HS-8 Traffic Calming / Control Committee Draft Plan February 29, 2012 Belmont Ridge Middle School 1.

Slides:



Advertisements
Similar presentations
1 Transportation Update for Loudoun County Presentation to DATA June 23, 2010.
Advertisements

County of Fairfax, Virginia Department of Transportation Updates on the Traffic Calming Program 9/20/2011 Board Transportation Committee.
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
County of Fairfax, Virginia 1 Department of Transportation Bus Stop Improvement Program Fairfax County Department of Transportation Transit Services Division.
County of Fairfax, Virginia Department of Transportation Transportation Funding Alternatives and Outreach Board Transportation Committee June 12, 2012.
County of Fairfax, Virginia Transportation Advisory Commission 1 Department of Transportation Fairfax County Transportation Advisory Committee Jeff Parnes.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2012 to 2015 Board Transportation Committee November 29, 2011.
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
January 23, 2006 FAIRFAX COUNTY PEDESTRIAN TASK FORCE FAIRFAX COUNTY PEDESTRIAN TASK FORCE FINAL REPORT.
County of Fairfax, Virginia Department of Transportation Fairfax Connector Bus Service Plans HOT Lanes and Dulles Rail Phase I Fairfax County Board of.
Tysons Corner Consolidated Transportation Impact Analyses (CTIAs)
Proposed Public Street Widths and Traffic Calming Features Presentation to Transportation Advisory Committee April 17, 2012.
Capital Beltway HOT Lanes Project Project Update March 2009.
Capital Beltway HOT Lanes Project Project Update April 2009.
11 Inova Fair Oaks Hospital Master Facility Plan Zoning Applications Presentation March 2011.
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
TEN-T Info Day for AP and MAP Calls 2012 EVALUATION PROCESS AND AWARD CRITERIA Anna Livieratou-Toll TEN-T Executive Agency Senior Policy & Programme Coordinator.
State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
Accessible Pedestrian Signal Features New possibilities for access in the US Janet M. Barlow Accessible Design for the Blind Asheville, North Carolina.
Speed Feedback Signs Traffic Engineering Division Board of County Commissioners February 11, 2014.
New Pedestrian Crossing Devices for California Wayne Henley Caltrans Division of Traffic Operations Beth Thomas District 4 Pedestrian Coordinator.
City of Oakland: Road Diet Experience
Downtown Access Improvements Plan Town of Hillsborough 2014.
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
Lawrence Park-Wide Traffic Task Force Update April 11 th, 2008 Lawrence Park Ratepayers Association.
DESCRIPTIONDESCRIPTION PROCEDURESPROCEDURES CUT- THROUGH RESTRICTION TRAFFIC- CALMING $200 FINE FOR SPEEDING SIGNS MULTI-WAY STOP (“MWS”) SIGNS THROUGH.
Carroll Engineering Corporation Existing Conditions Richland Township Ronald Reagan Drive Extension Richland Elementary School Strayer Middle School Railroad.
F IRST C APITAL E NGINEERING 48 S. Richland Ave. York PA | Phone: | Fax: | TRAFFIC REPORT Kingston Road &
NH Route 28 Corridor Safety Audit Preliminary Analysis of Historic and Existing Conditions.
Dowling Associates, Inc. Combining Pedestrian Plans & ADA Transition Plans Combining Pedestrian Plans and ADA Transition Plans Gail Payne Dowling Associates,
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road.
Florida Department of Transportation, November 2009
Mecca Roundabout Project Mecca, CA September 28, 2011.
Department of Transportation NTMP 2.0 Neighborhood Traffic Management Program TAC Meeting December 11, 2009.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Lec 14, Ch.8, pp : Intersection control and warrants (objectives) Know the purpose of traffic control Know what MUTCD is and what’s in it Know what.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Safety Provisions Federal Highway Administration.
History of US Bicycle Routes In 1970’s interest in long distance bicycle travel proliferates.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
. Efforts to Reduce Crashes on County Roads in Iowa.
Rutgers Environmental Barrier Analysis & Route Assessment Louis Hoffman Training Coordinator Alan M. Voorhees Transportation Center Edward J. Bloustein.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Broward Complete Streets Technical Advisory Committee (TAC) Meeting Monday August 10, 2015.
Funding Opportunities Safe Routes to School program Approximately $1.5 million available per year Future funding is uncertain Held 5 application cycles.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
Roundabouts: A Safer Choice. What is a roundabout? A roundabout is a type of circular intersection with yield control of entering traffic, islands on.
County of Fairfax, Virginia Department of Transportation Urban Street Standards Progress Report Board of Supervisors Transportation Committee December.
Engineering Study Griffin View Drive & Harbor Hills Blvd. Prepared for Lake County Public Works Engineering 437 Ardice Avenue Eustis, Florida Purchase.
Neighborhood Traffic Management Program (NTMP) Background The NTMP program was develop to promote and maintain the safety and livability of local residential.
District 5 Town Hall Neighborhood Safety June 14th, :00 NW Area Command Substation.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Advancing Safety through SAFETEA-LU Michael Halladay FHWA Office of.
County of Fairfax, Virginia Policy on Level of Service in Activity Centers Board Transportation Committee December 17, 2013 Department of Transportation.
Bicycle Safety Countermeasures Module 4.
planning and zoning committee presentation September 19, 2016
City of Charlottesville
College Terrace Traffic Calming Project Evaluation
NE Pasco (The Hills) Multimodal Safety Action Plan Pasco County, FL
Introduction to Development of a city-wide traffic calming program
Meeting of the Hillsborough MPO Board December 5, 2017
Safety Effects of Marked vs
Next Steps for Urban Street Standards
Board Transportation Committee May 6, 2014
NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM
Traffic Study Presented by Keith Wenners, pe, ptoe
Neighborhood Traffic Management Program Greenbrook Drive South
Stockton Safe Routes to School (SRTS) Presentation to School Board
St. Andrews Agenda Item 11.A & 11.B
Presentation transcript:

HS-8 Traffic Calming / Control Committee Draft Plan February 29, 2012 Belmont Ridge Middle School 1

2 Vicinity Map – River Oaks and Highlands Suggestions

Recommendations – River Oaks: Traffic Control Plan - DRAFT 3 Note: Intersection #’s are not consecutive and are based on the initial feedback received from the community.

Recommendations – River Oaks: Traffic Calming Plan - DRAFT 4 Note: Intersection #’s are not consecutive and are based on the initial feedback received from the community.

5 Recommendations – Highlands: Traffic Control Plan - DRAFT Note: Intersection #’s are not consecutive and are based on the initial feedback received from the community.

Recommendations – Highlands: Traffic Calming Plan - DRAFT 6 Note: Intersection #’s are not consecutive and are based on the initial feedback received from the community.

PEDESTRIAN PLAN 7

QUESTIONS FROM JANUARY 11, 2012 MEETING 8 1. VDOT Standards for All-way Stop Signs? - Decision is based on an engineering study that would improve traffic operational characteristics of the intersection - Five or more reported crashes in a 12-month period that are susceptible to correction with all way stop - Vehicular volume for major street approaches: 300 vph for any 8 hours - Vehicular volume for minor street approaches: 200 vph for same 8 hours 2. Speed Humps Guidelines? - Spacing about 500 feet - Clearly visible for 200 feet and placed at least 200 feet from intersections 3. Direct contact with VDOT to seek traffic safety measures /speed limit signs? Customer Service Center: 800-FOR-ROAD ( ) 4. Examples of existing traffic calming measures? - List Included on the last slide 5. HS-8 Walk zone size?

EXAMPLES OF EXISTING TRAFFIC CALMING FEATURES 9 Bulbout/Neckdown – Riding Center Drive, Chantilly Roundabout – Catoctin Circle, Leesburg Raised Crosswalk – Kinross Circle, Herndon Median Landscape – Viking Drive, Herndon

EXAMPLES OF EXISTING TRAFFIC CALMING FEATURES 10 LIST OF AREAS/LOCATIONS WHERE TRAFFIC CALMING FEATURES HAVE BEEN INSTALLED: Town of Leesburg: Catoctin Circle between Edwards Ferry Road and Marshall Drive Roundabouts Raised Crosswalk on Marshall Drive Country Club Drive west of Route 15 Raised Crosswalk Loudoun County: Riding Center Drive, Chantilly Bulbouts/Neckdowns Fairfax County: Kinross Circle, Herndon Speed Humps Raised Crosswalks Hidden Meadow Drive, Sully Speed Humps Raised Crosswalks Viking Drive, Herndon Raised Crosswalk Speed Humps Neckdown Chicane

NEXT STEPS – TRAFFIC CALMING PROCESS 11 Initial Community Meetings Held Committee Finalizes Draft Plan Draft Plan submitted to Board of Supervisors (BOS) County Staff/BOS initiates Traffic Calming Process Support Data Required: Eligible Streets, Issues/Concerns and Petition (75% Petition Area Approval) BOS passes resolution with Support Data Plan submitted for review to various agencies Feedback received from the review agencies VDOT provides final recommendations and approval County Staff (OTS) coordinates implementation of the plan Construction, Implementation and Evaluation Timeline for the process would generally be about 12 to 18 months from the time the committee finalizes the Draft Plan Initial Community Meeting Finalize Draft Plan Determine Petition Area & Secure Support BOS Resolution with Support Data to VDOT VDOT Review and Approval of Plan Implementation Construction Evaluation