Doc.: IEEE 802.11-11/1447r4 Submission December 2011 Eldad Perahia, Intel CorporationSlide 1 Date: 2011-12-02 Authors: P802.11ad Report to EC on Meeting.

Slides:



Advertisements
Similar presentations
Doc.: /04 Submission August 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on meeting the terms of Conditional.
Advertisements

Doc.: /05 Submission September 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on meeting the terms of Conditional.
Doc.: Submission September 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11ae Report to EC on Conditional Approval to go.
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 1 P802.11u report to EC on request for conditional approval.
Doc.: IEEE /0726r1 Submission July 2013 Rich Kennedy (BlackBerry)Slide 1 P802.11af Report to EC on Conditional Approval to go to Sponsor Ballot.
Doc.: IEEE /0320r1 Submission March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 1 P802.11ac Report to EC on Conditional Approval to go to.
Doc.: IEEE /1447r3 Submission November 2011 Eldad Perahia, Intel CorporationSlide 1 Date: Authors: P802.11ad Report to EC on Conditional.
Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
Doc.: Submission1 IEEE Motions in November Plenary DCN: Title: Request for EC Conditional Approval Date Submitted:
Doc.: IEEE /0287r6 Submission March 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to Sponsor.
P802.11ah Report to EC on Conditional Approval to go to Sponsor Ballot
Doc.: IEEE /0287r0 Submission February 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to.
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
Doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 1 July 2009 Plenary Presentation from WG11 to 802 EC Date: Authors:
Doc.: Submission July 2011 D. Denteneer (Philips), B.Kraemer (Marvell) Slide 1 P802.11s report to EC on request for approval to proceed to.
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
xxxx doc.: IEEE /xxxxr0 March 2017
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0872r3 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE Motions in July Plenary DCN:
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2010
November 2008 doc.: IEEE /1437r1 August 2010
November 2008 doc.: IEEE /1437r1 July 2010
TGad March 2011 Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Editor Report Sept 2008 Date: Authors:
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2011
P b to RevCom: Conditional Approval Request
P802.11aq Report to EC on approval to forward draft to RevCom
Presentation transcript:

doc.: IEEE /1447r4 Submission December 2011 Eldad Perahia, Intel CorporationSlide 1 Date: Authors: P802.11ad Report to EC on Meeting Terms of Conditional Approval to go to Sponsor Ballot

doc.: IEEE /1447r4 Submission December 2011 Slide 2 Summary The IEEE 802 Executive Committee (EC) granted conditional approval to P802.11ad to proceed to sponsor ballot at its closing plenary on P802.11ad D5.0 has completed its fifth recirculation ballot, achieving 95% approval and meeting the terms of the conditional approval. This presentation is the report to the IEEE 802 executive committee in support of completion of the requirements for conditional approval to proceed to sponsor ballot. Eldad Perahia, Intel Corporation

doc.: IEEE /1447r4 Submission December 2011 Slide 3 Meeting the terms of conditional approval As per LMSC OM Clause 14: a) Recirculation ballot is completed. Generally, the recirculation ballot and resolution should occur in accordance with the schedule presented at the time of conditional approval. –The Ballot occurred, in accordance with the schedule presented to the EC in document 11-11/1447r3. The recirculation running at the time conditional approval was granted completed on schedule. b) After resolution of the recirculation ballot is completed, the approval percentage is at least 75% and there are no new valid DISAPPROVE votes. –The approval percentage is 95%. –There are no new DISAPPROVE votes. c) No technical changes, as determined by the WG Chair, were made as a result of the recirculation ballot. –No changes were made as a result of the recirculation ballot. d) No new valid DISAPPROVE comments on new issues that are not resolved to the satisfaction of the submitter from existing DISAPPROVE voters –During the last recirculation, 23 comments were received. Of these only 10 comments were from DISAPPROVE voters. None of these comments were on new issues. –Therefore, no new DISAPPROVE comments were received. Eldad Perahia, Intel Corporation

doc.: IEEE /1447r4 Submission December 2011 Slide 4 Meeting the terms of conditional approval - continued e) If the WG Chair determines that there is a new invalid DISAPPROVE comment or vote, the WG Chair shall promptly provide details to the Sponsor. There are no new DISAPPROVE votes The 10 new DISAPPOVE comments from existing DISAPPROVE votes were a continuation of comments and issues from the previous recirculation. f) The WG Chair shall immediately report the results of the ballot to the Sponsor including: the date the ballot closed, vote tally and comments associated with any remaining disapproves (valid and invalid), the WG responses and the rationale for ruling any vote invalid. The ballot closed on at 23:59 ET The vote tally: For: 197, against: 11, abstain: % return., 94.7% affirmative. The comments associated with remaining disapproves are included in slides 8-11 of this deck. No Disapprove votes have been ruled invalid. Eldad Perahia, Intel Corporation

doc.: IEEE /1447r4 Submission P802.11ad Draft Stability December 2011 Eldad Perahia, Intel CorporationSlide 5 DraftDateNumber of Pages 1.0Sept March May July Sept

doc.: IEEE /1447r4 Submission WG Letter Ballot Results – P802.11ad December 2011 Eldad Perahia, Intel CorporationSlide 6 Ballot ID Ballot Close Date TitleBallot Type Pool Return %Return Abstain %Abstain Approve Disapprove %Approve Oct 2010 Technical Letter Ballot for TGad draft 1.0 Technical April 2011 First Recirculation Ballot for TGad draft 2.0 Recirculation June 2011 Second Recirculation Ballot for TGad draft 3.0 Recirculation Aug 2011 Third Recirculation Ballot for TGad draft 4.0 Recirculation Oct 2011 Fourth Recirculation Ballot for TGad draft 5.0 Recirculation Nov 2011 Fifth Recirculation Ballot for TGad draft 5.0 Recirculation

doc.: IEEE /1447r4 Submission WG Letter Ballot Comments – P802.11ad December 2011 Eldad Perahia, Intel CorporationSlide 7 Ballot ID Ballot Close Date Title Total Number of Comments received (Yes and No votes) Oct 2010Technical Letter Ballot for TGad draft (670 T, 559 E) 1745 April 2011First Recirculation Ballot for TGad draft (198 T, 132 E) 1771 June 2011Second Recirculation Ballot for TGad draft (133 T, 81 E) 1839 Aug 2011Third Recirculation Ballot for TGad draft (95 T, 70 E) 1856 Oct 2011Fourth Recirculation Ballot for TGad draft (27 T, 14 E) Nov 2011Fifth Recirculation Ballot for TGad draft (22 T, 1 E)

doc.: IEEE /1447r4 Submission Unsatisfied Technical comments by commenter December 2011 Eldad Perahia, Intel CorporationSlide 8 VoterLB168LB174LB177LB183LB185LB186Total Ashley, Alex (NDS Limited) Bahr, Michael (Siemens AG) 66 Chaplin, Clint F (SAMSUNG) Hamilton, Mark (Polycom, Inc.) Hiertz, Guido R. (Philips) 33 Hunter, David (TimeFactor) Ji, Lusheng (AT&T) 11 Marshall, Bill (AT&T Labs Research) 37 Mccann, Stephen (Research In Motion Limited) 33 Miller, Robert R (AT&T) 44 Rosdahl, Jon W (CSR) Total 291

doc.: IEEE /1447r4 Submission Unsatisfied Technical Comments – Topics December 2011 Eldad Perahia, Intel CorporationSlide 9 TopicBeamformingPHYMAC (frame formats) MAC (MLME) MAC (Others) GeneralTotal Ashley, Alex (NDS Limited) Bahr, Michael (Siemens AG) 6 6 Chaplin, Clint F (SAMSUNG) Hamilton, Mark (Polycom, Inc.) Hiertz, Guido R. (Philips) Hunter, David (TimeFactor) Ji, Lusheng (AT&T) 1 1 Marshall, Bill (AT&T Labs Research) Mccann, Stephen (Research In Motion Limited) 123 Miller, Robert R (AT&T) Rosdahl, Jon W (CSR) Total

doc.: IEEE /1447r4 Submission Unsatisfied Editorial comments by commenter December 2011 Eldad Perahia, Intel CorporationSlide 10 VoterLB168LB174LB177LB183LB185LB186Total Ashley, Alex (NDS Limited) 347 Chaplin, Clint F (SAMSUNG) Hamilton, Mark (Polycom, Inc.) 11 Hiertz, Guido R. (Philips) 2 Hunter, David (TimeFactor) Ji, Lusheng (AT&T) 22 Marshall, Bill (AT&T Labs Research) 19 Rosdahl, Jon W (CSR) Total 118

doc.: IEEE /1447r4 Submission Unsatisfied Editorial Comments – Topics December 2011 Eldad Perahia, Intel CorporationSlide 11 TopicBeamformingPHYMAC (frame formats) MAC (MLME) MAC (Others) GeneralTotal Ashley, Alex (NDS Limited) Chaplin, Clint F (SAMSUNG) Hiertz, Guido R. (Philips) 2 2 Hunter, David (TimeFactor) Ji, Lusheng (AT&T) Marshall, Bill (AT&T Labs Research) Rosdahl, Jon W (CSR) Mark Hamilton (Polycom, Inc) 11 Total

doc.: IEEE /1447r4 Submission Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: –Double click on the icon to the right to open this. A copy of this same data presented using MyBallot access database report format is attached. –Double click on the icon to the right to open this. December 2011 Eldad Perahia, Intel CorporationSlide 12

doc.: IEEE /1447r4 Submission TGad Timeline December 2011 Eldad Perahia, Intel CorporationSlide 13 OpenClose Fifth recirculation (TGad D5.0) (completed)9-Nov-1124-Nov-11 First sponsor ballot19-Dec-1118-Jan-12 Second sponsor ballot13-Mar-1227-Mar-12 Third sponsor ballot16-Apr-1230-Apr-12 Fourth sponsor ballot17-May-1231-May-12 Fifth sponsor ballot16-Jun-1230-Jun-12 EC to RevCom July-12 RevCom to SB Dec-12

doc.: IEEE /1447r4 Submission Backup R3 of this document was approved during the plenary session of the working group on 9 November –Passed in the Working Group 73 yes, 0 no, 11 abstain December 2011 Eldad Perahia, Intel CorporationSlide 14