Cisco Confidential © 2012 Cisco and/or its affiliates. All rights reserved. SmartPlay 7 Cisco Global Data Center Sales Q2 – Q3 FY14.

Slides:



Advertisements
Similar presentations
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Channel Partner ConfidentialC Cisco Not For Resale Program (NFR) Re-launch Australia.
Advertisements

PowerEdge T20 Customer Presentation. Product overview Customer benefits Use cases Summary PowerEdge T20 Overview 2 PowerEdge T20 mini tower server.
PowerEdge T20 Channel NDA presentation Dell Confidential – NDA Required.
© 2012 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1.
Managed Reseller Incentives Training
Emulex Confidential 11 10GB Ethernet: More than a Big Pipe Donal Madden Emulex 1.
Confidential Prepared by: System Sales PM Version: 1.0 Lean Design with Luxury Performance.
© 2010 Cisco and/or its affiliates. All rights reserved. 1 Microsoft Exchange Server Ready UCS Data Center & Virtualizacion Cisco Latin America Valid through.
© 2013 Cisco Systems, Inc. and VMware 1 Cisco and VMware: Transforming Desktops into End-User Workspaces UCS Solution Accelerator Pak with VMware Horizon.
Cisco UCS Mini Martin Hegarty| Product Manager | Comstor
Campaign Objectives Heighten awareness of Cisco UCS as a compelling, cost effective solution Pro-actively attack server refresh, run rate and solution.
Cisco Confidential © 2010 Cisco and/or its affiliates. All rights reserved. 1 Gunnar Mende Product Sales Specialist – Data Center / Virtualisierung
VoipNow Core Solution capabilities and business value.
Systems and Technology Group © 2004 IBM Corporation IBM System x and System Storage Programs and Promotions Summary © 2008 IBM Corporation 1 1Q 2008 Programs.
Cisco and NetApp Confidential. Distributed under non-disclosure only. Name Date FlexPod Entry-level Solution FlexPod Value, Sized Right for Smaller Workloads.
Customer Presentation
BROCADE FASTIRON WS SALES PROMOTION BRC0029 © 2013 Brocade Communications Systems, Inc. CONFIDENTIAL— Company Proprietary Information. 1.
1 © 2003 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID 3Q05 Programs: SMB Partner Easy Discount (SPED) SMB Icebreaker Siddarth.
Intel ® Server Configurator Tool Training Guide. Intel® Server Configurator Tool Enhancements New Website look consistent with Intel style for ease of.
Cisco Confidential 1 © 2010 Cisco and/or its affiliates. All rights reserved. Data Center Solutions Marketing Data Center Business Advantage Customer Proof.
Microsoft Confidential. All Offers and Incentives subject to T&Cs 1 Building the Bottom Line with Offers & Incentives.
Copyright 2009 Fujitsu America, Inc. 0 Fujitsu PRIMERGY Servers “Next Generation HPC and Cloud Architecture” PRIMERGY CX1000 Tom Donnelly April
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. HP Networking - EMEA Promotion.
Confidential Prepared by: System Sales PM Version: 1.0 Eco-Focused and Efficient 1U Server.
© 2013 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1 © 2013 Cisco and/or its affiliates. All rights reserved. Cisco Confidential.
SWITCH AND HBA DEAL REGISTRATION OVERVIEW. © 2008 Brocade Communications Systems, Inc. All Rights Reserved. 2 Switch and HBA Deal Registration OverviewNovember.
Enterprise Platforms & Services Division (EPSD) JBOD Update October, 2012 Intel Confidential Copyright © 2012, Intel Corporation. All rights reserved.
Looking Ahead: A New PSU Research Cloud Architecture Chuck Gilbert - Systems Architect and Systems Team Lead Research CI Coordinating Committee Meeting.
IBM Channel Enablement Speed Sheet – IBM Global Services TOP ACTIONS NameDescriptionDateAnnounce Deadline! Certification requirement for IBM ISS Deal Registration.
Bosch DSA Storage (based on NetApp E2700)
1 © 2002, Cisco Systems, Inc. All rights reserved. Cisco Channel Partner Programs Prepared for AT&T by Chris Duffy Updated: April 6 th, 2005.
EMEA Networking Promotions Core Values For T2 Resellers (v3 – 7 th April 2014)
Cisco Confidential © 2012 Cisco and/or its affiliates. All rights reserved. 1 Cisco Partner Plus Accelerate Your Competitive Edge Speaker Name Speaker.
Cisco Confidential 1 © 2011 Cisco and/or its affiliates. All rights reserved. Cisco Small Business Advantage The Easy Path to Greater Profitability Selling.
Cisco Confidential © 2013 Cisco and/or its affiliates. All rights reserved. 1 Cisco Learning Credits Leverage Training to Drive Customer Value.
Cisco Confidential © 2013 Cisco and/or its affiliates. All rights reserved. 1 Cisco Learning Credits Leverage Training to Drive Customer Value.
Cisco Confidential © 2010 Cisco and/or its affiliates. All rights reserved. 1 Jeff McEachern Business Development Manager Smart Services Smart Care.
Bill Shields Sr. Marketing Manager, PMP, June 13, 2015 What Happens When SQL Server 2015 Meets Cisco UCS? Better Business Intelligence.
1 © 2016 Cisco and/or its affiliates. All rights reserved. Cisco Confidential New SWSS Starter Offer for 2H FY16 in EMEAR Partner Presentation BE6000 Update.
Customer Business Benefit Customer Use Case Competitive Differentiation Additional Information Intelligent, VM-aware storage networking for Cisco DC/V.
How to Grow and Win Across the Customer Lifecycle with Software.
Ordering - BoM Cisco ONE VIP 26 Overview Duration: 1.5 hrs Notes: Update colors and bring into new template. Remove this photo and use it on slide 5 instead.
© 2010 Cisco and/or its affiliates. All rights reserved.Cisco ConfidentialPresentation_ID 1 Outpace the Competition with the Cisco Collaboration Breakaway.
UCS & VCE “YES” Promotion – Valid through Dec 24 th, 2010 Overview for Partner Nov 10, 2010.
Dell PowerEdge Blade Server PDVSA Jun-05
C © 2010 NetApp, Cisco, and VMware. All Rights Reserved. Presented Jointly by Cisco, NetApp, and VMware FlexPod for VMware.
Customer Business Benefit Customer Use Case Competitive Differentiation Additional Information Enables Cisco Unified Fabric for next generation data centers.
IBM Channel Enablement Speed Sheet – IBM Global Financing NameOffering DescriptionEnd DateMore… 0% IBM Software Financing NEW IGF is extending 0% software.
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1 Marcello Scippa – CDN Manager Josie Garcia– CDN Partner Relations Manager.
SmartPlay Select- (SP)
Bundle Name / PIDConfiguration Summary B200 Value UCS-SP2-ENTV-B200 (4) B200 M2 Blades (1) Chassis w/ 4 PS (2) Fabric Interconnects (6120) Six-Port 8GB.
Huawei Server Competitive Positioning
Cisco Confidential 1 © 2010 Cisco and/or its affiliates. All rights reserved. Q3 Velocity Program DC / V Partner Details – V1 February 2011.
1 © 2014 Cisco and/or its affiliates. All rights reserved. Cisco Confidential We will begin shortly Recording begins now.
Valid Until End of February 2017
FastTrack - UCS C-Series - PowerUp EU Distribution
HPE ProLiant ML350 G9 Server
Q4 Velocity Program: Nexus 7000 FabricPath Chassis
Valid Until End of January 2017
3 steps to Cisco Data Centre-UCS success
FY17 Services Promotions Cheat Sheet
SBCS Quick Pricing Tool Training
Mitel Pricing Tool - MPT Overview of MPT. SX-200 ICP Sales Training2 Mitel Pricing Tool - MPT  The Mitel Pricing Tool (MPT) consolidates various tools.
Intel® Select solutions built on Intel® Data Center Blocks Channel Incentive SKU Details *Other names and brands may be claimed as the property of others.
EMEA Channel Promotions Q1
Promotion Valid From Sep. 1st 2009 ~ July 23rd 2010
Intel® Select solutions built on Intel® Data Center Blocks Channel Incentive SKU Details *Other names and brands may be claimed as the property of others.
SERVER INNOVATION ACCELERATES IT TRANSFORMATION
Productive + Hybrid + Intelligent + Trusted
Presentation transcript:

Cisco Confidential © 2012 Cisco and/or its affiliates. All rights reserved. SmartPlay 7 Cisco Global Data Center Sales Q2 – Q3 FY14

© 2013 Cisco and/or its affiliates. All rights reserved. 2 Cisco Confidential 2

© 2013 Cisco and/or its affiliates. All rights reserved. 3 Showcase Cisco Innovation Leadership: New Intel Xeon Ivy-Bridge CPU’s High Performance Memory SingleConnect Technology Create a UCS Footprint Create a UCS Footprint 1. Address More Use Cases w/ Multiple Form Factors 2. Be cloud-relevant w/ UCS-D Add-ons 3. Cisco’s Most Aggressive Pricing Footprint Expansion InnovationLeadership Grow Your Deals and Upsell to Existing Customers 1. C-Series SingleConnect Offers 2. Expansion Paks – Blades & Racks 3. Performance Upgrade Paks, incl HDD’s, Mem, PCIe, Mezz Options

© 2013 Cisco and/or its affiliates. All rights reserved. 4 MARKET TRANSITIONS ARE DRIVING DATA CENTER ARCHITECTURES Terms and Conditions Promos Expansion Paks & Perf Upgrade Paks Rack Paks Quoting Expiration Date April 26, 2014 July 26, 2014 Ordering Expiration Date May 24, 2014 Aug 23, 2014 Disti BTO Expiration Date – 2 wks for “Build” Claim Jun 07, 2014 Not applicable Qty Limit per Customer / Quarter 5 Promos25 - Expansion Paks**None New Account Breakaway* Up to 64%Up to 65%Up to 64% OIP NoUp to 65%No SIP Up to 65%No TIP Up to 65%No VIP DSA Try and Buy No UCS Advantage No *New Account Breakaway Applies where Applicable **Expansion Pak QTY Limitation applies to Blades only; Limit of 25 does not apply to the Chassis Pak or Performance Upgrade Paks

© 2013 Cisco and/or its affiliates. All rights reserved. 5 Intel 5500 Era Processors Intel 5300 Era “Pre-UCS” % of Server Installed Base is 4+ years old 1 Now entering refresh window 4:1 Consolidation Ratio Refresh to UCS with the UCS SmartPlay 7 Promotions 4X 3 Performance 75% 4 Consolidation Cisco UCS With Intel Xeon E5-2600v2 17:1 Consolidation Ratio 2 1 Intel analysis, Source: Intel estimation as of September See following page for configuration data and assumptions. Results have been estimated based on internal Intel analysis and are provided for informational purposes only. Any difference in system hardware or software design or configuration may affect actual performance. 3 Source: Cisco estimates as of September Performance comparison is based on SPECint_rate_base2006. Results are based on internal testing done at Cisco Labs.

© 2013 Cisco and/or its affiliates. All rights reserved. 6 Networking, Cabling & Warranty Power & Cooling Provisioning & Ongoing Administration Systems Management Software Traditional Solution UCS Solution Servers & Warranty Unified Fabric Radical Infrastructure Simplification Efficient scaling High performance Unified Management Embedded device management Self-integrating Stateless Automated Programmable

© 2013 Cisco and/or its affiliates. All rights reserved. 7 New 1. B200 Entry Plus Promo 2. B420 Value Promo 3. SingleConnect C220 Value Plus Updated B200 Entry  Processor : E  E v2  Memory : 8 x 8GB 1600 MHz  8 x 8GB 1866 MHz  VIC: Port Expander  1240 Only B200 Value  Processor : E  E v2  Memory : 16 x 8GB 1600 MHz  8 x 16GB 1866 MHz  VIC: Port Expander  1240 Only B200 Value Plus  Processor : E  E v2  Memory : 16 x 8GB 1600 MHz  8 x 16GB 1866 MHz  VIC: Port Expander  1240 Only B200 Performance  Processor : E  E v2  Memory : 16 x 16GB 1600 MHz  16 x 16GB 1866 MHz  VIC: Port Expander  1240 Only Discontinued 1. B22 Entry Promo 2. SingleConnect C220 Performance SingleConnect C220 Value  Processor : E  E V2  Memory : 4 x 8GB 1600 MHz  8 x 8GB 1866 MHz  RAID : 9266CV  9271CV  HDD : From 600GB SAS to No HDD SingleConnect C240 Value  Processor : E  E V2  Memory : 4 x 8GB 1600 MHz  8 x 8GB 1866 MHz  RAID : 9266CV  9271CV  HDD : 600GB SAS to No HDD  PSU : 650w  1200w SingleConnect C240 Performance  Processor : E  E v2  Memory : 4 x 16GB 1600 MHz  8 x 16GB 1866 MHz  RAID : 9266CV  9271CV  HDD : 600GB SAS to No HDD  PSU : 650w  1200w

© 2013 Cisco and/or its affiliates. All rights reserved. 8 New 1. B200 Entry Plus Exp Pak 2. B200 Perf Plus Exp Pak 3. SingleConnect C220 Value Plus Exp Pak 4. Fusion-IO Performance Upgrade Paks Mezz: 785GB PCIe: 365GB / 1.2TB 5. LSI Perf Upg Pak PCIe: 400GB 5. HDD Perf Upg 4-Packs 1TB & 300GB 15K HDDs Updated B200 Entry Expansion Pak  Processor : E  E v2  Memory : 8 x 8GB 1600 MHz  8 x 8GB 1866 MHz  VIC: Port Expander  1240 Only B200 Value Plus Expansion Pak  Processor : E  E v2  Memory : 16 x 8GB 1600 MHz  8 x 16GB 1866 MHz  VIC: Port Expander  1240 Only B200 Performance Expansion Pak  Processor : E  E v2  Memory : 16 x 16GB 1600 MHz  16 x 16GB 1866 MHz  VIC: Port Expander  1240 Only SingleConnect C220 Value Exp Pak  Processor : E  E V2  Memory : 4 x 8GB 1600 MHz  8 x 8GB 1866 MHz  RAID : 9266CV  9271CV  HDD : From 600GB SAS to No HDD 8GB Memory 4-Pack  Now w/ 1866 MHz DIMMs 16GB Memory 4-Pack  Now w/ 1866 MHz DIMMs Discontinued 1. B200 Fusion-IO Exp Pak 2. C220 Performance Exp Pak SingleConnect C240 Value Exp Pak  Processor : E  E V2  Memory : 4 x 8GB 1600 MHz  8 x 8GB 1866 MHz  RAID : 9266CV  9271CV  HDD : 600GB SAS to No HDD  PSU : 650w  1200w SingleConnect C240 Perf Exp Pak  Processor : E  E v2  Memory : 4 x 16GB 1600 MHz  8 x 16GB 1866 MHz  RAID : 9266CV  9271CV  HDD : 600GB SAS to No HDD  PSU : 650w  1200w B22 Entry Expansion Pak  Price and Part Number Change Only B230 Entry Expansion Pak  Price and Part Number Change Only B230 Value Expansion Pak  Price and Part Number Change Only B200 Perf Expansion Pak  Price and Part Number Change Only Unchanged GB HDD 2-Pack GB HDD 2-Pack

© 2013 Cisco and/or its affiliates. All rights reserved. 9 SmartPlays on the Cisco DC Partner CommunityDC Partner Community Disti Central Cisco Partner Central Cisco Product Catalog SmartPlays on IWEIWE Download Full Package from Cisco DocsCisco Docs (Internal Cisco Build and Price Cisco Product Catalog Cisco Partners Customers

Cisco Confidential © 2012 Cisco and/or its affiliates. All rights reserved. 10 MARKET TRANSITIONS ARE DRIVING DATA CENTER ARCHITECTURES SmartPlay 7 Promotional Offers Promos Performance Upgrade Packs Expansion Paks Rack Paks Objective Drive Cisco Fabric-Based ComputingDrive Transactional Compute Products UCS B-Series and C-Series Bundles Select Performance Upgrade Packs UCS C- Series Bundles Configurations Rich, FixedThin, Configurable Price Aggressive pre-discounted priceCompetitive pre-discounted price Discounts Standard UCS Partner discount No DSA Standard UCS Partner discount No DSA Orderability Cisco Direct or DistributionDistribution Only Quantity Limitations Maximum Qty per end userNo quantity limitation Program Period 6 month9 to 12 months

© 2013 Cisco and/or its affiliates. All rights reserved. 11 Improved Performance with the latest Intel E v2 Processors More Processor Options with SP7 RackPaks Better Upfront Pricing, Now with RAID Pre-bundled. Higher Memory Speed Support – Now upto 1866 Mhz Now with 650 watt Power Supplies Extended Promotion Period – 9 to 12 months C240 M3 Bundles with 24-Drive Chassis

© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 12 3 New Distributor to Partner Assets coming* 1. At-A-Glance (2pg) Marketing Flyer Available on Disti Central (11/8) generation/smartplay-rack-pak * Assets available in English at launch; Localization TBD Partner Assets for all SP7 tions/cisco_smartplay_promo.html

© 2013 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 13 Program Goal Partner Incentive Account/Deal Eligibility Program Overview Partner Requirements Provide a compelling partner incentive for UCS Specialized partners:  To capture new UCS customers through partner-hunted deals  Increase partner hardware margin by 70% - 85%  Develop a new recurring revenue stream  Higher discount on UCS products - only applies to eligible UCS SKUs  Higher discount for UCS Smart Play promotional bundles  Higher discounts for Nexus, Cloupia, DC Security, MDS Fabric Switches  Services are not eligible for this promotional bonus  Discount can apply to follow-on orders within same account BoM for 180 days To qualify as a UCS New Account, Cisco must confirm that:  Customer Account has not previously purchased any UCS systems  Account/Deal is solely Partner-hunted and developed  Deal is fully approved in CCW  Deal does not conflict with a currently registered CCW OIP/TIP/SIP deal  BoM must be at least 30% UCS Product 1.Partner must be UCS-specialized to resell UCS B-Series (UCT or DCA) 2.Partner must be Select/Premier/Silver/Gold to qualify for this promotion 3.Partner must register deal in CCW using ‘UCS New Account Breakaway’ 4.Cisco AM and Program team confirm deal qualifies as a new UCS account 5.Theater promotion governance team confirms that deal meets qualification and does not conflict with a currently approved CCW deal (including OIPs) Promotion Period Cisco Q1/Q2 FY14 - Deal Registration Period: up to January 25 th 2014 Bookings Period: 6 months after registration, or July 26, 2014 (whichever comes first) UCS New Account Breakaway Promotion At-A-Glance (Q1/Q2 FY14) for Applicable Regions

© 2013 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 14 Trade-InTrade-ToCredit HP Blade or RackUCS M3 Blade$650 UCS M1/M2 Blade or RackUCS M3 Blade$650 HP Blade ChassisUCS 5108 Chassis$1,600 Cisco 2100 IO ModuleCisco 2200 IO Module$450 Cisco 6100 Fabric Interconnect Cisco 6200 Fabric Interconnect$3,000

© 2013 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 15 Cisco ® Rewards is a new incentive program that rewards your performance and helps you improve sales. Points are earned for participating in qualifying Cisco activities. The program website makes converting sales to points simple. Built-in flexibility lets you view your claims, track points, and redeem them for exciting rewards. For more information about Cisco Rewards visit: cisco.com/go/ciscorewardscisco.com/go/ciscorewards Cisco.com ID required