Chapter 35 Section Layout.
Planning Living Areas.
Congregational Informational Meeting May 23, 2011 Statesboro First United Methodist Church.
Mason Creek 7 th Grade Procedures. Agenda  Students are required to get it signed each night.  The 5th period teacher will check each Friday for signatures.
Finishing the Building
Chapter 23 Elevation Layout and Drawing Techniques.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
Explain the benefits of exterior home care Analyze home maintenance techniques.
Getting Ready Gather tools, oil and filter. If you plan to change your oil regularly, consider investing in jack stands, a socket set and an oil drain.
PAST CONTINUOUS TENSE &
St. Peters School Carpeting and Refresh project October 5,6 and 7 th St. Peters School Carpeting and Refresh project October 5,6 and 7 th
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
New Nation School, Site Nursery School Currently housing senior school Playing field Bus drop off point Site of Senior School Site of Junior School.
Planning began in November 1985 and the house was completed in June 1987 House was designed and supervised by Bill Parks of Elem Valley Log Homes.
Interior House Painting Techniques Ph , URL:
Interior Painting How to paint like a pro.. Step 1: Preparation Remove as many items from room as possible Cover any remaining furniture & floors Remove.
Interior Design I 9.00 Home Maintenance Explain the benefits of interior home care.
Chapter 7 : Construction 1. Adobe – a mixture of clay and straw used as a structural material in the Southwestern United States.
Albany Town Hall Restoration Project 2010 The Albany Improvement Association would like to show you what your generous donations have allowed them to accomplish.
Aquarium Set-Up 20 gallon Penguin Biowheel. Safety First Electrocution is real; use drip loops Wet floors are slippery- always walk with caution Place.
9.02 Exterior Maintenance and Cleaning. Roof, Gutters, Downspouts Check roof for leaves and twigs as they contribute excess moisture that can cause rot.
Pros and Cons: Wooden Deck vs. Concrete Patio Before you decide whether to build a wooden deck or a concrete patio, just make sure that your site is low.
House Painting Checklist – 7 Steps to Prepare Wall Surface for Painting Contact No : Address : 8 parr street, Toronto,
When all the walls have been coated with Carlite finish and dried the plumbers can return to fit all the necessary pipe work and the radiators. Then a.
Flagler County - Princess Place Preserve Riding Stable Restoration Tourist Development Council December 16, 2015.
Mrs. Chelsea’s 4 th Grade Class Welcome to our class!
Exterior Maintenance and Cleaning
Installation Walkthrough Image Guide
Miss Boeck’s Second Grade Shields Valley Elementary School
UT House Medics 2017 About the House – Mrs
203 Jefferson Restoration
Objectives : ANALYZE home maintenance techniques
Objectives : ANALYZE home maintenance techniques
Disaster Mitigation Techniques for Householders
Mrs. Black’s Classroom Expectations
Elevation Layout and Drawing Techniques
Beginning of the Year Procedures
5th Grade Mrs.Dee Mrs.Dina
Nielson Homes Design Competition Finished Sq. Ft. Rambler
Elevation Layout and Drawing Techniques
Open House Tips for Sellers
Exterior Maintenance and Cleaning
RPC Renovation and Addition
Beginning of the year procedures
Miss Boeck’s Second Grade Shields Valley Elementary School
Presentation transcript:

IN GOD’S HANDS SERVICE CAMP 2013 Attended by Ruth, Barb, Carrie, Gilda, Patty, Martha Karl, Keith, Paul R., Ayars Parker, Kevin, James, Hunter and Chaplain, Jane

JUNE , 2013 “Let each of you Look not to your own interests, But to the interests of others.”

GOOD FELLOWSHIP ROOM Since it was raining at 8:00 AM, plans were discussed early Monday morning

Mr. & Mrs. Curtiss’ Home Build a handicapped ramp & deck Replace the rotten boards on the shed Paint the new boards on the shed Paint the windows Paint the cinder blocks around the house

The Curtiss’ home before we began

Karl scraped the siding before it needed to be painted.

Gilda paints

Carrie mostly paints the building

Meanwhile, the fellas are working on the old steps.

Ruth and Carrie give the shed a coat of paint.

Lunch break with Jane bringing us the message.

Posts were set in concrete and made level.

James supervises the mixing of the concrete.

Painters clean up the brushes, but not themselves.

Karl replaces the trim on the shed.

Building the supports for the deck and ramp

Putting the decking down

Keith and James creating the ramp

James testing out the deck while Gilda and others watch.

Carrie painting the foundation

Ruth found it necessary to trim the bushes before painting the foundation.

Karl & Kevin measuring to replace boards.

Putting the decking down.

Using their feet to hold boards in place

Parker & Keith setting the rest of the ramp.

Getting ready to put on the railings

Ruth, Kevin, & Martha finishing the ramp.

The decks and ramps finished.

Parker & Keith measure for the railings

Gilda painting under the eaves

Cutting the boards to fit properly

Ayars making adjustments underneath the deck

Creating the steps that go toward Mr. Curtiss’ workshop

Sue Anne dropped by for a visit

Ms. Mayflower’s Home Gutters on the back of her house Covered the eaves on the porch we built two years ago Placed flex hoses and splash guards

Materials ready for the other site

Kevin takes a nap while waiting for the homeowner.

Gutters put up and drain pipes set in place

Work began at the second site

Kevin and Karl placing the gutters

Flex hoses are attached to the downspouts

Splash guards are placed on others.

Finished job

A visit to the Charles City dump to get rid of our site trash

Project finished

In front of the newly painted shed

Ms. Brown’s house August 22, 23, & 25 & 30 Ruth Adams Kevin Cornelius Keith Fuhrmeister Ayars Lore Martha Martin

Two full days & two part days Remove everything from her enclosed porch. Pull out the flooring. Replace the floor joists. Cleaned the furniture, including freezer Repair the washer connections Replace the sub-floor & floor Repair & replace ceiling tiles

“Hand me one of those…..”

Measuring and setting the joists for the floor.

Tools ready to be used in repairing the floor.

Ruth standing next to a recently cleaned door.

Painting the Education Wing September 3 – 4 – 5 Take everything off the walls of the hall Paint the entire hall, including doorway trims Paint Primary Classroom Paint Mary Minter Classroom Paint lower half of Good Fellowship Room Replace switch plates overall

Karl prepares the hall to be painted.

Painting the hall

Finishing touches and clean-up

THANK YOU CONGREGATION FOR THE FUNDING PAINTERS: Ruth Adams Marian Davis Paul Davis Karl Dydak Ayars Lore Barbara Lore Martha Martin