Episode 3 / CAATS II joint dissemination event Lessons Learnt Episode 3 - CAATS II Final Dissemination Event Philippe Leplae EUROCONTROL Episode 3 Brussels,

Slides:



Advertisements
Similar presentations
ERA-LEARN Supporting the ERA-NET Learning Platform by creating a toolbox for the ERA-NET community Roland Brandenburg, FFG.
Advertisements

1 CARE-ASAS Action Plan Francis Casaux CARE-ASAS Action Manager on behalf of EUROCONTROL.
The EUROCONTROL Validation Planning Process
Expert Groups in Episode 3 Episode 3 - CAATS II Final Dissemination Event Raquel Garcia Isdefe Episode 3 Brussels, 13 & 14 Oct 2009.
Enterprise Grants Management The Time is Right. Transformation From To.
Episode 3 / CAATS II joint dissemination event Gaming Techniques Episode 3 - CAATS II Final Dissemination Event Patricia López Aena Episode 3 Brussels,
The Performance Framework Episode 3 - CAATS II Final Dissemination Event Laurent Tabernier EUROCONTROL Project Episode 3 Brussels, 13 & 14 Oct 2009.
New market instruments for RES-E to meet the 20/20/20 targets Sophie Dourlens-Quaranta, Technofi (Market4RES WP4 leader) Market4RES public kick-off Brussels,
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Episode 3 E3-WP3-MWPM PPT-V0001-EXCOM5 1 Episode 3 EXCOM # 5 15th December 2009.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
Introduction Episode 3 - CAATS II Final Dissemination Event Martijn Koolloos Isdefe Episode 3 & CAATS II Brussels, 13 & 14 Oct 2009.
Safety case development in ATM R&D Safety feedback for decision-makers and concept developers Episode 3 - CAATS II Final Dissemination Event Jelmer J.
Episode 3 Prototyping Sessions En-route and TMA Episode 3 - CAATS II Final Dissemination Event Bill Booth EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Episode 3 / CAATS II joint dissemination event Combining Techniques: Expert Groups, Gaming and Modelling Pablo Sánchez-Escalonilla AENA Episode 3 Brussels,
Episode 3 / CAATS II joint dissemination event Combining Techniques: Expert Groups, Fast-Time Simulation and Prototyping Episode 3 - CAATS II Final Dissemination.
Fundamentals of Information Systems, Second Edition
IS&T Project Management: Project Management 101 June, 2006.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
The URBACT II Programme General Presentation Vilnius, 20 January 2011.
Annual SERC Research Review - Student Presentation, October 5-6, Extending Model Based System Engineering to Utilize 3D Virtual Environments Peter.
BUSINESS CASE Episode 3 - CAATS II Final Dissemination Event Ignacio Zozaya Boeing Research & Technology Europe CAATS II Brussels, 13 & 14 Oct 2009.
This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF. Work Package 4 & Methodology for Open Living Lab O4.1.7 Budapest,
SESAR Single European Sky Air traffic management Research
Episode 3 / CAATS II joint dissemination event Michael Standar Chief, Operational Concept and Validation.
David Bowen Head of ATM Operations and Systems
Introduction to Interactive Media The Interactive Media Development Process.
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 1 Scene setting for Episode 3 Philippe Leplae EUROCONTROL Episode 3.
Scene setting for CAATS II Episode 3 - CAATS II Final Dissemination Event Carlos Regidor Isdefe CAATS II Brussels, 13 & 14 Oct 2009.
INTERNATIONAL LABOUR ORGANIZATION Conditions of Work and Employment Programme (TRAVAIL) 2012 Module 13: Assessing Maternity Protection in practice Maternity.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
Overview Day 1 Episode 3 - CAATS II Final Dissemination Event Martijn Koolloos Isdefe Episode 3 & CAATS II Brussels, 13 & 14 Oct 2009.
Episode 3 EP3 WP6 - Excom - December 15th, Brussels 1 WP6 - Technology EP3 Final Report Technology results December 2009.
European Operational Concept Validation Methodology E-OCVM Version 3: What’s New Episode 3 - CAATS II Final Dissemination Event Matthias Poppe DFS Episode.
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.
The implementation programme for the 2008 SNA and supporting statistics UNECE special session on National Accounts for economies in transition Geneva,
Episode 3 E3-WP0-MWPM PPT-V th ExCom Slides 1 Episode 3 - Ex-Com Final Report Tools & Validation Dr. Ralph Leemüller R&D Division - DFS.
Results of the midterm evaluation exercise on the Leader + programme for Portugal Special focus on evaluating innovation Pedro Afonso Fernandes (CIDEC.
INNOLABS W ORK P ACKAGES Grant. No LV01-KA
Financing Natura 2000 WORKSHOPS 2nd meeting of the Steering Group, 2 March 2006.
Joint wrap-up of event Episode 3 - CAATS II Final Dissemination Event Martijn Koolloos Isdefe Episode 3 & CAATS II Brussels, 13 & 14 Oct 2009.
Episode 3 1 Final Report Performance Aspects Ex-Com #6 - Brussels, December 15th 2009
II Course on GBIF Node Management Arusha, Tanzania 31 st October and 1 st November 2008 GBIF Training Materials and Future Plans Alberto GONZÁLEZ-TALAVÁN.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
Feedback from Interoperability Workshop: Graham Worsley and David Calder TSA Conference 15 November 2011.
The benefits of providing an effective programme and project support function Whied Latif Andrew Platt.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
Slide 1 PDT Europe 2014, October 2014, Paris 1 AeroSpace and Defence Industries Association of Europe Through Life Cycle Interoperability as developed.
2050AP Project WP5: “Conclusions” UPM Madrid 11 de Octubre 2013.
Statistical process model Workshop in Ukraine October 2015 Karin Blix Quality coordinator
From Development Phase to Implementation
The ESS vision, ESSnets and SDMX
Identify the Risk of Not Doing BA
What is a Learning Collaborative?
The Transportation Information Gateway An Open Source Web Platform for Collaboration in the Planning Process AMPO 2017 Annual Meeting Brian ten Siethoff,
ITSM Governance is Imperative to Succeed
Common Standard Operational Procedures for the Union Civil Protection Mechanism Modules and Teams (UCPM SOPs) – UCPM SOPs – UCPM-2017-PP-AG This.
Support for the AASHTO Committee on Planning (COP) and its Subcommittees in Responding to the AASHTO Strategic Plan Prepared for NCHRP 8-36, TASK 138.
Conduction of a simulation considering cascading effects
CBP Biennial Strategy Review System
CRUE – The Way Forward Vicki Jackson
RECARE set-up Rudi Hessel on behalf of coordination team
LOSD Publication Deirdre Lee
Cluster Knowledge Integration and Dissemination
Soren Dissing - EUROCONTROL
Projects under Pillar I of White Paper on Climate Change Adaptation
Bridging the ITSM Information Gap
Presentation transcript:

Episode 3 / CAATS II joint dissemination event Lessons Learnt Episode 3 - CAATS II Final Dissemination Event Philippe Leplae EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009

Episode 3 - CAATS II Final Dissemination Event 2 Content Project objectives Lessons learnt method Lessons learnt in:  management  validation  concept clarification  result integration  validation techniques Conclusion

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 3 Project objectives Provide detail on key concept elements in SESAR Initial operability and performance assessment Initial technical impact assessment Analysis of available tools for SESAR validation Report on validation methodology …… Hence specific emphasis on lessons learnt

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 4 Lessons learnt method 2 workshops, Madrid and Brétigny 9 different sessions on 5 main topics involving more than 30 participants  Validation strategy and project DOW  Project management  Concept clarification  Integration and Consolidation  EP3 validation techniques and levels of maturity Most project members also working in SESAR Strong desire to provide feedback to SESAR

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 5 High level lessons learnt System view should drive validation activities  Need to adapt DOW and management to required flexibility  Need time to develop system driven project  We have developed artefacts to drive it Many different techniques tried on Episode 3  Suited to low maturity level concept elements  Guidelines on when and how to use it are produced Importance of support tools  Good strategy useless without tools to support it  Tools also require investment in training  This provides harmonized working methods, key to make distributed project work

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 6 Lessons learnt in management Our challenges:  Wide range of disseminated partners  Crossed responsibilities and thinly spread effort  Innovative tasks  High quality requirements  Tight deadlines Our answers:  Development of tools for distributed work  Training on the tools, and specific delivery process  A lot of co-ordination activities Follow-up actions:  Build more flexibility in the programme (DOW and contract)

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 7 Lessons learnt in validation Our challenges:  Maturity lower than expected at programme onset  E-OCVM V2 not well adapted to concept wide validation  Lack of E-OCVM expertise inside team  Wide range of results Our answers:  We built a framework with guidelines, principles, templates.  Developed assumptions management  Performance framework and DOD’s provided at start  Guidance provided through system WP and co-ordination cell  Thorough review of experimental plans Open issue:  Maturity assessment at start of each validation activity

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 8 Lessons learnt in concept clarification Our challenges:  Multiple sources from SESAR (CONOPS, OI’s,etc…)  Lack of details for validation  Multiple sources to update DOD’s Our solutions:  Propose a structure, around process model and DOD’s  Develop different modes of descriptions - DOD’s - Operational scenarios - Story boards  Develop collaborative working methods to update documents Follow-up:  Establish a recognised authority to select among options  Use hot topics to drive validation

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 9 Lessons learnt in result integration Our challenges:  Exercises not providing consistent results  Different granularity of results  Various degree of validity of quantitative data Our solutions:  Influence diagrams help understanding benefit mechanism and identify where performance is improved  Influence model has been developed ready to be fed with results  Management of assumptions to interpret results For subsequent coverage:  Steer validation activities from the performance framework  Use of models developed in EP3 to provide more quantitative data to performance model

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 10 Lessons learnt in validation techniques Successful used of different techniques  Prototyping  Macro-modelling  Various sorts or gaming  Expert groups Work packages integrated different techniques  Combine results of very different nature  Various sequences of activities tried  Expert groups key to success Benefits of industry assessment:  “Reality check”  Should run as a complementary process to operational validation

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 11 Validation techniques: Expert Groups Lessons learnt  Useful at all maturity levels  Need good facilitation techniques by somebody with OPS expertise  Need current operation experts + concept experts  Storyboards good method to structure EG debates Our input to SESAR  Storyboards technique  Various facilitation techniques  Hot topics  Guidelines document

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 12 Validation techniques: Gaming Lessons learnt  To be associated with Expert Groups and modelling  Suited to clarify roles and responsibilities for all maturity levels  More flexible than prototyping as not in real time (interruptions feasible)  Progression from paper-based gaming to platform gaming Our input to SESAR  Different platforms - CHILL - DARTIS - ACCES platform  Paper based gaming and associated web based tool  Guidelines document

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 13 Validation techniques: Prototyping Lessons learnt:  Not a cheap RTS!  Allowed to fail  Concept clarification-no quantitative data  Successive runs with same team of OPS staff Our input to SESAR  First results on: - PRNAV, CDA in descent phase. - Acceptability of 4D trajectory to controllers  Guidelines document

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 14 Validation techniques: Modelling Lessons learnt:  Use of process modelling and network modelling  Process modelling complement gaming  Need to work on precise concept elements  Macro-modelling Our input to SESAR:  3 innovative tools developed in EP3 - One abandoned (unsatisfactory results) - One providing results when applied to mature concept elements - One promising for network wide assessments  Guidelines document

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 15 Conclusion Episode 3 is the first ATM-wide concept validation programme We had to develop tools and methods adapted to this new challenge Another 2 months to complete our work (WP and final report) We provide to SESAR:  New tools  New methods  An integrated approach  First validation results…  See And our most precious output:  A team with the expertise and concrete experience already working on the SESAR projects:

Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 16

Thank you