Forest Carbon Partnership Facility Participants Committee Meeting (FCPF PC3) Montreux, Switzerland June 16-18, 2009 Evolution of FCPF Readiness Plan Concept:

Slides:



Advertisements
Similar presentations
ADDRESSING FOREST GOVERNANCE THROUGH REDD+
Advertisements

Project Cycle Management
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop The MICS4 Process.
Guidance Note on Joint Programming
The UN-REDD Programme 1 st Policy Board Meeting 9-10 March 2009.
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Kosovo Donor Coordination
Forest Carbon Partnership Facility Progress with Due Diligence Activities in Panama Participants Committee Meeting (FCPF PC5) La Lopé National Park, Gabon.
Forest Carbon Partnership Facility Participants Committee Meeting (FCPF PC3) Montreux, Switzerland, June 16-18, 2009 Sources and Uses of Funds in the Readiness.
1 Jonathan Brown UNGASS HLM, New York, June 2008 Progress & Lessons Learned.
Basic Considerations  outlines the process by which the Government of Kenya will develop its national strategy for participating in an evolving international.
THE NATIONAL FOREST PROGRAMME FACILITY
Participatory Governance Assessment for REDD+: The pilot process in Nigeria Oslo Governance Forum 3-5 October, 2011 By Salisu Dahiru National Coordinator.
UN REDD a collaborative programme of UN agencies on Reducing Emissions from Deforestation and Forest Degradation to support developing countries FAO-UNDP-UNEP.
Regional highlights of R-PINs Asia Region FCPF Steering Committee Meeting Paris, July 9 and 10, 2008 By FCPF Technical Advisory Panel Forest Carbon Partnership.
Forest Carbon Partnership Facility FY10 Annual Budget of the Readiness Fund Participants Committee Meeting (FCPF PC3) Montreux, Switzerland, June 16-18,
A. N. Gichu Kenya Forest Service REDD+ and REDD Readiness.
PARIS21 - Meeting of Statistical Capacity Development Donors 27–29 April 2011, Paris, France Pietro Gennari, Statistics Division FAO Developing the Implementation.
IWRM PLAN PREPARED AND APPROVED. CONTENT Writing an IWRM plan The content of a plan Ensuring political and public participation Timeframe Who writes the.
Module 1.1 UNFCCC context and requirements and introduction to IPCC guidelines REDD+ training materials by GOFC-GOLD, Wageningen University, World Bank.
Regional Implementation Plan for the Global Strategy to Improve Agricultural and Rural Statistics in Asia and the Pacific - From global strategy to national.
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points in the Pacific SIDS Auckland, New Zealand, September 2008.
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points in Asia May 2008, Manila.
AF Project Cycle and Approval Process Panama City, Panama Nov, 2011.
Global Action Plan and its implementation in other regions Meeting for Discussion of the draft Plan for the Implementation of the Global Strategy to Improve.
The Global Fund- structure, function and evolution February 18, 2008.
Forest Carbon Partnership Facility Participants Committee Meeting (FCPF PC3) Montreux, Switzerland June 16-18, 2009 Financing Sources for Readiness outside.
1 Overcoming Challenges in Preparation and Implementation of NAMAs Kigali, 17 th August 2015 African Regional Workshop on NAMAs.
World Bank - Forest Carbon Partnership Facility: REDD+ Readiness and Country Needs Alexander Lotsch Forest Carbon Partnership Facility The World Bank
Forest Carbon Partnership Facility FY10 Annual Budget of the Readiness Fund Participants Committee Meeting (FCPF PC3) Montreux, Switzerland, June 16-18,
Project Cycle Management presentation
The Forest Carbon Partnership Facility FCPF Consultations with Indigenous Peoples and Forest Dwellers: Main Messages and Follow up Steering Committee Meeting.
Forest Carbon Partnership Facility 2a. Review of R-PP Template and Presentation of ad hoc Technical Advisory Panels for PC11 R-PPs Eleventh Meeting of.
Forest Carbon Partnership Facility Global Dialogue on Developing a Readiness Preparation Proposal August 13-14, 2009 Structure of the R-PP template Review.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
UN-REDD – QUICK OVERVIEW. The UN-REDD Programme. What it is? Since part of you may not have heard about the UN-REDD Programme, I have thought it could.
Developing Incentives for Reducing Emissions from Deforestation and Degradation (REDD) The Readiness Mechanism Some ideas for your consideration next steps.
Grant Agreement Documents (between Global Fund and Principal Recipient) Workshop for TB Experts Hosted by WHO Stop TB and the Global Fund December 2005.
December_2009 Partnership building. December_2009 Partnership building within the partnering process COREGROUPCOREGROUP FORMAL LAUNCH $ $ $ $ $ cost centre.
Reducing Emissions from Deforestation and Forest Degradation Forest Carbon Partnership Facility Participants Committee Meeting (FCPF PC 2) Gamboa, Panama,
Forest Carbon Partnership Facility (FCPF) Readiness Procedures July 9, 2008.
Reducing Emissions from Deforestation and Forest Degradation Forest Carbon Partnership Facility Participants Committee Meeting (FCPF PC 2) Gamboa, Panama,
Forest Carbon Partnership Facility Overview of the R-Package Kenn Rapp, Facility Management Team Asia-Pacific Indigenous Peoples Dialogue of the FCPF Chiang.
Forest Carbon Partnership Facility Participants Committee Meeting (FCPF PC3) Montreux, Switzerland June 16-18, 2009 Application of World Bank Safeguard.
Geospatial LoB: Lifecycle WG Update November 3, 2009.
Forest Carbon Partnership Facility Participants Committee Meeting (FCPF PC3) Montreux, Switzerland, June 16-18, 2009 Guyana’s REDD Readiness-Plan Technical.
REDD after Copenhagen – The way forward. EARLY LESSONS FROM THE UN-REDD PROGRAMME Mar
Reducing Emissions from Deforestation and Forest Degradation Forest Carbon Partnership Facility Participants Committee Meeting (FCPF PC 2) Gamboa, Panama,
Designing Effective REDD+ Safeguards Information Systems Jessica Boyle IISD With support from the Norwegian Development Agency.
Mid-Decade Assessment of the United Nations 2010 World Population and Housing Census Program Arona L. Pistiner Office of the Associate Director for 2020.
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
MICS Data Processing Workshop Multiple Indicator Cluster Surveys Data Processing Workshop Overview of the MICS Process.
Technical Assistance for Needs Assessments Available From the Climate Technology Initiative Elmer Holt CTI Vice Chair April 24, 2002.
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
Reducing Emissions from Deforestation and Forest Degradation Forest Carbon Partnership Facility Participants Committee Meeting Panama, March 11-13, 2009.
UN-REDD Programme Overview of Progress Twelfth Policy Board meeting Lima, Peru 8-9 July 2014.
Twelfth Policy Board meeting Lima, Peru 8-9 July 2014 Presentation on the REDD+ Academy.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
The UN-REDD Programme: Capacity development for REDD+ readiness through partnerships Yemi Katerere, Head UN-REDD Programme Secretariat Briefing to Missions.
Emergency Resiliency Fund (ERF)
TRI-PARTITE TERMINAL PROJECT REVIEW (TTPR)
Country needs assessment Madagascar: Progress and next steps
Twelfth Policy Board meeting Lima, Peru 8-9 July 2014
Forest Carbon Partnership Facility
UN REDD FAO-UNDP-UNEP July 2008
Indonesia’s Readiness-Plan Technical Advisory Panel Review
Emergency Resiliency Fund (ERF)
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points
Peru Draft R-PP: Initial comments by the TAP
Roles and Responsibilities
Presentation transcript:

Forest Carbon Partnership Facility Participants Committee Meeting (FCPF PC3) Montreux, Switzerland June 16-18, 2009 Evolution of FCPF Readiness Plan Concept: Early Lessons and a Path Forward

Outline of presentation: Issues and lessons from “R-Plan” process Proposal for a path forward. Learning from 3 early-actor R-Plans: FCPF R-Plan template invented to identify information needed. Holistic concept of R-Plan is challenging: Countries newly encouraged to look across sectors, ministries, issues. 3 R-Plan submissions  insights about what countries can provide, and what FCPF needs. FCPF is a Partnership: We are all learning together. Outline and Rationale

1.Countries desire simpler template. 2.Harmonize with UN-REDD. 3.Title “R-Plan” raises expectations that a full plan is ready, when countries really presenting a proposal 4.Shift to planning document that identifies funding priorities and timing –- to enable funding decisions review criteria difficult to operationalize. Are these the right criteria? 6.Terms of Reference not always actionable. 7.Role of the PC, the Bank, and the TAP still evolving. Early Lessons on R-Plan Template

1.Assessment of deforestation drivers not yet adequate to inform REDD strategy choices. Additional studies needed in Readiness phase. 2.Reference scenario, monitoring, REDD Implementation Framework, etc. proposed activities and ToRs still need further elaboration. 3.Countries need funding for studies to advance thinking. 4.Substantial consultations needed with representative stakeholders during writing of the R-Plan. Overly high expectations, given that country’s REDD strategy still needs to be decided. Thus, consultation needs to be phased in, and continuous. 5.Timing and application of World Bank Safeguards not yet clearly understood (discussed later in presentation). Early Lessons on R-Plan Content

5 FCPF Partnership of 37 Countries with Varying Forest & Development Contexts How to define what R-Plan should contain for each?

Thus, assessing first R-Plans is challenging: -Each domestic & international stakeholder group seeks to meet its global expectations for REDD via first country R-Plan. -What does an R-Plan need to accomplish ? Key issue: How much information, consultations, etc. necessary for early preparation for REDD Readiness ?? Implications for Assessment of Early R-Plans How Much Consultation? How Specific REDD Strategy?? R-PIN Current “R-Plan” Achieving Readiness Not Enough Info.? Perfect Information? WHERE TO BE ??

Provision under the Charter: “REDD Country Participant shall, on the basis of the Readiness Plan Idea Note, develop a Readiness Plan and submit it to the FMT for review and approval by the PC.” Implication of the word “approval”: - Giving formal sanction or confirming authoritatively But, the action of “approval” does not accurately reflect experiences of Readiness preparation process. Role of PC in Reviewing R-PP

“Readiness Preparation Proposal” focuses on 4 key building blocks + what is knowable now. Includes request for funding of activities. Full “Readiness Package” details come later, when known. Allows time & funding for consultations & progress on most topics. Harmonizes with UN-REDD as feasible. A Proposal for Moving Ahead: R-Preparation Proposal onto R-Package R- Preparation Proposal Readiness Package: Full description of Readiness

R – Package ; Achieving Readiness R- PIN R- PP ToR & R-PP WORK General REDD STRATEGY Specific REFERENCE SCENARIO NATIONAL MONITORING SYSTEM Framework consultations > ORGANIZE & CONSULT > Broad Proposed: R-Preparation Proposal Leads to Readiness Package

Acknowledges countries not ready to fully describe REDD activities Strives to start funding REDD analytic work to inform country’s REDD strategy development, reference scenario, etc. Readiness Package remains the major product of Readiness process Establishes need for consultations up front: Starts with framework consultations with representative groups of stakeholders, and stakeholder analysis … Then broadens and deepens over time. Advantages of Proposed R-PP

Progress on Harmonization with UN-REDD FCPF & UN-REDD actively working to harmonize, per PC request Goal is to simplify what a country needs to produce Propose 4 key common components: Organize and Consult REDD Strategy Reference Scenario National Monitoring System + Budget & Schedule; Program Monitoring & Evaluation Propose common budget sheets Drafting common Consultation Guidance

12 Proposing Harmonization with UN-REDD UN-REDD NJPD (for Funding and Administration) FCPF Grant Agreement (for Funding and Administration) FCPF –PP for National REDD Activities Organize and Consult REDD Strategy/ Priority Setting REDD Strategy/ Priority Setting Reference Scenario Review by Expert Panel drawn from Common Roster of Experts National Monitoring System

PC discussion in Panama asked: When do WB Safeguards apply, at what stage? How will they be applied, e.g., for consultation? Bank internal discussions suggest: Build on international good practices for consultations, environmental and social safeguards Reviewing how WB Safeguards apply to FCPF stages, suggesting: Development of overarching frameworks first, then More specific Safeguards applied once the REDD strategy and activities become known. Working to Clarify How and When World Bank Safeguards Apply

Discussion by PC If R-PP approach accepted, FMT revises R – PP template for new submissions 3 submitted R-Plans are grandfathered in ? Training and tech assistance Potential Next Steps: 1

Recommendations, in light of this R-PP proposal: 1) Review and assess the 3 existing R-Plans on the basis of the criteria proposed in Program Note (FMT Rev.4 on “Review and Assessment of Readiness Preparation Proposals”; Make recommendations for areas for improvement; Determine whether an R-PP provides a sufficient basis to proceed with a Readiness Preparation Grant (up to US$3.6 million) 2) Consider the applicability of the existing Program Note criteria for any new R-PP proposals. Potential Steps 2: Role of PC in Reviewing R-PP

Propose: R – PP training event: Tentatively July Via Skype and Video Conference from World Bank offices Ask 3 countries with submitted R- Plans to share their experience & process with others FMT and TAP experts walk through major components Record event for later use by FCPF countries? Propose: Regional Workshops? AFRICA, SE ASIA, LATIN AMERICA? August to December, as feasible? Potential Steps 3: Training and Tech Assistance

Coordinate or provide technical assistance, as feasible. Potential examples: REDD strategy development Deforestation and opportunity cost analysis Reference scenario development National Monitoring System design Distributive aspects of REDD National REDD registry Cooperate with international organizations (FAO, UNDP, UNFCCC, CfRN, etc.) Regional collaboration, sharing of experiences in R-Plan formulation Potential Steps 4: Training and Tech Assistance? (2)

Thank you! 18