LIMESTONE CRUSHING PLANT LOAD MANAGEMENT Jaco Snyman 2012-08-15.

Similar presentations


Presentation on theme: "LIMESTONE CRUSHING PLANT LOAD MANAGEMENT Jaco Snyman 2012-08-15."— Presentation transcript:

1 LIMESTONE CRUSHING PLANT LOAD MANAGEMENT Jaco Snyman 2012-08-15

2 CEMENT MANUFACTURING

3 ENERGY USAGE OF THE CEMENT MANUFACTURING INDUSTRY Industry consume 30 – 70% of total energy Malaysia & Iran: 12 – 15% of industrial energy used for cement manufacturing Energy source: 75% Fossil fuel, 25% Electrical

4 ELECTRICAL ENERGY USAGE OF CEMENT PLANTS Typical 110 – 120 kWh per ton of cement produced

5 ENERGY SAVINGS – PREVIOUS STUDIES No comprehensive review on energy usage & savings up to 2012 Recent studies estimate: Grinding energy can be reduced with 10 – 20% by increasing mill efficiency & schedules. Waste heat from pyro processing can be used to increase efficiency with 2 - 10%.

6 ENERGY SAVINGS – CRUSHING PLANTS Why? Global cement production of 3.5 Gtons (2011) translates to estimated global crusher energy consumption of 12 282 GWh. 10% saving = 102 MW Daily energy efficiency Very limited studies on crushing plants

7 CASE STUDY - OVERVIEW OF THE CRUSHING PLANT Operate according to production requirements 2x 50kton Stock piles, one loaded and one reclaimed

8 REDUCING ENERGY COST OF THE CRUSHING PLANT 1. Determine required stock-pile levels using: Present stock levels (raw meal, clinker & cement) Sales forecast 2. Optimise crusher running schedule to: Avoid running during Eskom peak periods Maintain minimum required stock Accommodate optimised maintenance schedules 3. Update proposed daily, weekly and monthly schedules on a daily basis

9 RESULTS - ENERGY Proposed and actual baseline for April 2012

10 RESULTS - STOCK

11 CONCLUSION Savings not realised due to: Unexpected equipment failure Unexpected sales & lack of confidence in proposed schedules Negative attitude from personnel Average peak time saving of 1.2 MW possible in this study Global saving of 102MW possible, 50% in China Address challenges to realise potential savings

12 QUESTIONS ?