LAV tests at CERN Francesco Gonnella TDAQ Commissioning 16 April 2014 1 Francesco Gonnella - Laboratori Nazionali di Frascati.

Slides:



Advertisements
Similar presentations
CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 POWER DISTRIBUTION.
Advertisements

Gossets student-t model What happens to quantitative samples when n is small?
SOLID GEOMETRY. (d) Projections of Right & Regular Solids like; (Prisms, Pyramids, Cylinder and Cone) SOLID GEOMETRY Following topics will be covered.
Concepts and Vocabulary
U3A1 Windows 7 Professional “ XP Mode ”. U3A2 Microsoft promotional text for XP Mode “Seamless applications Publish and launch applications installed.
LAV front-end board test
LAV front-end board test Francesco Gonnella, Mauro Raggi Photo Veto Working Group 1 April Francesco Gonnella - Laboratori Nazionali di Frascati.
LAV trigger primitives Francesco Gonnella Photon-Veto Working Group CERN – 09/12/2014.
Status of the LAV electronics G. Corradi, C. Paglia, D. Tagnani F. Gonnella, M. Raggi INFN LNF F. Gonnella, M. Raggi INFN LNF Photon Veto WG CERN 13/12/2011.
LAV firmware status Francesco Gonnella Mauro Raggi 10 th October 2012 TDAQ Working Group Meeting.
Beam Position Monitors MICE CM Harbin January, 2009.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
LAV firmware status Francesco Gonnella Mauro Raggi 23 rd May 2012 TDAQ Working Group Meeting.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Cabling and connectors for future LAV stations Mauro Raggi LAV working group CERN 26/10/2009.
Inter TEL62 communication M. Raggi, M. Piccini, F. Gonnella 16 th October 2013 TDAQ Working Group Meeting.
Status of the digital readout electronics Mauro Raggi and F. Gonnella LNF Photon Veto WG CERN 13/12/2011.
4x + 2y = 18 a. (1,8) = 18 a. 4(1) + 2(8) = 18 b. (3,3)20 = 18 b. 4(3) + 2(3) = = = 18 15x + 5y = 5 a. (-2,7) NoYes b. (-1,4) a.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
Overview, remarks, lamentations, hope and despair M. Sozzi TDAQ WG meeting CERN - 4 June 2013 Introduction, news and appetizer.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
Matthew Moulson for the LAV Working Group NA62 Photon Veto Working Group Meeting CERN, 09 June 2015 LAV preparations for restart.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
LAV firmware status Francesco Gonnella Mauro Raggi 28 th March 2012 TDAQ Working Group Meeting.
LAV thresholds requirements Paolo Valente. LAV answers for Valeri’s questions (old) 1.List of hardware to control (HV, LV, crates, temperatures, pressure,
L1Calo Installation Status Murrough Landon, QMUL Level-1 Calorimeter Trigger (University of Birmingham, University of Heidelberg, University of Mainz,
Mu2e NA62 TEL62 & TDCB repairs Radiation effects in TEL62 Franco Spinella 16/12/2015.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
TELL1 readout in RICH test: status report Gianluca Lamanna on behalf of TDAQ Pisa Group (B.Angelucci, C.Avanzini, G.Collazuol, S.Galeotti, G.L., G.Magazzu’,
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
LAV L0 trigger primitives Mauro Raggi, Francesco Gonnella TDAQ Working Group.
Many LAV stations in digital trigger Francesco Gonnella Photon-Veto Working Group CERN – 03/02/2015.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
LAV electronics status report Mauro Raggi and Francesco Gonnella TDAQ meeting NA62 Collboration Meeting 1-5 September 2014 Ferrara.
Short news on the FATALIC project Wednesday Tile Upgrade meeting 2016 May 4 Roméo Bonnefoy and François Vazeille  Communication Main Board-Daughter Board.
Status of the Muon detector Alessandro Cardini CERN & INFN Cagliari Thanks do Davide, Rafael, Maurizio, Oleg, for part of the material included here.
LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Vaqtec feedthoughs with PEEK base 2 Air side Vacuum side 3 prototypes.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
V.Duk, INFN Perugia1 CHOD TDAQ status and rates Viacheslav Duk, INFN Perugia On behalf of the CHOD working group.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
LAV front-end and readout status
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
DCH FEE 28 chs DCH prototype FEE &
TDCB status Jacopo Pinzino, Stefano Venditti
Francesco Gonnella NA62 Collaboration meeting Washington DC, U.S.A.
Presentation transcript:

LAV tests at CERN Francesco Gonnella TDAQ Commissioning 16 April Francesco Gonnella - Laboratori Nazionali di Frascati

Status of LAV stations 16 April 2014Francesco Gonnella - Laboratori Nazionali di Frascati2 LAV updated situation LAV stationHVCratePSRasPi FEE Boards FEE firmware Signal cable CAN chain cables CAN terminatorDongleTDCMech.TEL 62TEL62 fwTDCBs A1 okyes yes noyes old ok ,1,2 A2 okyes yes old ok ,1,2 A3 okyes yes old ? ,3 A4 okyes yes noyes new ? ,1,2 A5 okyes yes noyes no A6 offlineyesnoyes yes ECN3 no nose supportno A7 offlineyesno yes ECN3no ECN3 no nose supportno A8 offlineyesno yes ECN3no ECN3 no nose supportno A9 storage room ?? no storage roomno A10 storage room ?? no storage roomno A11 Frascati ?? no storage roomno A12 Frascati ?? no??no

LAV detector Reparation 16 April 2014Francesco Gonnella - Laboratori Nazionali di Frascati3 LAV1 Signal channels not working: L1ch27, HV problem LAV2 L4ch21, L4ch23, draw few current, but no signal no ground reference L4ch22, short circuit at 100V, HV cable is OK, on the flange 3.4 Mohm LAV3 L0ch4, ZERO HV current LAV4 L2ch4, ZERO HV current, no signal LAV5 All channels appear to speak too much... L1ch7 no signal, HV OK L2ch14, HV card tripped, let's change it L4ch2, ZERO HV current L4ch9, HV recheck, speaks too few.... LAV6 All OK LAV7 All OK LAV8 L1ch15, no signal L1ch4 tripped, to check with or without HV cable, etc. BANS 4-7 of layer1, recheck! From ch0 to ch7 HV tripped??? Fixed HV Board Changed HV Cable Fixed HV Cable Fixed HV Cable Fixed

LAV readout  Only LAV1 and LAV2 are currently equipped with working TEL62s (old) and TDCBs  LAV3 TEL62 has a faulty DDR and a faulty TDCB connector, unfortunately not on the same slot…  LAV4 is equipped with a new TEL62 and 3 TDCBs v7, I hope to make it run in the next days (with help from Ppisa)  Noisy channels and dead channels on LAV1 and LAV2 were fixed. Problems were due to:  TDC cables (extremely fragile connection to TDCBs) 2 replaced  Signal cables 1 was replaced  Waiting for a detailed analysis of data taken last night 16 April 2014Francesco Gonnella - Laboratori Nazionali di Frascati4

“Let there be light” (again) 16 April 2014Francesco Gonnella - Laboratori Nazionali di Frascati5 LAV1 LAV2 LAV3

Last-night data: occupancy 16 April 2014Francesco Gonnella - Laboratori Nazionali di Frascati6

Last-night data: time over threshold 16 April 2014Francesco Gonnella - Laboratori Nazionali di Frascati7 TDC unit = 98 ps LAV1LAV2

16 April 2014Francesco Gonnella - Laboratori Nazionali di Frascati8 TDC unit = 98 ps

Time difference between L and H 16 April 2014Francesco Gonnella - Laboratori Nazionali di Frascati9 TDC unit = 98 ps

Last-night data: Block-Block correlation 16 April 2014Francesco Gonnella - Laboratori Nazionali di Frascati10

Thanks  Thanks to Tania and Vincenzo for their excellent job  Thanks to Roberto Piandani for spending these last two weeks on Skype with me 16 April 2014Francesco Gonnella - Laboratori Nazionali di Frascati11

Thank you for your attention 16 April