10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna TOF readout Reminder of TOF readout scheme and TOF readout modules Overview of specifications with.

Slides:



Advertisements
Similar presentations
On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
Advertisements

TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
Selection Board PRR G. Avoni, I. Lax, U. Marconi INFN Bologna PRR, 13/6/06.
ESODAC Study for a new ESO Detector Array Controller.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
1 Design of the Front End Readout Board for TORCH Detector 10, June 2010.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
Huazhong Normal University (CCNU) Dong Wang.  Introduction to the Scalable Readout System  MRPC Readout Specification  Application of the SRS to CMB-MRPC.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
DEVICES AND COMMUNICATION BUSES FOR DEVICES NETWORK
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Yuri Velikzhanin NuTel TV meeting, June 13 (Friday), 2003 Status of electronics for NuTel prototype.
RCU Status 1.RCU design 2.RCU prototypes 3.RCU-SIU-RORC integration 4.RCU system for TPC test 2002 HiB, UiB, UiO.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
9 th Workshop on Electronics for LHC Experiments 2 October 2003 P. Antonioli (INFN/Bologna) A 20 ps TDC readout module for the Alice Time of Flight system:
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
13/17 Sept th Workshop on Electronics for LHC and future experiments P. Antonioli INFN-Bologna 1.The TDC module of ALICE/TOF 2.Irradiation at.
Status and Improvements of TDCB project TDAQ working group meeting Andrea Burato (INFN Pisa) On behalf of TDCB working group.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
Samuel Silverstein Stockholm University CMM++ firmware development Backplane formats (update) CMM++ firmware.
Status of TRD Pre-trigger System K. Oyama, T. Krawutschke, A. Rausch, J. Stachel, P. von Walter, R. Schicker and M. Stockmeier for the T0, V0, and TRD.
TTC for NA62 Marian Krivda 1), Cristina Lazzeroni 1), Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava, Slovakia 3/1/20101.
DAQMB Status – Onward to Production! S. Durkin, J. Gu, B. Bylsma, J. Gilmore,T.Y. Ling DAQ Motherboard (DMB) Initiates FE digitization and readout Receives.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Control for CTP and LTU boards in Run
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Standard electronics for CLIC module. Sébastien Vilalte CTC
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Readout controller Block Diagram S. Hansen - CD-1 Lehman Review1 VXO Ø Det Links to 24 SiPM Front End Boards Clock Event Data USB ARM uC A D Rd Wrt 100Mbit.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
PC-based L0TP Status Report “on behalf of the Ferrara L0TP Group” Ilaria Neri University of Ferrara and INFN - Italy Ferrara, September 02, 2014.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
Compact data acquisition and power supply system designed for hostile environment condition concerning radiation and magnetic field A. Mati, S. Petrucci,
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
The Data Handling Hybrid
Status of NA62 straw readout
P. Antonioli / INFN-Bologna
Production Firmware - status Components TOTFED - status
TOF Upgrade: (few) updates
T1 Electronic status Conclusions Electronics Cards:
HCAL Data Concentrator Production Status
L0 processor for NA62 Marian Krivda 1) , Cristina Lazzeroni 1) , Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava,
CMS EMU TRIGGER ELECTRONICS
ECAL OD Electronic Workshop 7-8/04/2005
VELO readout On detector electronics Off detector electronics to DAQ
NA61 - Single Computer DAQ !
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
PID meeting Mechanical implementation Electronics architecture
RPC Electronics Overall system diagram Current status At detector
TELL1 A common data acquisition board for LHCb
Presentation transcript:

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna TOF readout Reminder of TOF readout scheme and TOF readout modules Overview of specifications with an emphasis on requirements for groups who want to use TOF electronis

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna TOF readout reminder 18 TOF supermodules Crates with HPTDC Front-End cards with ASIC (NINO) 8 m Rad-tolerance issues for electronics inside crates

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna TOF readout reminder (2) 6U depth x 9U height

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna TRM reminder VME bus HPTDC Output Fifo Readout Controller VME Interface Event Manager SRAM 32 TRG 32 x 15 L2r L2a L1 INPUTS (LVDS) 684 Tdc Readout Module inside crates Tested all components during 2004 irradiation campaigns SRAM HPTDC LUT EVENT BUFFERS FLASH CC FIRMWARE HPTDC LUT Functionalities implemented by an FPGA BOOT SEL WATCHDOG

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna Final TRM layout To allow maintenance, easy mounting operation and matching with front end, HPTDC mounted on 24 ch piggy back

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna Final TRM layout (2) 5 piggyback cards per side, 1 central PCB for FPGAs and memories, central aluminium bar for heat dissipation 6U MB prototype housing 2 PB

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna Radiation levels reminder Radiation levels expected at ALICE/TOF: 1.2 Gy/10 years (TID) Total neutron fluence (>20 MeV): /cm 2 /10 years. Total charged hadrons (>20 MeV): /cm 2 /10 years. 89 Hz/cm 2 expected in PbPb MB events (hadrons+neutrons > 20 MeV). For ALICE/TOF careful design needed to handle SEU, Degradation for TID effects neglectable. Latchup protections needed. Some specifications modified in 2004 due to the need to implement radiation tolerant electronics.

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna DRM reminder Tasks: 1.Read data on VME backplane (from TRM) 2.Send data to central Alice DAQ through DDL 3.Provide interface with trigger (TTC) 4.Provide Slow Control function/access to VME 5.Actel reprogramming Work done during 2004: Developed and tested DDL interface Developed and tested TTC interface Radiation test to check various slow control solutions On-going definition of crate/TRM specifications following tender won by CAEN and impacting on DRM specs.

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna Final DRM scheme VME bus Readout VME interface FPGA: Actel ProAsic+ Slow control access FPGA: Actel ProAsic+ SRAM EVENT BUFFERS FLASH CC FIRMWARE BOOT SEL WATCHDOG TTCrx DDL SIU Optical link to PC (PCI bus) VME ACCESS ARM (Actel reprogramming) Eth0/ Slow Control backup

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna How we arrived here... DDL integration tested with DRM prototype card (Dec ’03/Jan ’04) TTC integration tested (July ’04) with DRM prototype card + TTCvi/TTCex + LTU (Sep/Oct ’04) Tests done for TRM emphasized rad-tol problems with Altera FPGAs. Need to move FPGA TRM (now Actel) reprogramming to DRM (this makes DRM/TRM specifications much more interconnected) PowerPC from Artesyn as slow control solution successfully tested in magnetic field (Dec ’03), but not encouraging test in radiation (PSI/May ’04). Looked for a different solution. Optical link tested in radiation. The use of new DDL-D-RORC cards (with two optical links each) allows to avoid master/slave scheme between the two crates, simplifying our design (decision taken March ’04, without any impact on foreseen costs) and making readout much more robust (every crate is “independent”). NOT RELEVANT FOR T0

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna Rad tests and FPGA... PSI May & June ’04: Altera Stratix, Flash, RAM,  C, low- drop, current limited p-switch, PowerPC LNL July ’04: HPTDC with heavy ions CRC/Louvain Nov ’04: optical link and ARM processor Assessed SEU rates for almost all components (not discussed here, see LECC2004 paper). Stratix for TRM is not a viable option. Moved to reprogrammable Flash based FPGA (Actel ProAsic Plus) [rad tests in ALICE and LHCb ok) BUT: Additional logic needed to support Actel reprogramming

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna Actel reprogramming Due to the technology inherently more robust (Flash vs RAM) configuration upset absent. Need of special voltages during reprogramming: +16.2, V Configuration is not simply a matter of handlong a download through a passive serial Flash, but the firmware code needs to be interpreted while downloading (RAM also needed for staging) We added 2 power supply (x crate) providing and V (we will use +/- 12 V pins). We wil use one external (to the TRM)  C and use JTAG on the backplane (MTM bus on VME64X)

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna Actel reprogramming (2) High integration needed Prescriptive steps to start reprogramming (power up / addressing / etc) Crate VME... Now not so standard!

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna Move slow control outside The “big” change is related to the choice of the slow control/configuration solution: we move outside the “intelligent” part (18 PC in control room, each connected to 4 crates). Optical PCI-VME adapters commercially available. Make it rad-tolerant implementing FPGA with Actel + use serializer/deserializer tested in radiation [successfully tested at Louvain in Nov. ’04] V2718 from CAEN

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna VME mastering Test carried out jointly with CAEN Modified firmware of their VME Master (V1718/V2818/A2818). FPGA initiating VME cycles when in DAQ mode (end Oct ’04) HPTDC Trigger DS DTACK CDM prototype 250 ns!

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna CPDM Clock and pulser distribution module - Hosted only in one crate every two - “simple” but “delicate” card - No VME interface required, latch-up protections as for TRM/DRM/LTM - tests carried out to check clock jitter of present clock distribution scheme defined clock cable and connectors - the pulser section of this card is not relevant for T0

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna Clock Distribution tests -Over 16 channels tested in optical fan-out jitter always well below 15 ps - Opt.rec/LVDS adaptation ok.

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna Clock jitter and distribuition Defined high quality clock cable and connectors for distribution from CPDM to TRM/DRM/LTM, Tripolar connectors (including shield) from Tyco (CPDM) and Fischer -Over 16 channels tested in optical fan-out jitter always well below 15 ps - Opt.rec/LVDS adaptation ok. Tyco: CPDM side Fischer: TRM side

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna P2 bus Through P2 main synch and trigger signals distributed to TRMs. All signals LVTTL (the most time critical ones “LVTTL differential”) DRDY and BUSY for readout. ON/FAULT signals for control.

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna Guidelines for TRM users Questions: - 48 channels leading edge only - 96 channels after your charge to time converter - correct? - others? About demultiplexing story: Working in VHRM, leading edge only, 4 channels/HPTDC maximum bandwidth: 5 MHz (which is different from dead- time and different from buffer occupancy). T0 needs 156 ch, but with only 4 ch/HPTDC, so T0 needs two TRMs

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna Input signals must be LVDS We use VHDCI connectors, with custom pin-out, 24 pairs per cable. We use Amphenol Skewclear cables. Tested up to 7 m, using NINO as LVDS driver. Please check carefully cable length and your LVDS driver. You will need at least 156/12=13 cables (you will use one signal every 2) Guidelines for TRM (2)

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna Guidelines for TRM (3) Data are matched on L1 and moved in memory buffers, waiting for L2a. TRM memory size (512 kB) designed for Pb/Pb TOF occupancy and 240 channels/TRM. Please check if it is ok for your need. In principle T0 doesn’t need CPDM but you need to provide to the 2 TRMs and 1 DRM, high quality LHC clock in LVDS standard, using the Fischer tripolar connector. Our suggestion: use our CPDM. You need to bring to the CPDM LHC clock with unimodal fibre (could be interesting to send it from the same optical fan-out used for TOF crates).

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna Guidelines for crates Please consider the following (just to use the crate as it is): - such a system needs water (but we should test if it is really necessary: just 4 cards over 12, and you can put fans around); - you need also a PC with optical link to handle the SCL - through a branch controller we power (48 V) and control LV (and ON/FAULT pins) of each card (could be managed by TOF directly but we must check cables, etc.). Communication through an OPC server (or may be TCP-IP/DIM interface to PVSS). To be checked if you can simply connect to our LV system T0 crate: DRM CPDM TRM

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna Guidelines for crates (2) If T0 wants to add other cards to the crate: - Do not put other VME masters inside, don’t use BR lines - Note voltages: 3.3 V only (even on 5 V pins) and +16.2/-13,5 V (normally not available) on +12/-12V pins - You need to use cardlok. No “guides” Don’t interfere with P2 bus (rows A-C strictly defined) and implement ON/FAULT signals - Please note distance of P1 from bottom is not standard + 6Ux9U format (not P3, P1 in the middle) + VME64X connectors

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna Conclusions Working out the TOF readout project, precise specifications now have been elaborated. Unfortunately (essentially for radiation tolerance and magnetic field issues) crates are not so standard as we originally hoped. T0 is welcome to use our readout electronics, but please be aware of specifications to be followed and the need for deployement near T0 electronics. Please be in touch with us, especially consider we don’t have spares for T0 and specific orders must be put in place (funding to be defined)!

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna DDL integration reminder (results already presented at CR4/March 2004) DRM prototype with DDL SIU Bandwidth of MB/s with fixed packet size of 2 – 5 kB DATE Version 4.7, Readout Version 4.6 Event rate up to 330 Hz No errors over 60 M events

10/12/2004 T0/V0 meetingP. Antonioli / INFN-Bologna TTC integration reminder TTCrm mounted on DRM prototype Trigger distribution to HPTDC cards TTCviTTCex HPTDC cards Tested decoding of L1/L2 messages Tested LTU (received at October) No problem foreseen