AMORE - AliRoot Detectorv4-18-Rev12 ACORDE EMCal FMD HMPID MCH MTR PHOS PMD SDD SPD SSD T00 TOF TPC TRD V00 ZDC v4-18-Rev13v4-18-Rev14v4-18-Rev15v4-18-Rev16.

Slides:



Advertisements
Similar presentations
Photons and Jets from the first year of ALICE A
Advertisements

David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 The TRD Ethernet network at Point 2 David Emschermann Physikalisches Institut Universität Heidelberg.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
Progress on ACORDE (ALICE Cosmic ray detector) Ildefonso León for ACORDE-ALICE group.
THE ALICE EXPERIMENT AT CERN LHC: STATUS AND FIRST RESULTS Ermanno Vercellin Università and INFN Torino, Italy On behalf of the ALICE collaboration Outline.
LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität.
Technical Question Technical Question
F Antinori - 417th WE-Heraeus-Seminar - Bad Honnef - June Heavy Flavour in ALICE Federico Antinori (INFN Padova & CERN) for the ALICE Collaboration.
LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
New CERN CAF facility: parameters, usage statistics, user support Marco MEONI Jan Fiete GROSSE-OETRINGHAUS CERN - Offline Week –
First Physics at the LHC ALICE Bjørn S. Nilsen Creighton University.
First Physics at the LHC ALICE Bjørn S. Nilsen Creighton University.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
FF - August 30th 2004 Meeting ALICE radiation tolerance. Some reasons for this meeting: A part very inner detectors (Pixels and SDD), ALICE has wide grey.
12/12/2010 LHC First Data 2010 – Ann Arbor, USA J.L. Klay 1 A first glimpse down the rabbit hole: status of ALICE after one year Jennifer Klay California.
1 LV Power Supplies L.Jirden* u Detector solutions u Contracts u Tests u Outstanding issues *Presented by André Augustinus.
DCS - general Unscheduled power cut Wed. morning ( , human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.
1 Low Voltage Power Supplies for ALICE ALICE week June 04 L.Jirden u Detector requirements u Target Devices u Procurement u Actions.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
1 CTP offline software status (Offline week) A.Jusko and R.Lietava.
V4-20-Release P. Hristov 08/08/ Changes: v4-20-Rev-38 #85151 Memory leak in T0 DQM agent. From rev #85276 AliGRPPreprocessor.cxx: Port to.
Offline report – 7TeV data taking period (Mar.30 – Apr.6) ALICE SRC April 6, 2010.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
1 ITS Quality Assurance (& DQM) P. Cerello, P. Christakoglou, W. Ferrarese, M. Nicassio, M. Siciliano ALICE OFFLINE WEEK – April 2008.
The ALICE Experiment at the CERN LHC P. Kuijer for the Alice collaboration ICHEP 2002.
André Augustinus 9 October 2006 Interlocks update.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
Early physics at ALICE Francesco Prino (INFN – Sezione di Torino) for the ALICE COLLABORATION XXIV Recontres de Physique de La Vallée d'Aoste, La Thuile,
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
Filippo Costa ALICE DAQ ALICE DAQ future detector readout October 29, 2012 CERN.
MC and data discrepancy in TOF Indranil Das. Reported problem See detail in link : Presentation.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
Summary of Workshop on Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Computing Day February 28 th 2005.
TC meeting P2 planning wks 5&6 A.Tauro
V5-01-Release & v5-02-Release Peter Hristov 20/02/2012.
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
V4-20-Release P. Hristov 21/02/ Changes: v4-20-Rev-14 #78385 Please port AliTPCPreprocessor.cxx Rev to Release #78344 Request to port changes.
V5-02-Release Peter Hristov 23/04/ Changes: v5-01-Rev-32 #93585 Request of porting in the release (AliTOFTrigger). From rev ,55583,55694.
Physics whit ACORDE (ALICE Cosmic ray detector) Arturo Fernández for ACORDE-ALICE group.
TC meeting P2 planning wks 3&4 A.Tauro
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
V4-19-Release P. Hristov 11/10/ Not ready (27/09/10) #73618 Problems in the minimum bias PbPb MC production at 2.76 TeV #72642 EMCAL: Modifications.
DIS 2011, Newport News, April 2011Joakim Nystrand, University of Bergen 1 Small-x and forward measurements in ALICE Joakim Nystrand University of.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
AliRoot status Peter Hristov 25/06/2012.
P. Kuijer1 System run coordinator meeting
(Alice COsmic Ray Detector) Status Report
V4-18-Release P. Hristov 21/06/2010.
Calibration: preparation for pa
F. Bellini for the DQM core DQM meeting, 04th October 2012
DCS Status and Amanda News
TS2 preparatory meeting
ALICE Status Report to LHCC September 2008
CPass0/CPass1 on LHC12d/c Updated at 08:45 on 02/08
Production status – christmas processing
ALICE Status 4th CERN-Korea meeting
v4-19-Release & v4-20-Release
v4-18-Release: really the last revision!
IEEE NPSS Real Time Conference 2009
Shutdown conclusion, LS1 and LS2 planning - A.Tauro
Experience between AMORE/Offline and sub-systems
V5-02-Release Peter Hristov 21/05/2012.
Corr framework Computing in High Energy and Nuclear Physics
Quarkonium production in p-p and A-A collisions: ALICE status report
Pixel sensor for ALICE ITS upgrade & CIS
Presentation transcript:

AMORE - AliRoot Detectorv4-18-Rev12 ACORDE EMCal FMD HMPID MCH MTR PHOS PMD SDD SPD SSD T00 TOF TPC TRD V00 ZDC v4-18-Rev13v4-18-Rev14v4-18-Rev15v4-18-Rev16 ? ? ? P2P2 Latest

Issues EMCal: crash when clearing a TPaveText (savannah 67209) SPD: crash in Reset (savannah 67210) MCH: crash with technical runs (savannah 67214) TOF: crash after the first run (savannah 67205, fixed) Checker updated to identify the two last points

Conclusion The situation is not good – Each time a problem is solved a new one arise – We can’t install at P2 as long as it prevents a detector QA to run Problem – Issues can’t be detected before the tag is created Solution – ?