1 Project technical approach: Awareness and Preparedness for Emergencies at Local Level (APELL) Taller regional sobre las experiencias en la implementación.

Slides:



Advertisements
Similar presentations
Role of WMO in Natural Disaster Risk Reduction Ivan Obrusník, Czech Hydrometeorological Institute Role of WMO in Natural Disaster Risk Reduction Ivan Obrusník,
Advertisements

UNV is administered by the UN Development Programme Volunteerism and Disaster Risk Reduction & Management Oliver Wittershagen Portfolio Manager East Asia.
Global Platform for Disaster Risk Reduction, June 2009, Geneva Special event: Accessing space-based information to support disaster risk reduction,
17 June 2009 Page 1School Disaster Safety - Sri Lanka School Disaster Safety in Sri Lanka.
Existing tools for cooperation – WG 2 1 Regional Policy Dialogue Capacity building seminars WORKING GROUP MEETINGS HIGH LEVEL SEMINAR SERIES 4 working.
Museum Presentation Intermuseum Conservation Association.
1 Disaster Risk Reduction as means of Climate Change Adaptation -The Africa Strategy for Disaster Risk Reduction -The Hyogo Framework for Action
Armand Racine Consultant Chemicals Branch
World Bank and SPS With special emphasis on the recently established multi-donor Standards and Trade Facility Cees de Haan Agriculture and Rural Department,
World Meteorological Organization Working together in weather, climate and water Systematic Development of Multi-Hazard Early Warning Systems Maryam Golnaraghi,
Resource Mobilization Capacity Building OEWG – SIDE EVENT 7 April, 2006.
EuropeAid Co-operation Office Institutional Capacity Development Operations for the ACP Countries Unit AIDCO C4 Centralised Operations for the ACP Countries.
A hazard in itself is not a disaster.. It has the potential to become one when it happens to populations who have certain vulnerabilities and insufficient.
UN-HABITAT Best Practices Seville Centre for city-to-city co-operation in support of the Millennium Development Goals.
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
HISTORY. History of Emergency Management Within the DOE System The early years In the 1970s, DOE’s focus was on security and energy contingency planning.
PRIVATE SECTOR PREPAREDNESS Timothy R Gablehouse President
NATIONAL CAPACITY BUILDING FORTHE DEVELOPMENT OF A NATIONAL IMPLEMENTATION STRATEGY FOR THE GLOBALLY HARMONISED SYSTEM OF CLASSIFICATION AND LABELLING.
Making Aarhus work in international forums A workshop on promoting the application of the principles of the Aarhus Convention in international forums Geneva,
AGEE/APELL Consultative Meetings May 2003 Geneva Fritz Balkau UNEP, Division of Technology, Industry and Economics - Paris AWARENESS AND PREPAREDNESS.
11 th International Symposium Loss Prevention and Process Safety Promotion in the Process Industries 1 OECD Workshop on Sharing Experience in the Training.
Community Development Toolkit: ICMM and the World Bank Extractive Industries and Sustainable Development International Workshop Arequipa, Peru, October.
UNEP APELL Programme Results of project activities in Cajamarca and APELL promotion in the Mining Sector Other related UNEP initiatives Tomas Marques
Intergovernmental Network on Atmospheric Pollution Objectives of the Intergovernmental Network on Atmospheric Pollution: –Promote the exchange of research.
1 CHCOHS312A Follow safety procedures for direct care work.
National profiles on OSH – Methodology
NATIONAL SAICM IMPLEMENTATION: DEVELOPING A GOVERNANCE FRAMEWORK Gillian Guthrie Ministry of Local Government and Environment June 19, 2006 THE CASE OF.
Felix Omunu Disaster Risk Reduction Officer, Oxfam GB
23 rd September 2008 HFA Progress Report Disaster Risk Reduction in South Asia P.G.Dhar Chakrabarti Director SAARC Disaster Management Centre New Delhi.
European Federation of Geologists Christian Boissavy, member of EFG Expert Panel on Geothermal Energy, France Herald Ligtenberg, EFG EU Delegate, the Netherlands.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
Design and Development of an Inventory of Chemical Substances in Mexico General Bureau of Urban and Regional Pollution Research Bureau of Chemicals and.
Key Elements of Legislation For Disaster Risk Reduction Second Meeting of Asian Advisory Group of Parliamentarians for DRR 5-7 February, 2014, Vientiane,
UNEP DIVISION OF TECHNOLOGY, INDUSTRY AND ECONOMICS Water Footprint, Neutrality & Efficiency (WaFNE) Project in support of CEO Water Mandate Cornis van.
Coordination and Net Working on DRR Rapid Emergency Assessment and Coordination Team (REACT) Bishkek November, 2009.
ECENA Exchange Programme First Plenary Meeting January, 2006 Zagreb, Croatia Update on strengthening the implementation and enforcement of EU environmental.
UNEP’s portfolio on Safer Production Ruth Coutto Programme Officer, Sustainable Consumption and Production Branch Meeting between UNEP and MEP, 4 November.
InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory.
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
United Nations Environment Programme Regional Cooperation and Coordination Experiences Marieta Sakalian Programme Management/Liaison Officer Biodiversity.
Environmental Management System Definitions
SEVESO II transposition and implementation – possible approaches and lessons learned from MS/NMS SEVESO II transposition and implementation – possible.
Session V: Integration of Risk Information and Early Warnings in Emergency, Preparedness, Planning and Response Symposium on Multi-Hazard Early Warning.
Risk and Crisis Management Building OECD Principles on Country Crisis Management.
9th EIONET Workshop on Climate Change Impacts, Vulnerability and Adaptation James Creswick, Technical Officer Climate change, green health services and.
UNEP APELL Programme Tomas Marques Associate Programme Officer, Safer Production and APELL Sustainable Consumption and Production Branch / Business and.
International Recovery Forum 2014 ~ The Role of Private Sector in Disaster Recovery ~ 21 January 2014 Kobe, Japan Dr Janet L. Asherson THE LINK BETWEEN.
WHY DRR Minimizing impacts of disasters in health sector Maximizing readiness to respond 1$ vs 7 $
Health Emergency Risk Management Pir Mohammad Paya MD, MPH,DCBHD Senior Technical Specialist Public Health in Emergencies Asian Disaster Preparedness Center.
Working Group on the Value and Benefits Chair´s Report 7th Meeting of the Steering Committee of the INTOSAI Committee on the Knowledge Sharing and Knowledge.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
Sustainable Cities through Environmental Compliance and Enforcement Kenneth Markowitz 19 October 2015.
The Male’ Declaration Proposal for Phase III. Looking back to think ahead Policy Dialogue Background Materials Ministerial agreement Capacity building.
Module 1: Safe Hospitals Concepts Training on Safe Hospitals in Disasters.
S3.1 session day 3 1 training delivered by Oxfam GB, RedR India and Humanitarian Benchmark; January 2012, Yangon, Myanmar approved by the Advisory.
IADB REGIONAL POLICY DIALOGUE June 25-26, Presented by : Ronald Jackson, Director General, ODPEM, Jamaica.
 ROAD SAFETY: the European Union Policy European Commission, Directorate General for Mobility & Transport «Road Safety.
Nancy J. Leppink Chief LABADMIN/OSH Occupational Safety and Health and the Prevention of Occupational Accidents and Diseases Study Visit for the delegation.
Capacity-building from the perspective of the ECE Industrial Accidents Convention Virginia Fusé, UNECE secretariatIspra26/03/2015.
1 Office of ASG/CITO Crisis Information Management Strategy UNGIWG-11, Geneva 15 March 2011 A written consent by the UN is required to use the information.
INTOSAI WGEA Secretariat 8 th KSC Meeting Mexico City, September 7, 2016 Progress Report INTOSAI Working Group on Environmental Auditing.
Sendai Framework for Disaster Risk Reduction
Institutional Strengthening Support
Professor Virginia Murray, Public Health England
GEF governance reforms to enhance effectiveness and civil society engagement Faizal Parish GEC, Central Focal Point , GEF NGO Network GEF-NGO Consultation.
AAEA Role in Improving EPR Coordination Interventions among Arab Countries Abdelmajid Mahjoub Arab Atomic Energy Agency
EuropeAid Co-operation Office
NATIONAL POLICY FOR DISASTER PREPAREDNESS AND MANAGEMENT. UGANDA
CHEMICAL ACCIDENTS Programme
DIRECT – DIsaster REsilient Communities and Towns
Presentation transcript:

1 Project technical approach: Awareness and Preparedness for Emergencies at Local Level (APELL) Taller regional sobre las experiencias en la implementación de la metodología APELL en América Latina y la promoción de la nueva Iniciativa de Marco Flexible 29 de noviembre de 2010 – Buenos Aires, Argentina Tomas Marques United Nations Environment Programme

2 Contents 1. UNEP APELL Programme 2. APELL Process: goals and objectives 3. The 10 steps of the APELL Process 4. APELL in practice: actions and roles 5. Main benefits of implementing the APELL Process 6. APELL worldwide and sectoral applications

3 Industrial accidents and disasters affect everyone

4 Pesticide Plant Accident: Bhopal Accident at a pesticide plant in Bhopal (India) in 1984, which resulted in the death of at least 3000 people, and in 200,000 to 600,000 people getting injured as a result of this accident

5 Explosion in LPG terminal in Mexico City A major fire and a series of catastrophic explosions occurred in 1984 at a LPG Terminal Some 650 individuals were killed, more than 6,000 were injured, and the terminal was destroyed

6 Explosion of fireworks factory in Enschede A fireworks factory in Enschede (Netherlands) exploded in 2000, killing at least 20 people and injuring 562. Over 2000 members of the community, all of whom had been unaware of the existence of the factory, had to be evacuated, and hundreds of homes were destroyed

7 Explosion in Fertilizer Factory: the Toulouse Accident September people died >3,000 people injured

Offsite impacts of industrial accidents Industrial accidents affect the public as well as workers Industrial accidents can have severe impacts n community health and livelihoods. These can be caused by: –toxic gas –water pollution –physical harm –fires/explosions –crushing during mass panic –hazards during clean-up

UNEP APELL Programme APELL stand for Awareness and Preparedness for Emergencies at Local Level Launched by UNEP in 1986 in the aftermath of accidents like Bhopal, India As a Programme, APELL depends on a higher level framework of: –national emergency strategy and administration; –‘right to know’ legislation and transparency; –culture and practice of community involvement; –interagency cooperation

10 The APELL Process As a process, APELL is…: –“…a multi-stakeholder dialogue tool that establishes adequate coordination and communication in situations where the public might be affected by accidents and disasters.” Key aspects of the APELL process are: “local level”, “multi-stakeholder”, “cooperation” and “open communication” Main stakeholder groups: local authorities, industry, and community

11 The APELL Process APELL Process Integrated Emergency Preparedness and Plans Community Local authorities Industry APELL Co-ordinating Group

12 Goals and Objectives of the APELL process The main goal of the APELL Process is the development of integrated emergency response plans through a multi-stakeholder participatory approach involving industry, the communities and local authorities The main objectives of the process are to protect lives and the environment, by reducing the occurrence and the potential impacts of industrial accidents/disasters. This is achieved by: –Promoting better preparedness at the local level –Raising awareness of potentially affected communities structured 10-step process –Working through a structured 10-step process (multi-stakeholder dialogue)

IDENTIFY PARTICIPANTS AND DEFINE THEIR ROLES EVALUATE AND REDUCE RISKS REVIEW EXISTING PLANS AND IDENTIFY WEAKNESSES TASK IDENTIFICATION MATCH TASKS AND RESOURCES INTEGRATE INDIVIDUAL PLANS INTO OVERALL PLAN AND REACH AGREEMENT INTEGRATE INDIVIDUAL PLANS INTO OVERALL PLAN AND REACH AGREEMENT DRAFT FINAL PLAN AND OBTAIN ENDORSEMENT COMMUNICATION AND TRAINING COMMUNITY EDUCATION TESTING, REVIEWING AND UPDATING TESTING, REVIEWING AND UPDATING APELL 10-STEP PROCESS

14 APELL in practice Promote the coordination between representatives from local authorities, the industry and the public Prepare an integrated emergency response plan and test the plan regularly through emergency drills Inform the community about the risks they are exposed to Educate the community about the emergency plan and on how to react to industrial accidents Industrial area Community exposed to risks

15  Raise public awareness, mobilise public support The role of Local Authorities  Co-ordinate emergency service and public group participation  Train emergency responders  Acquire and provide/mobilise resources  Approve the emergency response plan developed in the APELL process, implement and communicate it to the public

16  Initiate measures for risk reduction, organise “on site“ preparedness  Provide expertise for risk identification, risk assessment and risk reduction measures  Promote risk communication  Establish close working relationships with local authorities, in particular with emergency response agencies and neighbouring industrial facilities The role of Industry

Enhanced local knowledge of industrial hazards and risks Informed community about the risks they are exposed to Educated community on how to react to industrial accidents and to instructions from local authorities in the case of an accident Increased co-ordination between local authorities, emergency repsondese agencies, industry, and the public Integrated emergency response plans Main benefits of implementing the APELL process

18 APELL Worldwide Capacity Building in more than 30 Countries –India, Russia, Baltics, Czech Republic, Thailand, China, France, Qatar, Tunisia, Peru, Brazil, Argentina, Colombia, Equator, Venezuela, Chile, Morocco, etc. Industrial Parks/Zones: Argentina, Brazil, China, Colombia, Egypt, France, Morocco, Sri Lanka

19 APELL in different sectors APELL for Chemical/ Industrial Accidents TransAPELL APELL for Port Areas APELL for Mining New training kit on APELL for multi-hazards

20 Thank you for your attention!

21 Contacts Tomas Marques Associate Programme Officer Safer production and Awareness and Preparedness for Emergencies at Local Level (APELL) United Nations Environment Programme - UNEP Division of Technology, Industry and Economics - DTIE 15, rue de Milan Paris Cedex 09, France +33 (0) (0) (fax)