ESTABLISH A NORTH-SOUTH PARKWAY The LNTC and the towns should plan for a parallel north-south parkway that will expand the commuter rail impact area to.

Slides:



Advertisements
Similar presentations
1 Transportation Update for Loudoun County Presentation to DATA June 23, 2010.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
State of Morrisville Mayor Mark Stohlman July 17, 2014.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Comparative Traffic Study Morrisville-Carpenter Road versus Crabtree Crossing Extension Presentation to: Morrisville Town Council Prepared by: Parsons.
US 52 Corridor Study Public Meeting November 15, 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Contact: Beth Morris
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
DISTRICT 1 November 2014 DONNIE DREWER DISTRICT ENGINEER.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Navigating the Path to Complete Streets Strategies for Implementation January 30, 2014 RI League of Cities and Towns Annual Convention This Grow Smart.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Community Development Department Construction Phase BULLDOG DRIVE.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
NC 73 Development Regulation Comparison January 19, 2006 NC 73 Council of Planning.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Signs Signals and Pavement Markings
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
 Rice Street Traffic Study Proposal Presentation to the Saint Paul CIB Committee March 31, 2015.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
Cornelius Candidate Projects For Funding Total Candidate Projects$ 22 million –Rail Improvements ($10 million) –Local CIP Projects NC-115 upgrades ($ 1.9.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
HB 277 Regional Transportation Sales Tax Preliminary Project List Presentation Mayor and City Council Work Session March 1, 2011.
Objective & Goals The objective of this presentation is to build on the Charrette and Museum Project recommendations and present infrastructure upgrades.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Approve Humboldt Avenue Pedestrian and Bicycle Improvement Project Plans.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Ayers/Saint/Gross Architects and Planners DAVIDSON CONCORD FRAMEWORK PLAN CONCEPTS.
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
City of Toledo Bancroft Street, Secor to Parkside Project Public Meeting May 12, 2016.
Bicycle Safety Countermeasures Module 4.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Arizona Forward Update
MD 30 (Hanover Pike) at Mt. Gilead Road
District 3 Complete Streets Projects
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
River to Sea TPO Meeting US 92/International Speedway Boulevard
Kerr Tar Project Update – June 2016
Transportation Projects
North Main Street Intersection Improvements at Route 460 Bypass
Early Voting Starts Oct. 20 | Election Day Nov
1200 West Widening and Reconstruction Project
Lenoir County Comprehensive Transportation Plan DRAFT Maps and Recommendations John A. (Andy) Bailey April 9, 2018.
Comprehensive Transportation Plan
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

ESTABLISH A NORTH-SOUTH PARKWAY The LNTC and the towns should plan for a parallel north-south parkway that will expand the commuter rail impact area to the east, roughly along Prosperity Church Road from I-485 north. Ridership will continue to be a major consideration in justifying funding for any major capital investment in transit. Increased connectivity and capacity enhancements west of I-77 and east of the rail line, all feeding the rail investment, should enhance the ridership base. Even with expanded ridership, however, automobile access will still be a very important factor in the success of a TOD.

4 LANES W/BIKE LANES, SIDEWALKS ON BOTH SIDES, PLANTING STRIPS 4 LANES FROM HUNTERSVILLE ROUND ABOUT 2 LANES, DIVIDED W/TURN LANE, ROUND ABOUTS, MULTI- PURPOSE PATHS OR SIDEWALKS CORNELIUS TO STUDY HWY 115 IMPROVEMENTS DUAL ROUTES THROUGH DAVIDSON ULI PARKWAY DESIGNATION PLAN PROCESS: 1. Develop Comprehensive Transportation Plan – 50-year plan / Parkway and East-West connections 2. Present to LNTC and Town Boards for input 3. Move to 25 year Long Range Transportation Plan 4. Move to 7-year Transportation Improvement Plan 5. Move to 5-year Work Plan 6. Plans will be presented and developed further with MUMPO and Lake Norman RPO ( Staffed by COG ) NEW ROUND ABOUTS EXISTING ROUND ABOUT

Cornelius RECOMMENDED PROJECTS New Construction Projects 1) Extend Zion Street north to Summerbrook Drive. 2) Extend Zion Street south from Autumn Care to Bailey Road. 3)Construct Smith Circle Connector. 4) Connect Feriba Place to Gem Street or connect Gem Street to Oak Street. Intersection Improvements Oak Street - improve geometry add crosswalks. Main St. (NC115) – add crosswalks, pedestrian enhancements and landscaping

HUNTERSVILLE FUTURE 4 LANES

DAVIDSON New Construction Projects Potts-Sloan Connection Potts-Eden Connection New Street Parallel Hillside to Cathey Connection Hillside to Woodland Connection Intersection Improvements Beaty/NC 115 (signal/roundabout) Armor/Beaty – pedestrian crossing Delburg/Beaty- pedestrian crossing Beaty/Griffith – roundabout Potts/NC 115 (in Cornelius) – signal/roundabout Jackson/Griffith – controlled intersection Jackson/NC 115 – Add left turn lane NC 115/Concord – Add left turn lane NC 115/Griffith – Pedestrian improvements Road Improvements Widen Potts, sidewalks Stripe bike lanes Sloan, Jetton Add sidewalks to Jetton, Sloan Add median, bike lanes, and sidewalks to Beaty