Ladd Arboretum Multiuse Trail Council Presentation Monday, March 10, 2014 Suzette Robinson, Director of Public Works Homayoon Pirooz, P.E., Assistant Director.

Slides:



Advertisements
Similar presentations
Highway 19 Mill & Overlay Project. Better Roads for Minnesota.
Advertisements

Project Background and Objectives
Department of Public Works Bureau of Street Services Valerie Lynne Shaw President Department of Public Works.
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014.
Non Powell Bill Street Repair & Maintenance Strategies October 8, 2012.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
December 6, 2012 Public Meeting. AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
ANNUAL REPORT MANY CULTURES, ONE BRIGHT FUTURE! Board of County Commissioners August 19, 2014.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Air Estates/Bald Eagle Estates) Improvement Project December 13, 2010.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Transportation Enhancements Application Workshop Welcome!! October 3 & 4, 2012.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Community Development Department Construction Phase.
Metro South Planning MetroLink in South St. Louis County Metro South MetroLink Extension Alternatives Analysis and Draft Environmental.
STA Safety Project PID #76439 December 12, 2006.
Community Development Block Grant (CDBG)Program December 17, 2014 Citizens Advisory Task Force Public Hearing.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.
PUBLIC INFORMATION MEETING Ridgewood Avenue Safety Improvement Project From North of Falcon Avenue / Riverside Drive to North of Lamont Street in Volusia.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Chapel Hill Parks and Recreation. “Networks of natural spaces which provide corridors connecting areas such as neighborhoods, parks, and schools.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
Transportation Master Plan Update Warden’s Forum May 7, 2015.
STRONG NEIGHBORHOOD INITIATIVE Public Works Department January 30, 2007 Agenda item 8.01.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Town Road Improvement Project Plan
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Boulder Junction Town Road Improvement Project
Project Status & Right-of-Way Acquisition
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Santa Cruz avenue sidewalks Project
1. Neighborhood Safety Program 2. ICS traffic and security 3
Stanford Avenue/El Camino Real Intersection Improvements Project
Street Improvement Plan
PROPOSED 34 BIKE SHARE STATION LOCATIONS FOR PHASE 2 OF THE LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (METRO) REGIONAL BIKE SHARE PROGRAM.
Public Information Meeting NW 100th Street Reconstruction Project
Wintergreen Neighborhood Park Meeting
Highway 169 Bridge Replacement & Pavement Resurfacing
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
Issaquah-Fall City Road
Participatory Road Program neighborhood meeting Donahoo 174th Street
Pryor Creek Trail - Phases 1A & 1B Pryor Creek, OK
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Construction Management & Engineering
Meadow Lake Boulevard Street Extension Project
NEIGHBOURHOOD TRAFFIC SCHEMES PRIORITIZATION METHOD
Now Accepting Proposals!
URBAN TRAIL PROJECT UPDATES
Walker Street Reconstruction Project 25% Design Public Hearing
Council Agenda Item #5 February 4, 2019
Monterey County Project Report for Measure X Expenditures
I Street Bridge Replacement Project
Presentation transcript:

Ladd Arboretum Multiuse Trail Council Presentation Monday, March 10, 2014 Suzette Robinson, Director of Public Works Homayoon Pirooz, P.E., Assistant Director of Public Works Stefanie Levine, RLA, Senior Project Manager 1

Ladd Arboretum Multiuse Trail Meeting Agenda Background Progress To Date Next Steps 2

Ladd Arboretum Multiuse Trail Background Arboretum construction completed in miles long (Emerson to Greenbay) 8’ wide, gravel 2007 master plan recommended reconstruction on same alignment 3

Ladd Arboretum Multiuse Trail Background Limited use during winter / inclement weather due to poor drainage Path surface material Poor connections at street intersections (Bridge / McCormick shown) Poor visibility from street for students between Bridge and Greenbay 4

Ladd Arboretum Multiuse Trail Progress To Date May 2012: City applied for Illinois Transportation Enhancement Program (ITEP) funding to reconstruct multiuse trail February 2013: City received approval for $580,000 through ITEP ($145,000 City share) Summer 2013: Preliminary data collection initiated October 8, 2013: Neighborhood meeting held regarding preliminary alignment, cross section and paving materials (approximately 11 participants) March 10, 2014: Council presentation 5

Ladd Arboretum Multiuse Trail Next Steps Complete Phase 1 (preliminary) engineering: Spring 2014 Complete Phase 2 (construction documents) Engineering: Fall 2014 Construction Letting: Spring 2015 (by IDOT) Construct Project: Summer

Ladd Arboretum Multiuse Trail Typical Cross Section 7

Ladd Arboretum Multiuse Trail EXISTING CONDITIONS PROPOSED CONDITIONS 8

Ladd Arboretum Multiuse Trail EXISTING CONDITIONS PROPOSED CONDITIONS 9

Ladd Arboretum Multiuse Trail EXISTING CONDITIONS PROPOSED CONDITIONS 10

Ladd Arboretum Multiuse Trail EXISTING CONDITIONS PROPOSED CONDITIONS 11

Ladd Arboretum Multiuse Trail EXISTING CONDITIONS PROPOSED CONDITIONS 12

Ladd Arboretum Multiuse Trail EXISTING CONDITIONS PROPOSED CONDITIONS POTENTIAL TREE RELOCATIONS 13

Ladd Arboretum Multiuse Trail EXISTING CONDITIONS PROPOSED CONDITIONS 14

Ladd Arboretum Multiuse Trail Paving Material Selection Criteria FeatureAsphalt * ConcreteCrushed Stone Permeable Asphalt Permeable Concrete Positive Attributes Low installation cost XX Low maintenance costs XX Can be plowed XXXX Good drainage control XX Less “developed” appearance XX Stable riding surface XXXX Negative Attributes High installation cost XXX Moderate maintenance costs XX High maintenance costs X Cannot be plowed X Creates drainage concerns XXX More “developed” appearance XXX Unstable riding surface X * Staff recommendation 15

Ladd Arboretum Multiuse Trail Comments / Questions? Suzette Robinson, Director of Public Works Homayoon Pirooz, P.E., Assistant Director of Public Works Stefanie Levine, RLA, Senior Project Manager 16