March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.

Slides:



Advertisements
Similar presentations
S.PopescuAlice DCS workshop, Colmar, OPCs latest news Iseg OPC server Wiener OPC server.
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
PVSS and JCOP Framework Organization, Support & News Oliver Holme IT-CO.
S.PopescuAlice DCS workshop, Colmar, Follow-up from the last DCS workshop Answers and recommendations.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
ALICE DCS Workshop - 15/3/2004 G. De Cataldo, A.Franco, A.Tauro - INFN Bari - 1 The SY1527 replay delay via the OPC and the ‘SY driver’ (By HMPID) The.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
A3016 and MAO test at CAEN Pigi, A. Boaino & CAEN.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Recall: u target devices & possible solutions u Outstanding actions.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
European Organization for Nuclear Research Geneva - Switzerland Ing. Robert van der Vlugt CERN/PH Alice Detector Control System PVSS2 General Purpose Interface.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
1 Low Voltage Power Supplies for ALICE ALICE week June 04 L.Jirden u Detector requirements u Target Devices u Procurement u Actions.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Wayne Salter, CERN The LHC Experiments’ Joint Controls Project Framework ALICE DCS Day 10 th September 2001.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
Status of NA62 straw electronics Webs Covers Services Readout.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
19/05/10FV 1 HyTec crate – DCS integration issues.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
ALICE DCS Workshop 9 October 2006 ALICE DCS Workshop 9 October 2006 Michele NITTI.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
CERN Summerschool 2007 Monitor and Control of the CANbus power supplies of ATLAS’ MDTs Wilco Koppert (UU)
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
ISEG Users meeting Mateusz Lechman 20/07/2010.
Common components for OPC-UA developments at CERN: An enhanced OPC-UA toolkit Ben Farnham.
Radiation- and Magnet field- Tolerant Power Supply System
TPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans

March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage Current hardware –Caen HV and LV  Caen OPC server –Wiener LV  Wiener OPC server –Iseg HV  Iseg OPC server

March 16, 2004Alice controls workshop, S.Popescu Caen OPC server Based on the TCP/IP protocol Current version is 2.7 released July 2003  W2k and WXP Can be downloaded from No new features added from version 2.4 –only bug fixing (memory leakage for BSTR type item) –Performances improved Tests with OPC clients connected locally or remotely to the OPC server proved good performances

March 16, 2004Alice controls workshop, S.Popescu Integration in Framework(JCOP) Caen is integrated in Framework, v2.05 –For the following devices: SY127: A230, A326, A327, A329, A333, A334, A335, A431, A432, A433, A434, SY403: A503, A504 SY527: A373A, A516, A732, A733, A734, A735, A753, A821, A832, A833, A834, A835 SY1527: A1511, A1517A, A1513A, A1519, A1529, A1526, A1734, A1821 PVSS OPC client number assigned in Framework is 6

March 16, 2004Alice controls workshop, S.Popescu

March 16, 2004Alice controls workshop, S.Popescu Wiener OPC server For previous tests Slic.OPCserver (IT-CO) was used Official release, version 1.6 for W2K and WXP Based on CanOpen protocol, Kvaser and NI Can cards supported Can be downloaded from WIENER/welcome.htmlhttp://itcofe.web.cern.ch/itcofe/Services/OPC/RecommendedTools/Servers/ WIENER/welcome.html BUT “According to WIENER, the use of such software with the WIENER low voltage power supplies ("PL500") in safe conditions would require modifications of the OPC server or of the PL500 firmware. Wiener does not currently have a release date for the OPC server for the PL500 and will not offer support for the use of the OPC server with PL500 before this new release is available. In the meantime, the OPC server shall be used with caution if it is connected to low voltage power supplies.” Installation steps: –Unzip OfficialOPC_1006_release.zip in a directory created by you –WienerOPC_Kvaser.exe –RegServer ( not WienerOPC as indicated by documentation) –WienerConfig.exe  creates Wiener_cfg.xml –PortID and CANbus Baud Rate should be the same as the ones configured manually on the crate

March 16, 2004Alice controls workshop, S.Popescu Integration Framework v2.05 The Wiener Framework component can be download from / / Wiener devices (VME crate, FanTray and PowerSupply) are integrated in Framework v2.05 PVSS OPC client assigned in Framework is 11 A show case set-up: –Wiener Framework, OPC official release, Kvaser PCI Can card, PL500 is working in (asap will be moved in DCS lab) Stable, no CPU load problem reported so far On going tests in hall 167, Point 2, didn’t show any problem so far Currently, at point 2, tests for the “water cooled cables” are using the following configuration: Wiener PL V 2 channels of 230 A connected to a PC, Kvaser PCI Can card, with PVSS WienerTest v2, control software (author S.P): no problems reported from the control side The same set-up will be used for the TPC sector test

March 16, 2004Alice controls workshop, S.Popescu

March 16, 2004Alice controls workshop, S.Popescu

March 16, 2004Alice controls workshop, S.Popescu

March 16, 2004Alice controls workshop, S.Popescu Iseg OPC server (1) For previous tests Slic.OPCserver (IT-CO) was used Present status: OPC official release is under development will be supported for W2K and WXP Based on the CanOpen protocol, Peak Can cards supported, maybe Kvaser Can cards in the near future Temporary solutions: for tests and developments I am using only v2.06, not the latest release 3.0,. Tests with OPC clients connected locally or remotely to the OPC server proved a good functionality

March 16, 2004Alice controls workshop, S.Popescu Iseg OPC server (2) Open questions: –Two DA OPC server: crate + module  two Canbuses per crate V2.06 and 2.09 Possible in the near future release a common space name –CPU load and namespace server: v 2.06 the asynchronous (r/w access, device readings) was approx 50 % and synchronous (r access, cache readings) was 25 % for 32 channels v2.09 asynchronous reading (r/w access, device readings) ~ 24 % for 32 channels and synchronous reading (r access, cache readings) ~ 15 % V 3.0 only one namespaceserver

March 16, 2004Alice controls workshop, S.Popescu Iseg OPC server (3) –Alarm and Event server: V2.06 and 2.09 still have this feature. PVSS II v2.12 or any commercial OPC client (Applicom, Matrikon NI..) cannot connect to these servers PVSS II v 3.0 can connect to AE server, but no action is taken. After discussions with the Iseg company, in the next release AE will be included in the DA OPC server –Documentation is improving v2.09 compare to v2.06 Channel status, General status, Configuration of the relay and regulation error, Alarm are for the first time described Crate DA and AE server for crate is for the first time described –Possible in the near future a workable version, but no official release date has been suggested so far

March 16, 2004Alice controls workshop, S.Popescu Iseg OPC server(4) Configuration of the OPC server: –each OPC server release is firmware depended –firmware upgrading can be done only via the IsegHVM software or by the company –A device key code must be issue by the company for any new OPC release Framework integration: –on hold till a final version of the Can bus protocol and OPC server will be release As temporary solution one can download the PVSS control software IsegTest v2.2 (author S.P) from Current version is working with Iseg OPC v 2.09

March 16, 2004Alice controls workshop, S.Popescu Conclusions Present tests for Wiener and Caen OPC server together with Framework v2.05 show good performances. An official and final release of Iseg OPC server expected to be announce soon by the company Future tests with an increased number of hardware (crates, board, channels) are needed for all the OPC servers.