Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 2011.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Instructions for making plunger fork tool. Drawing for the trigger assembly.
Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Robot Quick Build Session Transmission Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to.
Breaking, Measuring, and Adjusting Chain ~The most used drive system on a FIRST robot uses chains and sprockets. Understanding the proper techniques to.
Optical Manufacturing Solutions 1 Probe Assembly.
Peppermill Demo Bayou Woodturners Demonstrator Jim Shackelford November 2009.
Build the Tumbler.
Here is the broken line. Step 5: Break loose encasing seal. With bar in vice as show, hit with hammer to break loose. Usually 2 or 3 hits will break loose.
ZIPP 404 BEARING REPLACMENT GUIDE Tools Needed:
Click on this image to open the full PDF document.
C-Base Transmission Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Yamaha oil pump rebuild
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Step-by-step assembly instructions
MyLock 644D Service Seminar.
Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
Typical Walk-in Closet with elfa® décor
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Pneumatic Arm Assembly Instructions
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Specification section 3.3
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Service Seminar Model MB4.
Vex 1.0 © 2005 Carnegie Mellon Robotics Academy Inc. Fasteners.
Wheel Bearing Service. - Remove the cap using a flat head screw driver or pipe pliers. Careful not to damage the cap.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Hand-cranked Windmill Assembly Instructions copyright Mechanical Kits Ltd
Robot Quick Build Session RQBS Intro - Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
1. b. Rip Saw 2. d. Used for cutting with the grain.
Fasteners and Thread Repair
Introduction Produced by Ron Markum, Team 1750 Ed Latimer, Team 476 Ken York, Team
Automotive Chassis Systems, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle River, NJ All.
Fasteners and Thread Repair 08 Introduction to Automotive Service James Halderman Darrell Deeter © 2013 Pearson Higher Education, Inc. Pearson Prentice.
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
Introduction Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
WeldingRod’s Exactly Constrained 3D Printer Plate Identification and Stuffing.
Build A Motor You must follow the directions step-by-step!
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Assembly of steering.
VIEW SERIES with Sliding Door
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Assembly Instructions:
Bilge Pump Service Project Model Service Kit
2017 PWNAGE 8WD WCD CHANIN IN-TUBE CHASSIS ASSEMBLY INSTRUCTIONS
Automotive Engines Theory and Servicing
Hand-cranked Windmill Assembly Instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Teacher training resource: Robotic Assembly
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Hydraulic Arm Assembly Instructions
Activity 2.2.1a Action Reaction Construction Guide
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-Step Assembly Instructions – Cube Version
Teacher training resource: Robotic Assembly
Step-by-step assembly instructions
Step-by-step assembly instructions
Automotive Engines Theory and Servicing
Presentation transcript:

Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team

Kitbot Frame Assembly Instructions This PowerPoint contains instructions for assembling the 2011 C-base frame kit from AndyMark, Inc. It is meant to be supplemental to the User Guide that is included in the 2011 AndyMark kit. AndyMark 2011 C-Base Frame Parts

This PowerPoint assumes you will be making a ‘narrow’ 27” x 37” robot, meaning a 27” front and back and 37” sides. This is because the Electronics Board for the RQBS robot is sized to fit those dimensions. You can also make a ‘wide’ robot 37” x 27” but you will then need a different sized electronics board. This PowerPoint builds a 6-wheel robot. You can also make one w/ 4 wheels. The 6-wheel design has slightly lower center wheels to make it easier to turn. The robot will ‘rock’ slightly on hard surfaces, but not too badly on the carpet that has been historically used in FIRST arenas. Final C-Base Frame: 27”x37” ‘Narrow’ Robot with 6 wheels AndyMark User Guide Pg. 13, Step 1 Decide on Robot Setup

This is what you should have: 4 original rails, 2 rails cut to 27” File the ends after they are cut. Have 2 of the 6 rails cut to make them 27” long. There is a reference hole marking this location on each rail. Prepare Rails AndyMark User Guide Pg. 13, Step 2 Cut 2 rails to 27” long

Install Corner Connects AndyMark User Guide Pg. 14, Step 3 Parts For This Step Corner Connects¼-20 x 1.75” Socket Head Cap Screws w/ Nylock Nuts

Insert the frame connectors into the end holes of the 4 long rails (not the 2 cut ones) and get a 1.75” long frame bolt through the ‘ears’ on the connector. Put on the nylock nuts and tighten them. Repeat for both ends of all 4 long rails. AndyMark User Guide Pg. 14, Step 3

When you are done it should look like this. 27” cut rail Long rail The frame connector for the inside rails goes in the 4 th and 5 th holes from the end of the cut rail. Assemble 4 Side Rails to Ends AndyMark User Guide Pg. 14, Step 4 Note !!: For making a 6-wheel robot, be sure and assemble all 4 long side rails with the center hole ‘down’ as shown in this picture. This will lower the center wheel and make it easier for your robot to turn. Install Nylock nuts. See next slide about tightening them.

Squaring the Frame (optional) It is better to square the frame as shown this slide, but if you are in a hurry for the RQBS then tighten them as is. You can always loosen them later and square it up. Either tighten as is …….….. or square while tightening.

Assemble the Wheels AndyMark User Guide Pg. 15, Step 5 Parts For This Step Bearings Self-tapping x ¾ Screws Sprockets Wheels

Place a bearing in the wheel hub and press it squarely into place. If you can’t get enough force to bottom it out in the wheel hub, tap it into place using a non-mar hammer (shown), or using a block of wood on top of the bearing and a regular hammer. Tap it – don’t strike it too hard! Put a bearing on each side of the hub (2 per wheel). Repeat for all 6 wheels.

Use a low clutch setting on the drill to avoid stripping the threads in the plastic. Install a sprocket on two of the wheels (after bearings are installed) using the self-tapping screws. Completed wheels.

Install the Wheels AndyMark User Guide Pg. 15, Step 6 Parts For This Step 3/8-16 x 7” long hex head screws w/ nylock nuts Spacers for axles, 6 long and 6 short

All 6 wheels axles gets a long and a short spacer. The order that they go on the axle (long spacer inside or outside) is not important for the RQBS because you build a 2-wheel drive robot. If you are later planning on 4-wheel drive, then the spacers on the drive wheels need to be installed in a staggered pattern to accommodate 2 chain sprockets on each side. For the RQBS 6-wheel robot, the 2 wheels w/ sprockets go on the middle axle, sprocket facing inside.

1. Put the long screw through the frame hole and through a spacer. 2. Put the long screw through the wheel next. (For middle wheels, sprockets face inside.) 3. Put the long screw through the other spacer and through the hole in the other frame piece. 4. Tighten the nylock nut, but not tight enough to bind the wheel when it turns.

Repeat for all 6 wheels, making sure the 2 wheels w/ sprockets are in the middle of each side with the sprocket facing inside. The frame should now look like the picture above. You will need the transmissions assembled (shown) before going to the next step.

Install the Transmissions AndyMark User Guide Pg. 16, Step 7 Attach each transmission to the frame with ¼-20 x 5/8” Socket Head Cap Screws, washers, and nylock nuts through the slots in the bottom of the frame. Do not tighten them. You will do that later after the chain is installed. The transmissions go on the frame behind the middle wheels. You can choose whichever pair of frame holes you want – the chain will be cut to length to fit whatever you choose.

Install the Support Rods AndyMark User Guide Pg. 16, Step 8 Install the support rods (cross hex tubes) in the top corner of the transmission frame, then install ¼-20 x 1” long hex screws as shown above and tighten.

Your robot should now look like this.

Install the Transmission Output Sprocket AndyMark User Guide Pg. 17, Steps 9 & 10 Note: The output sprocket may already have been installed since the RQBS Transmission PowerPoint showed instructions on this. We did this since the transmission assembly generally goes must faster than the frame assembly. So skip the steps on this page if yours already has the sprockets/spacers installed. 1. Take off the end screw and washer if installed. 4. Install the thin white nylon shaft spacer, ¼” washer, and ¼-20 x ½” screw. Tighten the screw. 3. Put on the output sprocket. 2. Remove the machine key piece, put on the black shaft spacer, and reinstall the machine key.

Cut the Chain AndyMark User Guide Pg. 18, Steps 1 & 2 To determine the chain length, lay the chain across the two sprockets. Then slide the transmission assembly (bolts should be loose) towards the wheel all it can go and find the nearest chain link to cut. Then cut the chain. If you have never measured and cut chain before, you need to find somebody experienced in this to help you do it correctly.

Install the Master Link AndyMark User Guide Pg. 18, Step 3 1. Insert the master link to connect the chain ends. 2. Put on the flat plate. Make sure it is pushed down all the way and lays flat, otherwise the clip won’t snap on. 3. Install the retaining clip.It should look like this when done.

Tightening the Chain AndyMark User Guide Pg. 18, Step 3 1. Once the master link has been installed, tighten the chain by first pulling back the transmission base (remember the screws should be loose so it slides)…. 2. ….. and while keeping the chain taut tighten the bolts holding the transmission to the frame.

Congratulations! You’re Done with the Frame !!! Now wait for the finished Electronics Board assembly. Then install it on the frame, wire the motors, and test it !!