The Schwan Regional Amateur Sports Center Results of Bids and Recommendation to Award Contracts for Construction February 10, 2015 City Council Meeting.

Slides:



Advertisements
Similar presentations
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Advertisements

EUR 147,000 2 nd floor of 6 story building, 90 M2 3 room apartment on Mill Street 31, Riga, Center 3 bedroom apartment in the quiet Riga center. Autonomous.
Construction Update September 2014 Madison Elementary School District.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Amateur Sports Development at Bojangles Coliseum & Ovens Auditorium June 5, 2014 Economic Development & Global Competitiveness Committee.
Joint School District of Beloit Beloit City Council Meeting Monday, February 24, 2014.
Mission Plan, build and successfully operate a municipal liquor store that reflects the character and progressiveness of Marshall & the Southwest Minnesota.
Planning & Community Development Department Maranatha High School Master Plan City Council Meeting December 15, 2014.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
COUNCIL WORKSESSION DECEMBER 11, AGENDA a.PROJECT SUMMARY RECAP. a.SCOPE. b.BUDGET. b.FINANCING UPDATE. a..5% GENERAL SALES & USE TAX. b.1.5% LODGING,
Cornville Community Park Conceptual Design Recreation Area and Facility Design Class April 9, 2008.
SCIENCE COMPLEX Infrastructure Committee Presentation November 4, 2009.
Fences, Walls and Drinking Establishments City Council Public Meeting July 7, 2015.
Change Orders. Build the project that was bid and awarded.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
For Your Comfort Private Suites. Arena Riga The multifunctional sports and recreation venue "Arena Riga" is one of the largest and most significant construction.
C APITAL I MPROVEMENT PROGRAM FY 2015/16 – FY 2020/21 August 14, 2014.
Palm Coast’s Municipal Fiber-Optic Network: Project Update.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Sales and Operations Overview. Sales and Marketing Agreement Pre-Opening agreement signed in 2006 Provides commission only payment to Global Entertainment.
Crawford W. Long Middle School Atlanta New Construction/Additions Award Type Perkins+Will 2008 Exhibition of School Planning and Architecture.
City of New Brighton Planning Commission Meeting October 18, 2005 Agenda Item: 6A (Public Hearing) Special Use Permit for Detached Garage Exceeding 624.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Pinole Valley High School (PVHS) Project Status
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
Project History and Background. Senate Bill Directed UDOT to Implement Traffic Traffic Signal Coordination Systems Established a Traffic Signal.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
1 Management Report on Bradley West Project BOAC Meeting October 5, 2009.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
15 April 2010 Georgian Heights Alternative Elementary School New Building and Site Plan.
Self-Directed Energy Contracting Saving Your Buildings and Your Money.
TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4,
David M. Maroney, AIA/NCARB. 2 BuildingAddition RoadCourse.
Reserve Items are Classified as Items that are : The Association’s Responsibility Have a Limited Useful Life Have a Remaining Expected Useful Life Have.
Reserve Items are Classified as Items that are : The Association’s Responsibility Have a Limited Useful Life Have a Remaining Expected Useful Life Have.
Allowances, Unit Prices, and Alternates ACT
Update Presentation January 12, 2015 Town of Concord School Bus Transportation and Maintenance Center Town Project Team: Christopher Whelan – Town Manager.
Overview for Local Energy Committees February 10, 2016.
TOMMY OLIVER STADIUM John Bozarth February 23, 2016.
Downtown District Zone Permitted Use Table And Nonconforming Uses.
Hillsborough Building & Planning. Green Building 101  Efficiency of buildings and responsible use of water, and construction materials  Reducing building.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Will Rogers Memorial Center Multi-Purpose Building & Public Events Infrastructure Maintenance City Council Presentation January 26, 2010.
Avondale City Center & American Sports Centers Amendment No. 2 Sports Facility Construction City Council January 4, 2010.
EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project – Update Debbie Hoffman, PE Civil Engineer II March 23,
Department of Public Works FY Capital Improvement Program (CIP) Budget Adoption & Amendments to FY 16 CIP May 16, 2016.
Planning & Community Development Department Rose Bowl Aquatic Center Master Plan 360 North Arroyo Boulevard Predevelopment Plan Review PPR City.
Data Center Stabilization
White Pigeon Community Schools
July 11, 2017.
Stockton Event Center Audit Recommendations and City Response
Addition of Fire Alarm system. None existing.
Robinson Park Recreation Center Renovation
Fall 2017 Update: Physical properties and sinking fund
Sausalito Downtown Public Restroom
CHANNEL DISTRICT ACTION TEAM
Civic Center Sports Field Study Session & Quarterly Update
Progress Report 11/10/11.
2007 Bond Issue Capital Improvement Program
Thermal Impact of Different Interior Finishing Materials on Energy Consumption YOGESH JATAV
Building & Property Committee
San Diego Housing Commission Final Bond Authorization for West Park
Project S.O.A.R December 10, 2018 Meeting
Recent Bond Accomplishments
Columbia High School Exterior Lighting Upgrade
FY19-28 Capital Improvement Program Request
Presentation transcript:

The Schwan Regional Amateur Sports Center Results of Bids and Recommendation to Award Contracts for Construction February 10, 2015 City Council Meeting Construction Document Phase City Council Project Approval Authorization to Bid Oct 28, 2014

2 Met with the Planning Committee and Sports Commission 1/27/15: Reviewed Alt. Bids Discussed $ avail. Provided recommendations for consideration.

3 A1 Ballpark maintenance storage room addition (+1,200 SF). THE SCHWAN REGIONAL AMATEUR SPORTS CENTER ARENA “ADD” ALTERNATES – Additional Funding ($277,000) C1 Waterline to hotel/restaurant sites (will allow itemizing for billing/special assessment – paid for up front by utility funds).

4 A3 GCMU wall finish at public areas in lieu of painted CMU. A7 End bleachers at rink 1. THE SCHWAN REGIONAL AMATEUR SPORTS CENTER ARENA “ADD” ALTERNATES – Added Value ($115,000) R2 subsurface heating system equipment at Rink 1 (Rough in only base bid). E1 video raceway and cabling at goals. E2 Sound system speakers at Rink 1 end seating.

5 THE SCHWAN REGIONAL AMATEUR SPORTS CENTER ARENA “ADD” ALTERNATES – Additional Fundraising ($150,000) A4 PCT wall finish at CMU walls at toilet rooms. (1/2 scope) A6a.1 Thin brick (red only) face brick in lieu of exposed aggregated integrated color precast finish. West portion of building. LS1 – Integral colored/stamped concrete (stamp provided by owner). E3 - LED lighting at interior of arena building (LED lighting base bid for parking lot lighting) ARENA “ADD” ALTERNATES – Energy Rebate availability ($228,000)

THE SCHWAN REGIONAL AMATEUR SPORTS CENTER ALTERNATE BIDS: A1 R2 A7 A4 A6a.1 A3 6 A6a.1 E3

SOUTHWEST MINNESOTA REGIONAL AMATEUR SPORTS CENTER Exterior BASE BID:

SOUTHWEST MINNESOTA REGIONAL AMATEUR SPORTS CENTER ALTERNATE BIDS – A6a.1:

THE SCHWAN REGIONAL AMATEUR SPORTS CENTER ALTERNATE BIDS A6a.1 9 E3 A4 A5 A3 E2 E1 E3 E1 A1 A6a.1

10 THE SCHWAN REGIONAL AMATEUR SPORTS CENTER ARENA Site Plan LS1 C1 C1

11 THE SCHWAN REGIONAL AMATEUR SPORTS CENTER QUESTIONS AND CONSIDERATION OF AWARD