February 16, 2011
Tonight’s Agenda Review Assets and Challenges From Last Meeting Review Necessary Assumptions Look at Possible Considerations Take The Next Step
Table 1 – AssetsTable 1 – Challenges *Strength of curriculum offerings *Community has high expectations of our educational system *Fairly conservative/fiscally sound Middle School focused on kids Meeting very diverse student population needs Facilities in good condition *Class sizes Changing demographics Current building floor plans do not lend to high scheduling efficiency Current older facilities not designed to support 2011 technology
Table 2 – AssetsTable 2 – Challenges *Increasing Enrollment *Community Partnerships - U of M Fellowship Graduation rates increasing Positive public perception of School Board All day Kindergarten Investments in science education – MS, HS Choices in curriculum Success Coaches *Negative publicity of educational mandates- - NCLB - AYP *Assumptions based on student demographics *Concerns in regards to spending (current economic situations) Space for special needs population Historical perception of class size/space utilization Resources spread across four elementary schools
Table 3 – AssetsTable 3 – Challenges *District Finances good - Low debt - Good financial management Hormel Foundation -Corporate support Staff Development options -Masters program (= higher quality education for kids) Strong PSEO After school/extra-curricular activities *Larger class sizes *Facilities outdated Low district family income – Free/reduced lunch % ELL/cultural differences High Sped Ed numbers Emerging/promising teaching methodologies do not fit current spaces Spaces not conducive to how we want to educate our kids
Table 4 – AssetsTable 4 – Challenges *Hormel Foundation support *Kindergarten center Science labs Curriculum Community involvement *Unfunded mandates *Income gap vs. state average Achievement gap- socio/economic status Space constraints Football program
Table 5 – AssetsTable 5 – Challenges *High quality staff *All day kindergarten center Parent elementary Reading & math elementary Middle School Team model Neighborhood elementary schools New MS & HS Community Partnerships *Access & sites *Class sizes *Elementary & MS space Pick-up & sites Lack of new elementaries Potential schedule changes Parent secondary Room sizes kindergarten center Creating a sense of secondary with students (Owatonna example)
Table 6 – AssetsTable 6 – Challenges *Programming –strong, student centered programming *Community – Collaboration Family support Partnerships Increasing enrollment High quality programming Comprehensive programming Supportive community Strong partnerships *Building – age, capacity, infrastructure, energy efficiency *$$ - state funding, mandates Aging buildings Space for programming State funding Mandates Infrastructure – Technology Rate of change – knowledge Space Diversity – changing demographics
Table 6 – AssetsTable 6 – Challenges All-day everyday Kindergarten Early childhood programming Student support systems Family support systems Specialized programming- SPED, GT, ELL, Intervention Success Coaches ALC Early intervention Innovative Middle School Science, teaming, Fine Arts, College Readiness AHS – Teaming, retaining students Global learning Involved parents Diversity – changing demographics Security Energy inefficiencies Parking Green space Class size Increasing enrollment
Assumptions
Assumptions
Assumptions
Assumptions
Assumptions
Assumptions
Assumptions
Assumptions
Assumptions
Considerations
Needs to Meet All State and Federal Mandates Needs to Integrate with Current District Programs Needs to be Innovative and 21 st Century ◦ Possibilities: Grade Level Centers Choice/Magnet Schools Program Focus STEM (Science, Technology, Engineering and Math Gifted and Talented Fine Arts 45/15 Balanced Calendar
Racially Segregated Attendance Areas Socioeconomically isolated Attendance Areas Growth Areas Within the Community/School District
State Site Requirements Existing Site Limitations Vacant Buildings on Potential Sites Availability of Potential Vacant Sites Possible Partnerships to Acquire Sites
Building Floor Plan – Gyms; Auditoriums; Cafeterias; Computer Labs; Libraries; Special Ed; Science Labs; Art Rooms; Music Rooms; Classrooms Adequate Classroom and Special Area Size Potential for Remodeling
Public Tolerance for a Tax Increase $20 Million Available for Construction with No Tax Increase
Their World Has Changed
Dream! Do Not Limit Yourself Generate Potential Solutions and Evaluate How They Fit With our Considerations Create Questions You Need Answers To