SUPPLIER VA/VE SUGGESTION FORM ATTN: ___________________________ SUBMITTED DATE: ____________________________ COMPANY: _______________________________________.

Slides:



Advertisements
Similar presentations
Module 10 Submit.
Advertisements

Date: _______________ 1.Name of Applicant: _____________________________________________________________ Project Name: _________________________________________________________________.
June 27, 2005 Preparing your Implementation Plan.
Doc.: IEEE /0006r0 Submission March 2005 Steve Shellhammer, Intel CorporationSlide 1 What is a CA document? Notice: This document has been prepared.
1 RXQ Customer Drop Submitted by Supplier Process Flow Diagram Customer Supplier Distribution Company Supplier sends Drop Request to Distribution.
REQ Enrollment in Demand Response Programs Process Flow Engineering Firm Retail Customer Demand Response Service Provider (DRSP) Distribution Company.
1 RXQ Ad Hoc Historical Usage Using a Registration Agent Process Flow Supplier Registration Agent Registration Agent sends Historical Usage Request.
Consistency Review Process Packet Complete Pre-Review Assistance Resolve Issues Day 24/44 Proposed Determination Day 29/49 Deadline to Elevate Day 30/50.
Michigan Electronic Grants System Plus
PrevNext | Slide 1 Michigan Electronic Grants System MEGS MEGS Additional Features Last Updated: 2/4/2011.
1. Purpose of FYP FYP proposal document Project Performance Monitoring Project milestones/deliverables Assessment Criteria Feedback FYP Timeline Reviewer.
Banner Finance/SciQuest Change Order Integration
RTÉ eCommissioning A Guide to the Supplier Registration Process.
Chapter 13 The Promotion Strategy: Developing and Managing Sales
1 How to Process a Contract. 2 The Journey Of A Contract Contract & support documents are prepared by BRCC department employees & signed where appropriate.
Program design overview Pre-contract to post-program year Office on Volunteerism and Community Service.
Summer Internship Program Outline
“The Honeywell Web-based Corrective Action Solution”
A PROFESSIONAL CONSULTANT IS NOT AN EXPENSE, BUT AN INVESTMENT General International Insurance Consultants By giibc.comgiibc.com.
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
Presented by YOUR NAME THE DATE
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
Ensure Vendor/Engineer of Choice Product Quality
Finalizing the IEP Process Consent for Initial IEP PWN following the IEP Copies to Parent IEP Amendments Revocation of Consent West Virginia Department.
Introduction to Integrated Library Systems
PPAP Requirements Training
Change Control Change is inevitable - how to manage it?
Requisition Process. Requisitioning Procedures Words to live by: Massachusetts Uniform Procurement Act, M.G.L. c.30B requires the following on all purchases.
MIS 325 PSCJ. 2  Business processes can be quite complex  Process model: any abstract representation of a process  Process-modeling tools provide a.
Provider Training Request for Proposal Spring 2000 Bureau of Contract Management Department of Human Services.
CBER Managed Review Process Sheryl A. Kochman Deputy Director, DBA, OBRR, CBER September 15, 2009.
How the Change Control Process Affects Project Quality
Supplier Product & Process Change Request. Flow Diagram: Supplier Product & Process Changes Requests Change notification form completed by supplier then.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
1 Addendum Fall 2006 Limited-Term RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. September 11, 2006.
Employee & Organizational Development Position Description Questionnaire (PDQ) Review “The PDQ and YOU” Human Resources The University of Tennessee
SYSTEM PLANNING Addendum FALL 2003 RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. October 2003 PLEASE.
Supplier Change Request Portal
Author Instructions How to upload Abstracts and Sessions to the Paper Management System.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
“513(g)s” Requests for Information Lawrence “Jake” Romanell, RM (AAM) Office of Device Evaluation Center for Devices and Radiological Health.
Contract Training Class I
2 BOM and ICN/ECN Training What is BOM Who is handling the BOM Who use the BOM and why need it accurate BOM structure and format Definition of each.
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
Author Instructions How to upload Abstracts and Sessions to the Paper Management System.
WELCOME!  The Physical Education Teacher Hire/ Professional Development Grant Application Webinar will begin in a few minutes!
Data Add/Deletion/Amendment/Purging Application 資料異動申請單 7 th April WPG INTERNATIONAL (SOUTH ASIA) PTE LTD.
1 Addendum FALL 2004 RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. November 2004.
DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER FIRST.
Using 23V for Supplies/Services? Follow these steps! For purchases < $3,500 ($2,500 for services) Make Best Value Determination Document Decision Select.
Governance, risk and ethics. 2 Section A: Governance and responsibility Section B: Internal control and review Section C: Identifying and assessing risk.
Office of Management and Enterprise Services Central Purchasing Division Keith Gentry Contract Manager
1 DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER FIRST.
Engineering Change Request (ECR) Process Change Request (PCR)
DSQR Training Reliance System
JES Electric Price Increases Compel Businesses to Use Modern Purchase and Use Programs Overview 2017.
Make Best Value Determination
<NPI/Engineering Change/Phase Out>
Reliance Supplier Corrective Action Process
Quality Management Systems – Requirements
Cuero ISD Education Foundation
$$.$$ 1. Begin by filling out the total dollar value of the order (write in above the $0.00).
Non-Geographic Porting Process : SWEDEN
Geographic Porting Process : SWEDEN
Reliance Supplier Corrective Action Process
ENTERGY SERVICES, INC. February 23, 2006
How do you prepare a request for proposal (RFP)?
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
DSG Governance Group Recommendations.
Objectives The Core Plan of the Suggestion System is intended to encourage teamwork, foster continuous quality improvement, and provide fair and equitable.
Presentation transcript:

SUPPLIER VA/VE SUGGESTION FORM ATTN: ___________________________ SUBMITTED DATE: ____________________________ COMPANY: _______________________________________ SIGNATURE:______________________________________ CONTACT NAME:__________________________________ PHONE #: __________________FAX #:_________________ ADDRESS:_________________________________ PART NAME:______________________________________ COST IMPACT: Other Costs: (die change, fixture modification, etc.) $______________ Lead Time: _________ wks. $ X = (cost change) (vol./yr.) (cost change / yr.) Approved (Customer) Approved (MCI GSS) SUGGESTION DESCRIPTION: (Please illustrate and explain; submit attachments if necessary) CURRENT:PROPOSED: FINAL REPLY ACCEPT / REJECT (circle one) If reject, Please explain:________________________________________________ ________________________________________________________ Reason for request: (Circle all that apply) cost reduction performance improvement supplier productivity improvement productivity improvement Other (describe) ___________________________________________________________________________________ LOG NUMBER: ECI #: ________ RESUBMISSION REQUESTED: C/R Split INITIAL CONTACT WITH SUPPLIER: Final Reply Date ______ 1 Idea per form Routing: Supplier  Purchasing  Localization  Purchasing  Supplier PART NUMBER:__________________________ (only 1 part # per form) Effective Date

GUIDE FOR SUBMISSION OF VA/VE SUGGESTION FORM DEFINITION / PURPOSE OF VA/VE Value Analysis / Value Engineering is a program used at MCI GSS to continually evaluate the design of products and components to identify potential improvements. The program reflects the MCI GSS company objective of continuous improvement using the “Kaizen” philosophy, and has also been proven to be beneficial to MCI GSS, MCI GSS’s Customers, and its suppliers. VA/VE SUGGESTION FORM The MCI GSS VA/VE suggestion system is intended to utilize supplier product knowledge to generate ideas for improvement of components and assemblies. These ideas can result in improved quality, safety, productivity, and piece price reduction. Approval of a VA/VE suggestion is not authorization for implementation. Suggestion ideas can only be implemented upon issuance of an Engineering Change Request (ECR) in accordance with the stated effective date. This ECR will be generated by the supplier and will be monitored and tracked by MCI GSS and the supplier. SUPPLIER VA/VE SUGGESTION FORM ATTN: __________________________ SUBMITTED DATE: ____________________________ COMPANY: _______________________________________ SIGNATURE:______________________________________ CONTACT NAME:__________________________________ PHONE #: __________________FAX #:_________________ ADDRESS:_________________________________ PART NAME:______________________________________ COST IMPACT: Other Costs: (die change, fixture modification, etc.) $______________ Lead Time: _________ wks. $ X = (cost change) (vol./yr.) (cost change / yr.) Approved (customer)Approved (MCI GSS.) SUGGESTION DESCRIPTION: (Please illustrate and explain; submit attachments if necessary) CURRENT:PROPOSED: FINAL REPLY ACCEPT / REJECT (circle one) If reject, Please explain:________________________________________________ _________________________________________ Reason for request: (Circle all that apply) cost reduction performance improvement supplier productivity improvement productivity improvement Other (describe) ___________________________________________________________________________________ LOG NUMBER: ECI #: ________ RESUBMISSION REQUESTED: C/R Split INITIAL CONTACT WITH SUPPLIER: Final Reply Date ______ 1 Idea per form PART NUMBER:_________________________ (only 1 part # per form) Effective Date All bold areas (1 - 8, 10 & 11) must be completed by the supplier. 1) All forms must be submitted to MCI GSS. 2) Supplier Information (Please include name and of the supplier contact person). 3) Part Number affected (Only 1 per form). 4) Description of part. 5) Circle the reasons that most closely meet the request. 6) Include any costs that will be incurred to make the change (i.e. die modification costs). 7)Lead time to make the change. 8) Indicate the cost savings to MCI GSS’s Customer only. Any other cost savings should be detailed separately. 9) MCI GSS’s customer will approve the cost information. 10) Supplier signature showing approval of cost information. 11) Make the proposed suggestion as clear as possible. A combination of illustrations and a detailed sketch is most effective. Attach additional information as necessary. Only 1 idea per form. 12)Assigned by MCI GSS. 13) Date MCI GSS contacted the supplier. 14)Decision area is completed by MCI GSS, and MCI GSS’s customer. The originator will be notified of the decision. 10