IBL IST G&S Integration Ned Spencer, UCSC July 15, 2011 7/15/11IBL IST G&S Integration1.

Slides:



Advertisements
Similar presentations
IBL Insertable B-Layer
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
Layer 0 Grounding Requirement in terms of noise performance Grounding/Shielding studies with L0 prototype Summary Kazu Hanagaki / Fermilab.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
3. Capacitance and dielectrics. 3 8 The potential difference between the plates of a 3 μ F capacitor is 100 V. How much energy is stored in.
Electricity --- Current and voltage. Summary of conductors and insulators Conductors – need free (mobile) charges In metals there are free electrons Insulators.
November Vertex 2002 Kazu Hanagaki1 Layer 0 in D0 Silicon Tracker for run2b Kazu Hanagaki / Fermilab for D0 run2b Silicon Tracker group Motivation.
Vertex2002, Kailua-Kona, HI 11/07/02 B. Quinn1 Carbon Fiber Grounding Issues in the DØ Run IIb Silicon Detector Design Breese Quinn Marvin Johnson, Mike.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
RINDEL Emmanuel – IPNO – Detector Dpt. – 19/10/2011APRIME HPS collaboration meeting 1/9 Ecal and vacuum chamber design Unité mixte de recherche CNRS-IN2P3.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
Analog Cable Status Basic design fixed --- the latest cable has good quality. (report by Frank) Capacitance for single cable ~0.35pF/cm --- both new and.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Mechanical Work Plan Discussion Bill Cooper Fermilab.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Jack Fowler Spain Workshop 2003 Faraday Shielding for Barrel TRT Jack Fowler Duke University Spain Workshop
Dry type transformers Zaragoza Aluminum vs. Copper
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
BTeV Pixel Substrate C. M. Lei November Design Spec. Exposed to >10 Mrad Radiation Exposed to Operational Temp about –15C Under Ultra-high Vacuum,
Positioning fork M. Ciappeti R. Vuillermet 29/09/20111.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
GLAST LAT ProjectSLAC, May 14, 2003 A.Brez 1 Honeycomb grounding of the GLAST trays Tray electrical conductivity: Carbon Carbon, carbon fiber and Al core.
Grounding Studies Metal box sensor SVX4/hybrid Analog cable GND(20W)
Grounding Guidelines Developed for LBNE
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 1 CFSS and ES electrical screening for SPD Harness RB24-RB26 Electrical.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
Evaluation of Modular Coil Cooldown Time with Thicker Insulation and Comparison of Original and Proposed Insulation Design H.M. Fan PPPL January 15, 2003.
Evaluation of Modular Coil Cooldown Time with Thicker Insulation and Comparison of Original and Proposed Insulation Design H.M. Fan PPPL January 14, 2003.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
FP420 R&D Project – Brainstorming session on mechanics 28 March 06 1 D. D. INFN To/CERN PH CMM FP420 Integration Environment.
Spacing of Cu clamp = 10” Clamp plate width = 2.5”, thickness = 0.375” Thickness of conductor insulation = 0.03” Thickness of coil ground wrap = 0.03”
ATLAS Inner Detector thermal study. The Inner Detector.
Thermal Screen Grounding CERN - Dec. 10 th, 2003 Enzo Carrone The thermal screen grounding and the tracker: a scary concert Enzo Carrone.
FEM/CFD thermo-mechanical analyses on IBL Mock-up A. Sciuccati.
Pixel upgrade test structure: CO 2 cooling test results and simulations Nick Lumb IPN-Lyon MEC Meeting, 10/02/2010.
Estimated total mass of new Beam Pipe and IBL package Y. Gusakov 3/2/2010.
Stave Core Electrical Considerations Ned Spencer (UCSC), Sergio Diez (DESY), David Lynn (BNL) Local Support Assembly, AUW Nov
Irradiations at Birmingham cyclotron Procedure 1.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
Thermal jumble! (Action list review) C. Marinas IFIC-Valencia DEPFET-Valencia 1 Valencia
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
Follow up of Soft clamps production & testing Thomas Kaltenbacher & Christine Vollinger LIU-SPS, 26/05/2016 Thomas Kaltenbacher.
HFM Test Station Main Cryostat
C.Clerc ILD session, ALCPG /03/2010
Status of Vacuum Flange Shielding/ Comparison of RF-shielding Designs
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
The 11T cryo-assembly: summary of design and integration aspects
TPC Support and Constraint TPC Support
CERN – GSI – TUD WEBMEETING
ATL-IC-ES new version available - approval starts
LHC INJECTION SEPTUM MSI (1/3)
LARP Phase II Secondary Collimator RC1
Authors: W. Chung et al, ITER Korea Highlights
STUB configuration Mats Pålsson
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

IBL IST G&S Integration Ned Spencer, UCSC July 15, /15/11IBL IST G&S Integration1

7/15/11IBL IST G&S Integration2 Beam Pipe Al Shield is part of Pixel Faraday Cage. Figure is from LHC-VC1-ES The Aluminum foil is our responsibility to connect and reference to our purposes. To avoid adding extra shielding, Pixel and IBL G&S need to be integrated.

7/15/11IBL IST G&S Integration3

Connection Tasks Create Faraday cage from IST and Beam pipe Al foil. How do we connect the beam pipe foil to the IST shield skin? Additional connections at same area, both ends: a)14 cooling tubes b)14 Data cable shields c)14 Power cable shields d)Pixel end plate e)Single earthing tie, one end 7/15/11IBL IST G&S Integration4

IST G&S Questions a)How thick should the IST Copper/Kapton mesh be (copper equivalent thickness)? b)How do we connect the 5 IST sections, so that they support the Faraday cage conductivity (low RF impedance)? c)What are the envelope requirements at the joints and the ends? d)Closer to the IST ends are the cross-section material constraints loose enough to use continuous Kapton sheets, unetched? e)How do we make RF connections at the ends f)Can the IST end seal be integrated with these electrical connection tasks. 7/15/11IBL IST G&S Integration5