Executive Session Director’s CD-1 Follow-Up Review of the APUL Project November 2-3, 2009 Dean A. Hoffer.

Slides:



Advertisements
Similar presentations
OFFICE OF SCIENCE Kurt W. Fisher Review Committee Chair Office of Science, U.S. Department of Energy 1 Closeout Report.
Advertisements

OFFICE OF SCIENCE Stephen W. Meador, Chairperson DOE/SC Review Committee Office of Science, U.S. Department of Energy Review.
The Value of a Project Management Office Copyright: Kathy J. Lang, 2004.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
Mu2e WGM 2/22/2011 R. Ray Mu2e Project manager. CD-1 Our sole focus is on CD-1 and in particular, the Director’s Review scheduled for April 3-5. To be.
OFFICE OF SCIENCE Kin Chao, Chairperson DOE/SC Review Committee Office of Science, U.S. Department of Energy Review Committee.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
OFFICE OF SCIENCE Review Committee for the LHC ATLAS Detector Upgrade Project Brookhaven National Laboratory (review conducted at Fermi National Accelerator.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
First Executive Session Fermilab Director’s/DOE Fermi Site Office's Performance Management System Review of the NOvA Project June 19-20, 2007 Frank Gines.
OFFICE OF SCIENCE Review of Critical Decision 1 for the Large Liquid Argon Detector for Neutron Physics (MicroBooNE) at Fermi National Accelerator Laboratory.
Undulator System Review Closeout Erik Johnson, Kem Robinson, Dieter Walz 4 March 2004.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
Muon Campus Controls Update Brian Drendel 8/6/13.
Fermilab Implementation of DOE Critical Decision Process FRA Project Management System Presentation by L Edward Temple Jr Head, Office of Project Management.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities CD-2 Planning May 8, 2007.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
Lab-Wide Earned Value Management System Project Core Team Meeting October 01, 2008 Dean A. Hoffer/Elaine McCluskey.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
7/26/2006 Wyatt Merritt 1 DECam Preparations for Critical Decision 2/3a Preparations for CD2 Preparations for CD3a DECam MOUs.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
11 FSO Assessment of Fermilab QA Program Status September 14 – 18, 2009.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Mu2e Cost and Schedule Ron Ray Mu2e Project manager Fermilab PAC Meeting November 3-4, 2008.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
Executive Session Director’s Progress Review of the NOvA Project August 4-5, 2010 Dean A. Hoffer.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
OFFICE OF SCIENCE Review Committee for the LHC CMS Detector Upgrade Project Fermi National Accelerator Laboratory August 26-27, 2013 Kurt Fisher Review.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
DUSEL Beamline Working Group Meeting March 09, :00 AM – Snake Pit (WH2NE) By Dean Hoffer - OPMO.
OFFICE OF SCIENCE 1 Closeout Report on the DOE/SC CD-3b Review of the Utilities Upgrade Project (UUP) Fermi National Accelerator Laboratory August 11-12,
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
AGS RSVP Weekly Meeting P. Pile 6 Jan 2005 AGS RSVP Weekly Meeting 6 Jan 2005 Useful Links: RSVP Project : C-AD.
Project X Working Group Meeting January 15, :00 PM Snake Pit.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
OFFICE OF SCIENCE Closeout Report by the Review Committee for the LHC-CMS Detector Upgrade Project Fermi National Accelerator Laboratory August 27, 2013.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Executive Session Director’s Conceptual Design Review of Mu2e Project May 3-5, 2011 Jim Yeck.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Executive Session Director’s Conceptual Design Review of Muon g-2 Project June 5-7, 2013 Jon Kotcher.
OFFICE OF SCIENCE DOE/SC CD-2/3b Review of the Muon to Electron Conversion Experiment (Mu2e) Project Fermi National Accelerator Laboratory February 4,
OFFICE OF SCIENCE DOE/SC CD-3c Review of the Muon to Electron Conversion Experiment (Mu2e) Project Fermi National Accelerator Laboratory June 14-16, 2016.
CMS HL-LHC Detector Upgrades Project Planning Workshop, 26th – 30th Sept 2016, Fermilab Lucas Taylor Associate PM (for Cost, Schedule, Risk) Overview and.
Comments on the February DOE Review
Principal Investigator ESTCP Selection Meeting
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Camera PDR/CD1 Planning 19 September 2008
Head, Office of Project Management Oversight (OPMO)
Principal Investigator ESTCP Selection Meeting
LCLS Linac Technical Design Review Charge
Preparations for a Lehman Review
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT– WEEK 4 Mumtaz Ali Rajput +92 – 301-
Principal Investigator ESTCP Selection Meeting
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

Executive Session Director’s CD-1 Follow-Up Review of the APUL Project November 2-3, 2009 Dean A. Hoffer

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 2 Agenda for Exec Session Charge to Reviewers Review Agenda DOE O Critical Decision Table Document Requirements Technical Design Review Guidance Cost/Schedule Review Guidance Reporting Structure Reviewer Assignments Cost / Contingency Table Discussion

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 3 Charge

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 4 Charge (continued)

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 5 Charge Attachment #1

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 6 Charge Attachment #1 (continued)

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 7 Agenda

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 8 Agenda (continued)

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 9 Agenda (continued) Additional Rooms IB3 IB 1 Mezz

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 10 DOE O Critical Decision Table

CD-1 Documentation Acquisition Strategy Preliminary Project Execution Plan (PEP) Preliminary Project Management Plan (PMP) Assumptions Document Conceptual Design Report (CDR) Baseline Range and Resource Loaded Schedule Configuration Management Plan Preliminary Hazard Analysis Report Risk Management Plan and Risk Assessment Value Management Documentation Quality Assurance Program Documentation 02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 11

Two Parts to the Review Technical - Independent Conceptual Design Review Cost, Schedule and Project Management Review 02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 12

Technical – Conceptual Design Review Design Reviews are performed to determine if a product (drawings, analyses, or specifications) is correct and will perform its intended functions and meet requirements. APUL’s technical scope was found to be in reasonably good shape during the July 16-17, The committee is to evaluate conceptual design as part of the independent review and should concentrate on any changes to that design since the last review. 02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 13

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 14 Cost/Schedule Review Guidance

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 15 Cost/Schedule Review Guidance (Continued)

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 16 Cost/Schedule Review Guidance (Continued)

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 17 Cost/Schedule Review Guidance (Continued)

Subcommittee Assignments SC1 – D1 Magnets Jim Kerby Bob Kephart John Tompkins SC2 – Cold Powering System Gary McIntyre Jay Theilacker Joe Tuozzolo SC3 – Cost, Schedule and Project Management Jeff Sims Fran Clark Suzanne Saxer Note: Underlined names are subcommittee lead. 02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 18

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 19 Reviewer Assignments

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 20 Reviewer Assignments (continued)

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 21 Reviewer Assignments (continued)

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 22 Reviewer Assignments (continued) 5.3 Cost - D1 Magnets Does the conceptual design report and supporting documentation adequately justify the stated cost range and project duration? John Tompkins Do the cost estimates for each WBS (or cost) element have a sound documented basis and are they reasonable? Has the project established a realistic cost estimate for the D1 Magnets work associated with performing Preliminary Design, Final Design and Value Management activities? 5.4 Cost – Cold Powering System Does the conceptual design report and supporting documentation adequately justify the stated cost range and project duration? Jay Theilacker Do the cost estimates for each WBS (or cost) element have a sound documented basis and are they reasonable? Has the project established a realistic cost estimate for the Cold Power System work associated with performing Preliminary Design, Final Design and Value Management activities? 5.5 Cost – Overall Project Has the project established a realistic cost estimate for all work associated with performing Preliminary Design, Final Design and Value Management activities? Suzanne Saxer Does an obligation profile exist and is it within funding guidance?

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 23 Reviewer Assignments (continued)

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 24 Reviewer Assignments (continued)

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 25 Reviewer Assignments for Breakouts

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 26 Reporting Structure Review findings, comments, and recommendations should be presented in writing at a closeout with the APUL’s, Fermilab’s, and Broohaven’s management. Section for each “Level 2” WBS plus Cost, Schedule, Management sections.

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 27 Findings, Comments, and Recommendations Findings Comments Recommendations Findings are statements of fact that summarize noteworthy information presented during the review. Comments are judgment statements about the facts presented during the review. The reviewers' comments are based on their experiences and expertise. The comments are to be evaluated by the project team and actions taken as deemed appropriate. Recommendations are statements of actions that should be addressed by the project team. A response to the recommendation is expected and that the actions taken would be reported on during future reviews.

Examples of Findings, Comments, and Recommendations Finding –A plan for the MI upgrades was presented. The major elements of this plan consist of an upgrade of a MI quad power supply, which is nearly complete, and the addition of two more RF stations. The cavities to be installed currently exist as spares so there is no design and prototyping required. Comment –The project has decided to build the DCCT in-house. The committee supports this effort since the technology and design of this device is well developed and well known. Recommendation –Work with Fermilab management to acquire resources needed to complete the accelerator and beamline modifications. 02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 28

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 29 Old Project’s Cost & Contingency Estimate from July Review

New Project’s Cost & Contingency Estimate 02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 30

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 31 Reviewer Write-ups Write-up template is posted on Director’s Review Webpage. Write-ups are to be sent to Terry Erickson at prior to 11:30 AM on Tuesday, November 3 for the Closeout Dry Run A final report will be issued within 1 week after the closeout.

02-Nov-2009Director's CD-1 Follow-up Review of the APUL Project 32 Discussion Questions and Answers