New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.

Slides:



Advertisements
Similar presentations
Persian - Passive Cooling Systems Early designs provided a non-mechanical system for cooling the entire structure via natural convection.
Advertisements

Federal Reserve Bank of Boston Case Study
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
eQuest Quick Energy Simulation Tool
“Do not take anyone’s advice as to how this building should be assembled.”
1. 2 CASE STUDY NEW CONSTRUCTION PUBLIC SECTOR Case study by SEDAC What they got… ▪Prescriptive Incentive for individual measures. ▪They did not model.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Overview of Collected Integrated Chiller Retrofit Case Studies Dr. Lisa Gartland (510) ,
Sustainability in Waupun Continuing the goal of 25% renewable energy by 2025 Renee Henning 2012 Wisconsin Sustainability Intern Program.
Denver Place North & South Towers Case Study Matt Urquhart Amerimar Realty Management Company Jack Wolpert E-Cube, Incorporated.
Worcester Polytechnic Institute Gordon Library and Fuller Laboratory B.N. Tripathi Senior Vice President CES/Way.
WAL-MART STORES, INC. DEMAND RESPONSE. Wal-Mart in New York Supercenters45 Discount Stores45 Neighborhood Markets 0 Sam’s Clubs17 Distribution Centers4.
An Affordable Energy Efficient Home Utilizing Solar and Wind Power and Solar Hot Water John Gardner, PE.
ENERGY EFFICIENCY FOR END USERS With a Case Study of Energy Progress at Rowan University AJL RESOURCES LLC – CLEAN ENERGY SYMPOSIUM.
Franklin County Technical School Performance Contract Project.
Green Building Design Scott Lowe Professor Civil and Environmental Engineering Department Manhattan College.
Integrated Retrofits for Federal Projects Dr. Lisa Gartland.
Engert, Scheriau, Wimmer SS 2010 Energy and sustainable development, Prof. Schleicher.
G. H. Schettler House Case Study © Robert. A. Young All rights reserved.
Department of Energy Energy Savers PowerPoint: Water Heating 5 of 12.
Morofsky1 Low-energy Building Design, Economics and the Role of Energy Storage Canadian possibilities based on the Model National Energy Code for Buildings.
The Role of Tenant and Property Operations in Implementing Sustainable Practices Public Building Services October. 17, 2007 Om Taneja PBS Tenant and Property.
Presentation Outline Introduction CHP Analysis Electrical Analysis Acoustical Analysis Thermal Storage Analysis System Optimization Analysis Conclusion.
Solar Energy Technology for Commercial Facilities John Archibald American Solar, Inc. Association of Energy Engineers Baltimore Chapter.
BECOMING GREEN Santa Margarita High School Academic Building.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
Oklahoma City Community College Strategic Planning Approach Cuts Cost….Improves the Learning Environment Smart and Sustainable Campuses Conference Monday,
Utility Rebates Services and Funding to Help Build “Green” Restaurants and Hospitality Facilities Tom Coughlin Program Manager.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
1 Connecticut’s New Energy Code Connecticut ASHRAE Tech Session October 13, 2011 Frederick F. Wajcs, Jr. Senior Energy Engineer Connecticut Light and Power.
Greening Affordable Housing on a Budget or Where There's a Will, There's a Way.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Dave Brake, Darren Adams, Sean Tobin Charmaine Dean, Jessie MacDonald.
Brought to you by: Connecticut Energy Code Frederick F. Wajcs Senior Energy Engineer Northeast Utilities February 10, 2011.
Massachusetts High-Performance Green Schools – Case Study Whitman-Hanson Regional High School Library & Media Center. This projects features include utilizing.
Who Says Energy Efficiency Can’t be Sexy? About Us Energy + Environment  Since 1999  Decades of experience in energy efficiency  We create jobs, lower.
River Avenue Pittsburgh, Pennsylvania Michael J. Carroll Mechanical Option Primary Advisor: Dr. Bahnfleth H.J. Heinz Distribution Center.
Great Lakes Capital Fund. AGENDA Fun Stuff Energy Efficiency Case Studies Energy Conservation – Is it Free? Attendee Participation Funding Sources.
Green Building Demonstration Project Adam Saling City of San Diego.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Building Simulation. BMEABMEA uilding odeling nergy nalysis.
RAFAEL PEREZ, REGIONAL MANAGER CLEAN ENERGY GREEN CORRIDOR.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Best Practices in Overall Sustainable Design Cal State University, Long Beach - Liberal Arts 2, 3 and 4 Renovation Presented By:Mark Zakhour,, CASp, LEED.
Introduction to Integrated Chiller Retrofits Dr. Lisa Gartland (510) ,
Name of Building(s) or Project Speaker(s) Organization(s)
Marriott Corporate Headquarters
HVACR416 - Design Heat Loss / Heat Gain Part 1. Why? The primary function of Air Conditioning is to maintain conditions that are… o Conductive to human.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
CTRA Green Features. 1. Green Roof 2. Hot Water Solar Heaters These are a type of solar panel. It is called evacuated tube collectors and they heat our.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Energy Conservation Building Upgrades Alma School District.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
Overview and Update E7A Renewal Project. Exterior View E7A Renewal and Atrium Link to E7B.
How Our Earth Sheltered Homes are Constructed Earthlog ® Equity Group, Inc. The American Dream … The Future is Now
ENERGY SYSTEMS LABORATORY ABOVE CODE ENERGY ENHANCEMENT PROJECT for The City of Arlington ENERGY SYSTEMS LABORATORY Texas Engineering Experiment Station.
Energy Efficiency and Customer Research and Development
An Affordable Energy Efficient Home Utilizing Solar and Wind Power and Solar Hot Water
Welcome to the Colorado Restaurant Association Pikes Peak Chapter Energy Efficiency in the Restaurant Industry.
Lehigh Valley Heritage Center
Exploring Energy Management
Community Practice Asset Management.
Presentation transcript:

New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown

New York Life Building Built in 1888 Italian Renaissance structure with steel framing 10 Story, 200,000 sq. ft. Class A Office Space 500 employees H-shaped footprint Now Utilicorp United’s headquarters

New York Life Building Project Scenario Building idle for 5 years Severe water damage led to : –Plaster falling –Wood floors buckling –Roof leaking –Structure inhabited by nothing more than pigeons

New York Life Building Project Challenges Aim for a 7-year payback period Operate the building at 1/3 less cost than any Class A building in Kansas City Preserve the atrium’s barrel-vaulted skylight and historical character Lessen energy demands at peak times Accomodate tighter conditions in the air- distribution system

New York Life Building Other Project Challenges Upgrade to meet current building codes –emergency exits –seismic stability –thermal exposure Add state-of-the-art mechanical and electrical systems to 100 year old building

New York Life Building System Solutions Electric centrifugal chillers with ice-storage capabilities Variable air volume (VAV) air distribution system New operable energy-efficient windows Added insulation to building envelope New heating and hot water systems 10-story infill of H footprint Energy-efficient lighting and daylighting

New York Life Building New Cooling Plant Electric centrifugal chillers –Two 300 ton Trane machines, R-123 –daytime chiller full-load 0.55 kW/ton efficiency, kW/ton efficiency at 75% load –ice storage chiller kW/ton efficiency Ice-storage system –“Giant Slurpie Machine” or “Popsicle Machine” –fourteen 15-foot tall, 1600 gallon insulated tanks –glycol solution cooled to 22 °F at night –ice cools interior air during the day

New York Life Building Heating and Hot Water High-efficiency gas-fired boilers –hot water heat to VAV boxes Point-of-use hot water heaters –eliminated need for insulated piping and boiler maintenance –sensor-activated fixtures with preset wash times

New York Life Building Lighting Improvements Overhead lighting –T8 Fluorescent tubes –solid-state, low-energy, dimmable ballasts Computer-controlled system –adjust overhead light levels according to the amount of daylight –occupancy sensors turn off lights when no one is present Daylighting –ceilings slope down from windows to reflect light into interior –interior light shelves –light reflective colors

New York Life Building Other Building Load Reductions New energy-efficient windows installed –double-pane, low-e, insulated frames –custom-made operable windows to meet historical restoration requirements Exterior masonry walls –R-11 fiberglass insulation added New roof with R-20 insulation

New York Life Building Ten-Story Infill Filled in part of the H-shaped footprint with full height addition –9,000 square feet of office space added –new light well protects the original skylight Reduced building surface area by 15% Steel frame increases structural support Skylight designed to evacuate smoke in an emergency

New York Life Building Integrated Economics All building energy systems were designed to reduce peak electrical demands New chillers & ice storage –purchase & installation cost of $810,000 –payback period of 10.2 years Lighting system payback period of 3-4 years All other building systems have 5-7 year paybacks Lower payback measures –help to finance expensive chiller/ice storage work –help reduce overall project payback period

New York Life Building Financing Structure $35 million project, including $7 million for adjacent parking structure Missouri Tax Incentive Program - used to finance 75% of the renovation Credit of 100% of property tax increases and up to 50% of sales and profits tax increases

New York Life Building Project Timeline Building purchased in November 1992 Extensive redesign of interior and exterior to Class-A office space Complete mechanical/electrical overhaul Construction began in October 1995 Project complete in beginning of 1997

New York Life Building Project Results Highly efficient, state-of-the-art HVAC systems –Utilicorp United is saving $1.4 million a year on utility bills from its previous headquarters –utility cost savings of $ /square foot –operating costs reduced from $23 to $15/square foot –overall project payback of ~7 years Created an extremely comfortable, modern office building, while retaining the character of the original historic building