Alignment and Maturity are Siblings in Architecture Assessment

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Business Alignment Using Enterprise Architecture
Requirements Engineering Processes – 2
Chapter 5 Transfer of Training
Slide 1 Insert your own content. Slide 2 Insert your own content.
September, 2005What IHE Delivers 1 Joe Auriemma Siemens Medical Solutions, Health Services Senior Director, Integration Engineering Siemens Medical Solutions.
1 of 18 Information Dissemination Products and performance IMARK Investing in Information for Development Information Dissemination Products and Performance.
1 of 21 Information Strategy Developing an Information Strategy © FAO 2005 IMARK Investing in Information for Development Information Strategy Developing.
1 of 15 Information Access Internal Information © FAO 2005 IMARK Investing in Information for Development Information Access Internal Information.
Combining Like Terms. Only combine terms that are exactly the same!! Whats the same mean? –If numbers have a variable, then you can combine only ones.
Confidential and Proprietary XBRL in Santander Group Munich, May 10th 2007 Confidential and Proprietary.
SOA for EGovernment 1 Emergency Services Enterprise Framework: A Service-Oriented Approach Sukumar Dwarkanath COMCARE Michael Daconta Oberon Associates.
1 Software development WP6. 2 Team CEFAS: architecture and documentation IC: modules for calculating new functions (penalty prob.; enforcement cost) AZTI:
Copyright © 2012 California Department of Education, Child Development Division with WestEd Center for Child & Family Studies, Desired Results T&TA Project.
1 © Development Dimensions Intl, Inc., MMV. All rights reserved. 1 Succession Planning Overview STATE ACTION FOR EDUCATION LEADERSHIP PROJECT Follow-up.
0 - 0.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Quality Assuring the Scottish Baccalaureate Inter-disciplinary Project Matthew McCullagh Quality Manager.
SVQs Business and Administration Launch Events January/February 2011.
Modern Systems Analyst and as a Project Manager
Copyright The Info-Tech Research Group Inc. All Rights Reserved. D1-1 by James M. Dutcher Strategic IT Planning & Governance Creation H I G H.
A Comparative Survey of Enterprise Architecture Frameworks
Effective assessment for the degree in social work SWAP with JUC-SWEC Care Council for Wales Scottish Social Services Council Northern Ireland Social Care.
© 2009 IBM Corporation iEA16 Defining and Aligning Requirements using System Architect and DOORs Paul W. Johnson CEO / President Pragmatica Innovations.
Show Order 2 Shows 8:00 – 10:30 Weigh in 11:00 Ewes – by Weight Champion Ewe Market Classes (Hamp) Champion Drive 1:00 – 2:30 Weigh in 2 nd show (approximate.
June 28, Performance Management Overview. Performance Management Agenda Objectives Current and future environment What weve done to create future.
Presenter: Beresford Riley, Government of
Transforming IT Management
Centre Consulting Experts in Enterprise Performance Management Toshiba Medical Systems roadmap to optimized Performance Management –
Enterprise Information Technology Strategic Plan Nevada County 2006 Update.
Business Unit or Product Name © 2007 IBM Corporation Almaden Research Center IBM Service Science Research Services-- The Next Major Frontier for Research.
Build to kick kick to win. Shooting skills 2 Outline Shooting mechanism System description Actuator design Lob shots Identification Calibration Towards.
IEEE/FIPA WG Mobile Agents Ulrich Pinsdorf Fraunhofer-Institute IGD, Germany Dept. Security Technology
Stronger health systems. Greater health impact. Proximal, Distal and Everything In Between: Measuring Organizational Capacity Presenter: Stephanie Calves,
YES New Mexico Enterprise Eligibility System
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
Component-Based Software Engineering Main issues: assemble systems out of (reusable) components compatibility of components.
[Presentation Title] Process Improvement Findings and Recommendations.
Take from Ten First Subtraction Strategy -9 Click on a number below to go directly to that type of subtraction problems
Fitness Improvement Training Program (FIT-P) Targeting
How to commence the IT Modernization Process?
The use of the CEFR at national level in the member states of the Council of Europe Waldek Martyniuk José Noijons Language Policy Forum 2007.
Xsede eXtreme Science and Engineering Discovery Environment Ron Perrott University of Oxford 1.
Software Maintenance Main issues: why maintenance is such an issue
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Science as a Process Chapter 1 Section 2.
Mathematics SL Internal Assessment: Type II. Portfolio Type I: Investigation (done last year) Type II: Modeling.
Online Rubric Assessment Tool for Marine Engineering Course
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session # 14.
Network Security Workshop Dhaka, Bangladesh 09 – 11 November 2013 Proudly Supported by:
Addition 1’s to 20.
Test B, 100 Subtraction Facts
Huseyin Ergin and Eugene Syriani University of Alabama Software Modeling Lab Software Engineering Group Department of Computer Science College of Engineering.
Commodity Trading Software
Week 1.
Chapter 12 Analyzing Semistructured Decision Support Systems Systems Analysis and Design Kendall and Kendall Fifth Edition.
Database Administration
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
05/19/04 1 A Lessons Learned Process Celebrate the Successes Learn From the Woes Natalie Scott, PMP Sr. Project Manager.
People Management, People Organization Main issues:  People are key in software development  Different ways to organize SD projects.
User Interface Design Main issues: What is the user interface How to design a user interface.
From Model-based to Model-driven Design of User Interfaces.
1 IT Governance Presentation to DCO’s Forum 8 June 2005.
UNCLASSIFIED 1 Enterprise Architecture Career Path Working Group Walt Okon Senior Architect Engineer Architecture & Infrastructure Directorate Office of.
1 Sobah Abbas Petersen Adjunct Associate Professor TDT4252 Modelling of Information Systems Advanced Course TDT4252, Spring 2013 Lecture.
Application Systems Health Assessment Summary
703: Coaching for Performance Improvement
Presentation transcript:

Alignment and Maturity are Siblings in Architecture Assessment Bas van der Raadt (Capgemini) Johan F. Hoorn (VU) Hans van Vliet (VU) CAiSE 2005 - Wed. June 15 - Session 2A - 14:00 to 14:30

Introduction Enterprise Architecture (EA) to structure and improve complex situations Practical problems with EA, e.g.: Getting organizational acceptance Finding proper resources (human and other) Etc. Desire to identify these problems through an architecture assessment Create roadmap for improvement

Agenda Introduction to Alignment and Maturity Existing architecture assessment models Multi-dimensional architecture assessment (MAAM) Visualization of MAAM tool Example of assessment questionnaire Assessment process Summary & conclusions

Alignment and Maturity Architecture alignment is the fit between: business and IT strategy organizational and IT processes and structures Architecture maturity is the ability to organization-wide manage the development, implementation and maintenance of architectures on various levels: Business Information Information Systems Infrastructure

Existing models Luftman’s alignment assessment: Based on 6 variables: communications, competency/value, governance, partnership, skills, and scope & architecture 5 alignment levels Per variable 6 or 7 questions to determine level Gartner and METAGroup maturity models: Same structure as Luftman’s model Comparable variables: process, governance, communication, technology, business IT linkage (alignment) 5 maturity levels Comparable questions to determine maturity levels

Existing models See either Alignment as explaining variable for Maturity, or vice versa Allow one-dimensional assessments Does not give sufficient insight E.g. Human health assessment via Body Mass Index requires two dimensions (Height and weight) Assign an organization an alignment or maturity level Reaching the next level could become a goal

MAAM Two-dimensional (Alignment & Maturity) Alignment en Maturity equally important variables 6 explaining sub-variables: Architecture development process Architecture governance Organizational support Communication via and about architecture Architecture scope Human and other resources

MAAM

MAAM tool (visualization) Business management Architecture alignment IT department Architecture maturity

MAAM tool (questionnaire)

Assessment process Gather data within different domains using the questionnaire Cluster individual questionnaires and identify groups and their differences Discuss these differences and their causes with involved management and architects Identify solutions for getting ‘on the right track’

Summary and conclusions MAAM Multi-dimensional (Alignment & Maturity) Allows a more complete architecture assessment that identifies the ‘direction’ in which an organization moves Based on existing models and improved by new theories from preliminary work (ICSE2004)

References Polyphony in Architecture, Proceedings 26th International Conference on Software Engineering (ICSE2004), IEEE, pp 533-542 Alignment and Maturity are Siblings in Architecture Assessment. Proceedings 17th Conference on Advanced Information Systems Engineering (CAiSE'05), Springer-Verlag, pp 357-371