Managing a Successful Mechanical System project Following design – what next?

Slides:



Advertisements
Similar presentations
USDA - RURAL DEVELOPMENT
Advertisements

Construction Contracting
Roles & Responsibilities in Construction Management
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Quality Assurance U. S. ITER Project Office U.S. ITER Project 1 November 15, 2006 U. S. ITER QUALITY ASSURANCE Gail Okulczyk, Presenter U. S. ITER Quality.
Procurement Management
Public Sector Project Management Public Sector Forum Fall 2005 Panel Discussion: Opening & Closing Projects in the Public Sector Public Works and Government.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Marcy Mealy Procurement Specialist CDBG Program
CE-332 CONSTRUCTION ENGINEERING AND MANAGEMENT
Project Procurement Management
Building Commissioning
Project Close Out CTC-470.
ESTIMATING By Laith Jacob.
November 3, 2002CVEN349 - Maxwell1 Procurement and Materials Management Module 6.2 November 3, 2002.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Building a Better Bid The Nuts & Bolts Dave Leonard The World Bank.
1.0 INTRODUCTION Seán Moran. SIMPLE? Commissioning is a complex issue requiring: Planning Leadership Teamwork Training Communications.
Construction Administration & Project Acceptance Welcome Scott Kirchner, Altus Architectural Studio Jon Hilton, Farris Engineering Jason Studt, JE Dunn.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed.
Mechanical Integrity Quality Assurance. Lesson Objectives  Describe How to Ensure Controls in Place for QA  Describe Standard Record for Inspection.
Construction Contracts and Project Delivery Methods
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
CVE 4070 Construction Engineering Shop Drawings Quality Control
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
Project Procurement Management. Procurement Basics Project Procurement Management.
Agency Construction Management :CM NOT AT-RISK
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Chapter 11: Project Procurement Management
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
CVE 4070 Construction Engineering Project Closeout & Pyramid Solution
CVE 4070 Construction Engineering Course Review Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
the Basic Commissioning (Cx) Process
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
Engineering a Good Project Drew Seaman. Engineering: the work of designing and creating large structures (such as roads and bridges) or new products or.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
1 JCI 1 1 An engineer is someone who can do for $5,000 what any damn fool can do for $50,000. Anonymous.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
US Army Corps of Engineers BUILDING STRONG ® Building and Preserving Alaska’s Future Alaska District Design-Build Contracts Moolin Seminar November.
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
OVERVIEW History of commissioning at WMU What we wanted to accomplish
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Enterprise Content Management Owners Representative Contract Approval
ChE 473K Plant Design R. Bruce Eldridge.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Quality Management Systems – Requirements
Designers’ Manual Overview and Chapter Contents
Designers’ Manual Appendix Contents
Administrator of Construction Todd Wilson Senior Project Manager
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Quality Assurance for Emulsified Asphalt Surface Treatments
Directed Change Constructive Change
Award of Contract M06013C04 Project Management Information System (PMIS) Licensing, Maintenance and Service Agreement Commission Agenda Item #13.
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

Managing a Successful Mechanical System project Following design – what next?

Construction Procurement Deciding which procurement strategy is best Deciding which procurement strategy is best Lowest price or greatest value?Lowest price or greatest value? Reviewing the bids/proposals Reviewing the bids/proposals Selecting the best contractor for the project Selecting the best contractor for the project

Other decisions early in the project How much inspection is required and who is the best qualified to perform the inspections How much inspection is required and who is the best qualified to perform the inspections Who should review the material/shop drawing submittals Who should review the material/shop drawing submittals Is commissioning required and who should do the commissioning? Is commissioning required and who should do the commissioning?

How much inspection is required and who is the best qualified to perform the inspections Can this be done in-house? Can this be done in-house? Should the design engineer be involved in the construction inspections Should the design engineer be involved in the construction inspections Should this work be done by an independent construction management firm Should this work be done by an independent construction management firm

Who should review the material/shop drawing submittals Should the design engineer review the submittals? Should the design engineer review the submittals? Should the construction manager review the submittals? Should the construction manager review the submittals?

Is commissioning required and who should do the commissioning? Based on the complexity of the mechanical system, a decision needs to be made as to how much commissioning is required and who should do commissioning Based on the complexity of the mechanical system, a decision needs to be made as to how much commissioning is required and who should do commissioning A/E commissioning A/E commissioning Construction manager commissioning Construction manager commissioning Construction contractor commissioning Construction contractor commissioning

A/E commissioning Advantage of having someone familiar with the design doing the commissioning Advantage of having someone familiar with the design doing the commissioning Advantage of having someone that can make adjustments to the design if corrections are necessary Advantage of having someone that can make adjustments to the design if corrections are necessary One party to depend on for system operation One party to depend on for system operation

Construction manager commissioning Independent review of the system Independent review of the system Can determine if operational problems are related to design or construction Can determine if operational problems are related to design or construction Needs to be able to work with the design engineer if problems are found Needs to be able to work with the design engineer if problems are found

Construction contractor commissioning Small project Small project Projects that are not too complex Projects that are not too complex

Progress of work Submittal and shop drawing reviews are early in the project Submittal and shop drawing reviews are early in the project Responding to Requests For Information (RFIs) is ongoing throughout the entire project Responding to Requests For Information (RFIs) is ongoing throughout the entire project Construction inspection throughout the project Construction inspection throughout the project Commissioning – also throughout the project Commissioning – also throughout the project

Pre-close in inspection Anything that will be concealed by finished construction needs to be inspected prior to installation of the finishes Anything that will be concealed by finished construction needs to be inspected prior to installation of the finishes Pressure testing of ductwork Pressure testing of ductwork Pressure testing of mechanical piping systems Pressure testing of mechanical piping systems Inspection of insulation Inspection of insulation

Final inspection Final inspection by someone other than the person charged with the day to day administration/inspection of the construction work Final inspection by someone other than the person charged with the day to day administration/inspection of the construction work Correction of final inspection defects and omissions Correction of final inspection defects and omissions

Final Commissioning Verification of all operational features of equipment Verification of all operational features of equipment Verification that everything is installed in accordance with the contract Verification that everything is installed in accordance with the contract Verification that everything is operating as per the design Verification that everything is operating as per the design Verification that all conditions in the original scope are met with the construction Verification that all conditions in the original scope are met with the construction

Closeout documentation Operation and Maintenance manuals Operation and Maintenance manuals Training on the equipment Training on the equipment Warranty information Warranty information As-built drawings As-built drawings Testing records and commissioning results Testing records and commissioning results