Alice ITS L5,6 Integration 1 End wheels and local services design – services layout on the end wheels: patch panels, routing, cooling and qualification.

Slides:



Advertisements
Similar presentations
Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating.
Advertisements

IBL Brazing Study April the 20 th 2012 Eric Vigeolas.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
16/5/2003SCT PAR, Georg Viehhauser1 Assembly of Modules to Cylinders Georg Viehhauser.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 Stave.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
IB stave assembly A. Di Mauro, C. Gargiulo, J. Van Beelen ITS-MFT mini-week
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Hybrid Integrated Circuit
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: Calibration of Johansson measuring machine Cooling components Half-stave.
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: News about mechanics components Report on first test of cooling plant.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Design Progress Allen Ellis 18-September
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
TOB Production - January of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
Marcello Lunardon - ALICE Gluing Meeting 010/03/2003 Study of glues for the assembly of the ALICE Silicon Pixel Detectors Status at The PADOVA.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
CALICE SiW EcalAboud Falou/ LAL-Orsay Detector SLAB Integration EUDET Prototype Slab cross section, thickness budget Space Frame Ladder {Step.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Solar Array Design Review Yashraj Khaitan David Glaser Kevin Jenkins Chris Pasma Space Sciences Laboratory University.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
Level 1 – Maintenance activities Produced by Neil Liggett.
ATLAS ID Services Mock Up - Proposal Presented by Ian Wilmut at DESY, update from John Hill 4th May, 20101ATLAS Upgrade - RAL.
ATLAS Internal ID Service Integration
QXF Coil Fabrication & Tooling Reaction / Impregnation
Ladder Assembly All tools and jigs produced Glue dispensing works
Assembly procedure – Inner Region
Mechanics: (Tim).
WP9 ITS Mechanics and Cooling
Installation step 4. (3 days)
Integration issues at IHEP
Low Mass mechanical design
F. Ronchetti, INFN-LNF, September
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
IBL activities ATLAS Meeting Milano, 14 May 2012 S. Coelli,
GLAST Large Area Telescope:
The pursuit of perfection
Presentation transcript:

Alice ITS L5,6 Integration 1 End wheels and local services design – services layout on the end wheels: patch panels, routing, cooling and qualification – End wheels design wrt services requirements Integration tool design, production, procedures: – Fixing features on wheels (pads, rubys): positioning, fixing – Staves handling – Staves insertion – Staves position measuring – Qualification – Half layer handling, half-L5 and L6 coupling – L5, L6 mockup(s) – Mechanical integration of L5,6 staves at Cern

First models of integration tools Staves fixing features: single stave replacement capability 2

Half layer / half barrel measurement: Procedure for measuring the staves position wrt half-layer references References for half layers / half barrel measurement wrt Alice reference system Test of optical probe as available at Cern metrology

Sezione di Padova Risorse di personale End wheel services layout 1 st iteration of end-wheels and services layout. End-wheels: staves insertion/maintenance pigtails insertion/extraction Layer/barrel stiffness Cern design

Alice ITS L5,6 Integration plan 5 Define integration tool design: fixing pad jig, stave integration L5,6 half-barrel mock-up Staves and wheels measurement strategies and tools Services requirements, schematics and layout Services assembly procedures and qualifications

Alice ITS L5,6 Integration procedure 6 – Fixing features on wheels (pads, rubys): positioning, fixing Fix # pads/rubys to jig Glue disposal Mask positioning, Reference jig measuring Curing Jig removal and checks – Staves handling and insertion stave shipping box/fixtures Positioning on handling table Acceptance tests Fix to integration tool PINZE Lift stave, positioning, checks, fixing, tool removal, checks, Services connections, fastening Services joints qualification – Staves position measuring Contact measures on stave ends Optical measures as possivle – Half layer handling, half-L5 and L6 coupling