December 6, 2012 Public Meeting. AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to.

Similar presentations


Presentation on theme: "December 6, 2012 Public Meeting. AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to."— Presentation transcript:

1 December 6, 2012 Public Meeting

2 AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to the Indian Bend Wash  Project also includes:  Pedestrian Bridges  Neighborhood Connections  Landscaping  Lighting  Public Art

3 AZ Canal Multiuse Path  Enhance mobility for bicyclists and pedestrians throughout the region  Provide connectivity to Papago Park, the Phoenix Zoo, the Desert Botanical Gardens, Tempe Town Lake and the Indian Bend Wash path system  The cities of Tempe, Phoenix and Scottsdale have been working to complete a 17-mile regional pathway system  Once constructed, this project will complete Scottsdale’s portion of the 17-mile loop  Total Project Budget of approximately $4M

4  Project Team  Olsson Associates and Jody Pinto  Partnership between the City of Scottsdale, Salt River Project and Scottsdale Public Art  Includes Federally Funding  Congestion Mitigation and Air Quality Funds  Follow the Federal Process  Required Clearances  Min. 2 year Design Process AZ Canal Multiuse Path

5

6

7

8

9  Next Steps  Develop Master Plan and Artist concepts  Second Public Meeting – Winter 2013  Design Review Board – Winter/Spring 2013  Project Schedule  Complete design – Summer 2014  Start construction – Fall 2014 AZ Canal Multiuse Path