1 Internet Connectivity AG Meeting Frankfurt, 18/19 November 2013.

Slides:



Advertisements
Similar presentations
Why does ERA Need to Flourish
Advertisements

Control Framework Breakfast Group agenda 9:00Arrival, Breakfast & networking 9:20 Welcome & Phase I Update 9:30Direct reporting project update – Sharmi.
1 Introducing the Specifications of the Metro Ethernet Forum.
Interoperability of electronic road toll systems in the EU The European Electronic Toll Service (EETS) Directive 2004/52/EC & Decision 2009/750/EC Charles.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
FORUM ON NEXT GENERATION STANDARDIZATION (Colombo, Sri Lanka, 7-10 April 2009) A Pilot Implementation of an NGN Dual Stack IPv4/IPv6 network for MEWC,
IPC Working Group 28- Update on IT support for the IPC Geneva November 1, 2012 Patrick Fiévet Head of IT Systems Section.
Draft Revision of the Career and Technical Education Standard Course of Study Common Program Area Materials for Review.
Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
ITIL 1 Oklahoma Office of State Finance Information Services Division Instructions: Service Catalog Request.
AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services.
Enterprise and Industry Agenda Item Game Consoles Product Group 'Sound and Audio Equipment' Consultation Forum 9 October 2012 Ecodesign Directive 2009/125/EC.
LEI – Legal Entity Identifier 27 March Why a Legal Entity Identifier ? Driver: –New regulatory framework for swaps (US, Canada, Hong Kong, Australia.
1 4CB Status report T2S Advisory Group 19&20 November 2013.
1 Status update on the CRs T2S Programme Office European Central Bank Advisory Group November 2013 ECB-PUBLIC Item 6.1.
Table of contents 1 Manual of Operational Procedures (MOP) 2
Review of Kent Learning Disability Partnership Board.
0 Set-up for Settlement and Auto-collateralisation in T2S T2S Programme Office European Central Bank AG Meeting Frankfurt, 18/19 November 2013 ECB-PUBLIC.
1. VAN-NSP Project governance In compliance with the Licence Agreement, the Eurosystem (BdI) and the two selected VAN-NSP (SWIFT and SIA-Colt) have designated.
Creating an Early Childhood System Karen Ponder February 9, 2010 Arizona Early Childhood Task Force.
IEC PT TC88 meeting March 2010 Jens Carsten Hansen.
Cooperation Framework for Member States under ESS VIP SIMSTAT ESSnet Workshop, Rome Dec Georges Pongas (slides by Mushtaq Hussain)
DirectAccess Infrastructure Planning and Design Published: October 2009 Updated: November 2011.
Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
Transposition of Consumer Rights ERGEG Monitoring Report Christina Veigl-Guthann, ERGEG Task Force Chair.
TETRA Inter System Interface (ISI)
UIC ERTMS Conference, Istanbul Apr 2014 Evolution of the Railways Communication System Developments on the Succession of GSM-R Piero Petruccioli.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Arizona Department of Education Superintendent John Huppenthal Mark Masterson, CIO Pamela Smith, AELAS Program Director Mark Svorinic, AZ-SLDS Program.
Raffaele Di Fazio Connecting to the Clouds Cloud Brokers and OCCI.
Drinking water and urban waste water treatment development ÖKO Zrt. Evaluation tasks.
CENF target facility civil engineering specifications – summary M. Calviani (EN/STI) for the CENF-SBWG team Neutrino Platform Meeting 30 th October 2014.
Top Issues Facing Information Technology at UAB Sheila M. Sanders UAB Vice President Information Technology February 8, 2007.
ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT.
 Advanced Metering Working Group (AMWG) Update to RMS 1 August 5, 2014.
Being successful? Update from Japan’s Internet IPv6: How ready is Asia for this critical resource? APrIGF, June MAEMURA Akinori (前村 昌紀) JPNIC /
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
RIPE Network Coordination Centre XXIV, October 2009, Dearborn 1 Axel Pawlik Update from the RIPE NCC.
Jackie Voss Manager, Global Standards Development ATIS All-IP Transition Initiatives September 30, 2015.
Guidance for Running Multiple IPv6 Prefixes (draft-liu-v6ops-running-multiple-prefixes-02) Bing Liu, Sheng Jiang (Speaker), Yang Bo IETF91
Digital Libraries1 David Rashty. Digital Libraries2 “A library is an arsenal of liberty” Anonymous.
Partial Private Circuits Kalpesh Brahmbhatt 31 October 02.
PNISG Update June Xoserve’s UKLP Assessment Principles 1.Maintain current delivery plans where possible and appropriate e.g. don’t just push all.
3 rd Party Registration & Account Management JDOA Update To RMS October 28, 2014.
ESDEN - modernisation of data exchange in the ESS
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Meeting Practices Yan Wei Foundation Extreme programming is used Meeting practices are based on extreme programming technology with.
19-20 October 2010 IT Directors’ Group meeting 1 Item 6 of the agenda ISA programme Pascal JACQUES Unit B2 - Methodology/Research Local Informatics Security.
Recommendations for Observing the Horizontal Priority “Information Society” in Selection and Appraisal of Project Applications for EU Funds Viesturs Krievāns.
Deputy Head of Federal Accreditation Service Sergey V. Migin Approximation of accreditation systems of European Union and Russia.
43 RD ASECAP STUDY & INFORMATION DAYS 2015 A Multimodal, Smart and Safe European Transport System: The Key Role of Motorways Epic Sana Hotel May.
© Cloud Security Alliance, 2015 March 2, Agenda © Cloud Security Alliance, 2015 The SecaaS Working Group Recent Activity Charter Category outline/templates.
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
Cloud computing-The Future Technologies
FlorenceForum November 2008
POC Procedures Working Group (POC-PWG) Work package 3 (As Built)
IATI workplan implementation, Y4 ( )
ERTMS: specifications, deployment, financing
Overview of working draft v. 29 January 2018
ESB Networks Market Release Meeting of the IGG, April 16th 2009
Dissemination Working Group (DWG)
Working Group on Rail Transport Statistics:
Project Advance Introduction.
EC-­activities and strategy to reduce rail freight noise
APT – Planning the Next Phase & Resourcing Risk 2 Nov
Analysis of the notification of compensatory measures
Presentation transcript:

1 Internet Connectivity AG Meeting Frankfurt, 18/19 November 2013

2 Status up until September / October 2013:  Access to the T2S GUI (U2A) is not foreseen via the User Requirements  During 2009/2010 it was envisaged to offer the internet service as an “on top” service to the market, due to some synergies with the T2 solution  No specific technical design has been drafted, no budget was foreseen  Internet never intended to replace the use of VAN services  It was positioned as a low cost, low volume solution and communicated as such to the market / published in scope defining documents Internet Connectivity

3 The T2S Board has recommended to the 4CB to consider the implementation of internet at a later stage after the end of the migration period  Focus on the essential elements of T2S going live -At this stage of the project there are multiple higher priority tasks in the development / testing / infrastructure areas of the project -To fully focus on the readiness of the T2S application, testing environments, etc. for the opening of the User Testing and Migration phases  Non-duplication of services already provided by the VANs -Internet is not an alternative to the other networks in the day-by-day operations and not a contingency network of VANs or DL networks -VAN providers are able to provide scalable solution that meet the volumetric needs of their customers -Since Internet-based access to T2S could be part of the (additional) services offered by the VANs, the interested DiCoAs can make an inquiry for the service and conditions Internet Connectivity

4 Next Steps:  Minor Change request -A minor change request would be needed to the UDFS, to specify that the internet connection will be considered at a later stage of the project. The T2S Board would appreciate the support of the market with regards to supporting this change request and enabling focus on the go live of essential elements of T2S  Consideration of internet solution at a later stage -When T2S will be stabilised in operation, the Eurosystem will consider whether (and when) internet could be implemented and under which limits, in accordance with the T2S change management governance Internet Connectivity

5 Thank you for your attention