Newark CSD Phase II Capital Improvement Project Board of Education Report August 2013.

Slides:



Advertisements
Similar presentations
Update on FCPS Construction/Renovation Projects June 2009.
Advertisements

Update on FCPS Construction/Renovation Projects July 2009.
West Elementary School May 16, % Construction Documents.
Update on FCPS Construction/Renovation Projects September 2009.
Update on FCPS Construction/Renovation Projects May 2009.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Update on FCPS Construction/Renovation Projects August 2009.
Current Project Update October 25th 2012 Good Evening!!!
Bryan Station Middle – Renovation Architect: Clotfelter-Samokar Architects General Contractor: Preston Construction Group Substantial Completion Date:August,
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Capital Project Presentation As approved through formal resolution by the RCS Board Of Education on March 11,2015. This new presentation outlines the $750,000.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
Madison Elementary School District #38 Construction update Bond & Capital 6/5/12.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Madison Elementary School District Bond Project Update August 2013.
Proposed Budget Presentation APRIL 21, 2015.
Bryan Station Middle – Renovation Architect: Clotfelter-Samokar Architects General Contractor: Preston Construction Group Substantial Completion Date:August,
Presented by: Jane Briggs and Karen Mitchell October 11, 2007 The New LEED Building at Shady Grove.
Agenda Item # 20 Discussion and possible action to approve construction Change Orders.
Experience the verve of living by the banks and drift through the historic and scenic beauty of Pasig River. Project lot area composed of 14,000 square.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Rio Del Oro Riverside Meadows Cobblestone. Plumas Lake Elementary School District ( Maintenance Department ) Here’s the life cycle I use for our Deferred.
2012 Planned Facilities Reconstruction Project. Planned Facilities Reconstruction Health & Life Safety Energy Conservation & Management Security Upgrades.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Elevations, Layout and Drawing Technique.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
School Opening Readiness Highlights Report of the Superintendent August 20, 2015 Superintendent Evaluation Rubric Standard I, Indicator I-B,
DER – Before, During and After: A Homeowner’s Perspective.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
Bond Expenditure Report Per A.R.S. § (K) 7/1/13 - 6/30/14.
Winchester Medical Center Campus Expansion June 21, 2011.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
Cuba-Rushford CSD Capital Project
White Pigeon Community Schools
April 2016 Bond / Facilities Update Presentation
Bond Oversight Committee
Cornwall Central School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Capital Improvements Presentation
October 2017 Mustang panther package b update
Dr. Joseph Meloche Superintendent of Schools Mrs
May 8, 2018 Bond Program.
Troy School District Bond Program – Series 1 Construction Update
2007 Bond Issue Capital Improvement Program
LONG LANE GROUNDS GARAGE SECTION EXISTING CONDITION PHOTOS
Capital Outlay Workshop
Mount Vernon Community School
Troy School District 2013 Bond Program – Series 1 Construction Update June 2016 Barton Malow | TMP.
Elevations, Layout and Drawing Technique.
PARK EAST CONSTRUCTION
Moving from Consumers to Producers Kings Park Central School District
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

Newark CSD Phase II Capital Improvement Project Board of Education Report August 2013

Sanitary Storm Sewer Work at Wood Lane Drive Adjacent to Bus Garage Sanitary Storm Sewer Work at Wood Lane Drive Adjacent to Bus Garage Installation of Perkins Elementary Roof Installation of Perkins Elementary Roof

High School Cafeteria Demolition and Interior Wall Construction High School Cafeteria Demolition and Interior Wall Construction

High School Access Road Site Work And Curbing

Kelley Intermediate Retaining Wall

High School  New Corridor Ceiling System and Lighting  Turnover of New Food Service Office  Boiler Feed Tank and Condensate Feeds  “B” Shift New Corridor Wall Tile Work Will Be Underway  New Doors and Hardware Will Be Proceeding After School Hours Middle School  “B” Shift New Corridor Wall Tile Work Will Be Underway  New Kitchen Grease Seperator Will be Completed Kelley Intermediate  New Nurse’s Office Will Be Turned Over For District Use  Kitchen Tile Work Is Anticipated To Be 80% Complete With The Balance Being Completed During “B” Shift  New Kitchen Grease Seperator Will Be Completed Lincoln Elementary  Door And Hardware Replacements Ongoing Perkins Elementary  New Kitchen Grease Seperator Will Be Completed  Sheet Metal Trim Work On The Roof Will Be Substantially Completed Site Work  Anticipate Having All Asphalt Binder In Place At Paving Locations, Top Coarse To Follow