Plant in Saudi Arabia Case story for Nose Ring Castables D52A.

Slides:



Advertisements
Similar presentations
Schmidt & Danielsen a/s –Establised in 1964 mainly as a service company in the refractory business without technical support. –In 1985 Søren Danielsen.
Advertisements

VORTEX FINDERS (DIP TUBES, IMMERSION TUBES)
HASLE REFRACTORIES A/S HASLE-ISOMEMBRANE® The ISOMEMBRANE® TECHNOLOGY
Furnaces also called Fired Heaters
CHOOSING AND INSTALLING MONOLITHIC REFRACTORIES ‘BOY’ ILANO III (PME) - President & GM 360 Degrees Marketing and Services Industry, Inc. ( Engineers and.
Portable Classroom Controls Project Chuck Collins RCM Meeting April 27, 2007.
HADI HAMAD AL-HAMMAM GROUP
5 critical areas in Cement plants
[Your company name] presents: Michala Homolova Personal Effectiveness – The Right Decisions Time Management & Effectiveness #6.
Cement industry of Vietnam Status and Prospective (Paper for CMT’s 9th Asia Cement Markets conference) 19-20th April 2007 Hanoi, Vietnam Presented by Chairman.
LIMESTONE CRUSHING PLANT LOAD MANAGEMENT Jaco Snyman
How much do you do?. What is a Boiler? A boiler is a vessel that is is under pressure and is being heated. The boiler will have a National Board # on.
GRATE COOLER Traditional grate cooler - TAD : circa 800 deg.C. Hot zone – cold zone.
Overhead Costs in Building Construction in Saudi Arabia Mohammad Al-Shahri Ahmed Al-Ojairi.
Writing a Memo Practical Skills for Work and Study Secondary 6.
CYCLONE ROOF – CAST LINING Country Czech Republic IndustryCement Plant group name: XX Plant name: XX Main equipment supplier: PSP (Czech Republic) Production.
Presentation of HASLE Refractories A/S Insulation and Heat Loss
Nominations and Scheduling Questar Gas Company Annual Account Management Customer Meeting Will Schwarzenbach Director, Gas Supply.
THE POWER IN A COMPANY (AUTHORITY, WHO RULES, WHO CONTROLS)
BOILER CFB 1 –ENGINEERED BY TERMORAK –HASLE MATERIALS –SUPERVISED BY TERMORAK –PRICE 100 % BOILER CFB 2 –ENGINEERED BY BOILER MANUFACTURER –UNKNOWN MATERIALS.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Jagadhri Brass and Aluminum Industries Cluster Jagadhri, Haryana State.
November 19, 2010 To contact the ‘publisher’ or to receive an copy of this update, please write to John Matranga at Volume 48,
14s-1Maintenance William J. Stevenson Operations Management 8 th edition.
Presentation of HASLE Refractories A/S Ceramic Diptube Case Story
CASE STUDY-MODULAR LINING AT SMOKE CHAMBER/RISER DUCT AT A CUSTOMER IN INDIA COMPANY OVERVIEW : The customer is a 25 years old, large Cement producer in.
1 Merger of PM and UHM as an example of the globalization of the Russian economy London April 2004 Pavel G Skitovich Deputy General Director Strategy and.
Why consider other Energy options for SingaporeWhy consider other Energy options for Singapore? In electricity tariffs in Singapore went up by 21.
REICHARD MASCHINEN, GMBH
California Air Resources Board Status of the Portable Fuel Container Spillage Control Regulations.
® July 30 th, 2014 Utah PSC Technical Conference.
Packaging.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Massachusetts Water Resources Authority Presentation to MWRA Advisory Board MWRA Residuals Processing & Agreement for Operation and Maintenance of the.
Connect With Concrete Cement Outlook: Ed Sullivan, Chief Economist PCA Electric Power Conference.
1 11/8/ Waste Pro of South Carolina and Greenspace Louis J. Diaz Region Vice President South Carolina and Coastal Georgia.
Faisal BaDughaish. 1. Oil Influences in Economy 2. Social Networks in Terrorism Activity 3. Music Influences using Magazines.
{ The Kingdom of Saudi Arabia Mr. Sweet 12/04/2015.
24x7 Support Ian Bird GDB 9 th September The response times in the above table refer only to the maximum delay before action is taken to repair.
1 Changes Brought by Implementing Regulations on Purchase / Sales of Cereals and Paddy Rice.
1/4/2016Eco Carpet Inc.1 Tech Coast Angels - Winner Best Investment and Presentation 2009 Phone:
Cement Manufacturers’ Association Special Meeting of Standing Linkage Committee (Long Term) for Power, Sponge & Cement Sectors Emphasis on Supply of Domestic.
Getting In and Out of Futures Contracts By Gregg Peat Alex Henshaw.
Oil Price Volatility Consequences & Policy Responses By Dr Avinash Chandra ED & Business Head - Oil & Gas Jindal Petroleum.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
CASE STUDY - BURNER PIPE AT CUSTOMER IN INDIA COMPANY OVERVIEW : The customer is a 50 years old well known Cement producer of South India. 5 advanced production.
1 EGTEI Expert Group on Techno-Economic Issues Latest news TFIAM Gothenburg 8-9 December 2005.
Presentation of HASLE Refractories A/S Ceramic Diptube Case Story at a plant in Thailand
Wheat and Feed Market In Saudi Arabia June 2012 Grain Silos & Flour Mills Organization Kingdom of Saudi Arabia International Grains Council By H.E Eng.
INTRODUCTION TO DEMAND SIDE MANAGEMENT(DSM) PRESENTED TO ZAMBIA ASSOCIATION OF MANUFACTURERS ENERGY EFFICIENCY AND CONSERVATION WORKSHOP 5-6 SEPTEMBER.
VDMA Monthly bulletin May 2016 | Volkswirtschaft und Statistik Monthly bulletin.
Include your name, address, and home and work phone numbers. Type your letter if possible. If it is handwritten, make sure it is neat and easy to read.
PEAK OIL PROBLEM By Nick, Max. THE PROBLEM Almost all of the oil in the world that could easily be harvested has been used up, but the demand for oil.
We at Boeing have noted your recent interest in some of our products, Phillip M. Condit Chairman of the Board and CEO - The Boeing Company Memorandum.
מאת: יעקב דדוש. פיסול –בין יחיד לרבים יחידה 1 לתלמיד המתבונן לפניך שתי יצירות פיסוליות. התבונן וכתוב (בשקופית הבאה) מהם ההבדלים בין הפסלים המוצגים לפניך?
Argentine Power Market Fuel Oil Use & Opportunities for the Future Central Puerto S.A. Fuel Oil / Energy Buyer’s Conference Miami, September 2000.
Saudi Aramco Prince Mohammad Bin Fahd University College of Engineering Department of Electrical Engineering Internship Presentation. At Consulting Services.
Ideas for today and tomorrow
APHIS Inspection Program
District-Wide Well Maintenance, Rehabilitation, and Repair
Chapter 16 Supplement Maintenance.
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
شركات المساهمة​ (corporations) Joint stock company
0845 Analysis I have only very recently taken over responsibility for the 0845 number and whilst questions were asked of Derrick some months ago, we have.
UNIDO ITPO ITALY/JUNE 26 Business plan presentation
Quinta Da Pedra: A Winery Producing a Variety of Wines
802.11F Meeting Report March 2002 Month 1998 doc.: IEEE /xxx
Joint Office UNC Elections
Joint Office UNC Elections
Joint Office UNC Elections
Presentation transcript:

Plant in Saudi Arabia Case story for Nose Ring Castables D52A

XX Cement Company Case story for Nose Ring – Castables D52A By The Production Chief, from the plant in Kingdom of Saudi Arabia And Kurt Christensen, Director AL-CEM Aps Bahrain

Case story for Nose Ring – Castables D52A

Problem: In year 2008 the plant was having a problem with the castables used in the Nose Ring in the Kiln. They used to stop the kiln after less than 6 months for repairing the nose ring and it was a big issue for the plant.

Case story for Nose Ring – Castables D52A Test of HASLE Refractories Castables D52A: The plant tested D52A in the nose ring, which was installed by the supervisor Mr. Bent Ole Lindahl, HASLE Refractories.

The plant - Case story for Nose Ring – Castables D52A Installation on site.

The plant - Case story for Nose Ring – Castables D52A Installation on site.

The plant - Case story for Nose Ring – Castables D52A Installation on site.

The plant - Case story for Nose Ring – Castables D52A Installation on site.

The plant Case story for Nose Ring – Castables D52A Results: By using HASLE Refractories D52A the plant was increasing the life of the nose ring to: 1 year. The result means: longer operation between the shut down.

The plant Case story for Nose Ring – Castables D52A From: Mr. XX Sent: 6. oktober :50 To: AL-CEM Bahrain; Lindhal Bentole Hasle Subject: FW: Kiln Nose Ring Photograph Dear Mr. Kurt, I am sending you a photograph of Kiln Nose Ring condition which was installed in second week of January,2011 and photograph was made in recent shut down in September,2011. This time we have taken annual shutdown earlier in September which was scheduled in January,2012 due to some other reason. We replaced brick lining in burning and transition zone but had minor repair of Nose Ring Castable. We did not go for its replacement due to excellent condition of castable and to avoid prolonged shutdown. Thickness of Castable was as good as new casted except few corners had worne out which were repaired by chipping, anchoring, fixing proper steel shuttering and pouring Hasle D52 Castable. We expect life time upto minimum 18 months and we shall try upto 24 months so that it should be replaced during next annual shutdown.This will help you in presenting company XX case study in Bangkok Seminar. Best Regards Mr. XX Manager Production The plant

Case story for Nose Ring – Castables D52A

After this good experience the plant has decided to continue to use the castable from HASLE Refractories. Recently they made contract with HASLE Refractories to use the castable for: -The kiln hood - Grate cooler - The Bull nose. The local Contractor for installation is KARRENA as arranged by AL-CEM APS.

Case story for Nose Ring – Castables D52A

The company is a Saudi joint stock company which was established in 2005 and being headed by H.R.H. Prince Faisal Bin Abdul Majeed Bin Abdul Aziz Al-Saud (Chairman of The Board). The company began the first production line in July, 2007 with a nominal capacity of 5,000 tons per day. Due to increasing demand in the domestic market and neighboring countries, the board had decided the establishment of the second-line with the same capacity which has been come into stream in April, 2010, while both lines have an in-built capacity of 11,000 tons/day.

The plant - Nose Ring – HASLE Castables D52A Country Kingdom of Saudi Arabia IndustryCement Plant group name: The plant Plant name: XX Main equipment supplier: Sinoma, China Production capacity / line - design: 5000 TPD Number of production lines: 2 Run factor 0,93 Fuel Types Gas First line started in year 2007 Second line started in Year2010

Case story for Nose Ring – Castables D52A Chemical and physical specification of the cement type: 1.Ordinary Portland cement (OPC-I) as per SASO 143 specifications 2. Ordinary Portland cement (OPC-II) as per ASTM-C150 specifications 3. Sulphate Portland cement (SRC) as per SASO 570 / 1994 specifications

Case story for Nose Ring – Castables D52A Conclusion. By using HASLE Refractories D52A for the Nose ring: The operation time has been increased: From 6 month to more than 12 month. RCC is expecting + 18 month.

The plant - Case story for Nose Ring – Castables D52A Installation on site A happy Production Manager:.