Doc.: IEEE 11-12/0179r1 SubmissionGraham Smith (DSP Group), Slide 1 P802.11aa Status report to EC on in support of approval to proceed to RevCom Date:

Slides:



Advertisements
Similar presentations
Doc.: IEEE EC-10/0016r1 Meeting Agenda Oct 2010 Jon Rosdahl, CSRSlide 1 EC Interim – 5 Oct 2010 Date: Authors:
Advertisements

Doc.: IEEE /0012r0 Submission January 2011 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmb Nov 2010 Agenda Date: Authors:
Doc.: IEEE /0872r4 Submission November 2010 S.McCann (RIM), B.Kraemer (Marvell) Slide 1 P802.11u report to EC on request for conditional approval.
Doc.: IEEE /0623r1 Submission May 2009 Jon Rosdahl, CSRSlide 1 Proposal for P&P Change - # Date: Authors:
Doc.: IEEE /0953r0 Submission Sept 2009 Adrian Stephens, Intel CorporationSlide TGmb Editor Report - Sept 2009 Date: Authors:
Doc.: IEEE /2079r0 Submission July 2007 Terry Cole, AMDSlide 1 WG Technical Editors Opening Report (July) Date: Authors:
Doc.: IEEE /0445r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide TGn Editor Report May 2009 Date: Authors:
Doc.: IEEE /0358r0 Submission March 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac March 2013 Closing Report Date: Authors:
Doc.: IEEE /1226r0 Submission September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac September 2013 Closing Report Date:
802.16m Closing Report November 11, 2010 Dallas, Tx Session # IEEE m-10/0035.
Doc.: IEEE /0144r2 Submission January 2014 Adrian Stephens, Intel CorporationSlide January 2014 WG Motions Date: Authors:
Doc.: IEEE /1438r0 Submission November 2008 Jon Rosdahl, CSRSlide EC Material Date: Authors:
Doc.: IEEE /0849r1 Submission July 2014 Adrian Stephens, Intel CorporationSlide 1 July Items for the LMSC EC Agenda Date:
Doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11ae Report to EC on Conditional Approval to go.
Doc.: IEEE /0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 1 P802.11u report to EC on request for conditional approval.
Doc.: IEEE /0726r1 Submission July 2013 Rich Kennedy (BlackBerry)Slide 1 P802.11af Report to EC on Conditional Approval to go to Sponsor Ballot.
Doc.: IEEE 11-12/0179r3 SubmissionGraham Smith (DSP Group), Slide 1 P802.11aa Status report to EC in support of approval to proceed to RevCom Date:
Doc.: IEEE /0495r1 Submission May 2009 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /0495r3 Submission May 2009 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
Doc.: Submission1 IEEE Motions in November Plenary DCN: Title: Request for EC Conditional Approval Date Submitted:
Doc.: Submission1 IEEE Motions in November Plenary DCN: Title: Request for EC Conditional Approval Date Submitted:
Doc.: IEEE /0054r00 Submission March 2013 Apurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the March Plenary EC Meeting IEEE P
IEEE mc Closing Report for March 2015
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: Submission July 2011 D. Denteneer (Philips), B.Kraemer (Marvell) Slide 1 P802.11s report to EC on request for approval to proceed to.
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v report to EC on request for conditional approval to proceed.
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
November 2008 doc.: IEEE /1437r1 July 2011
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z conditional approval report to ExCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z conditional approval report to ExCom
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
TGn Closing Report Vancouver, BC, Canada 802 Plenary
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2010
TGn Closing Report Los Angeles, CA, US 802 Interim
November 2008 doc.: IEEE /1437r1 November 2010
June 2009 r2doc.: IEEE /0674r0 doc.: IEEE /0674r0 April 2010
November 2008 doc.: IEEE /1437r1 July 2010
TGn Closing Report Vancouver, BC, Canada 802 Plenary
November 2010 doc.: IEEE /0800r9 November 2011
TGn Closing Report – September 24 ‘09
P802.11aq Report to EC on approval to forward draft to RevCom
January 2012 doc.: IEEE /0179r1 Jan 2012
Jan 2012 doc.: IEEE Jan aa –Robust Audio Video Transport Streaming Jacksonville Closing Report Date: Authors: Graham Smith,
Presentation transcript:

doc.: IEEE 11-12/0179r1 SubmissionGraham Smith (DSP Group), Slide 1 P802.11aa Status report to EC on in support of approval to proceed to RevCom Date: Authors: NameCompanyAddressPhone Graham SmithDSP Group2941 Sunrise Blvd, Ste 100 Rancho Cordova, CA Bruce KraemerMarvell5488 Marvell Lane, Santa Clara, CA Jan 2012

doc.: IEEE 11-12/0179r1 Submission January 2012 Slide 2 Graham Smith (DSP Group), Slide 2 Background P802.11aa D8.0 has completed its second recirculation ballot, achieving 100% approval. During the second re-circulation Sponsor Ballot, 6 comments were received. As well as preparing resolutions to all of the comments, the comment resolution committee did make 4 minor changes. All of the comments and their resolutions are available here sb-comments.xlshttps://mentor.ieee.org/802.11/dcn/11/ aa-second- sb-comments.xls For convenience, a list of all four changes that were not comment resolutions, are contained here: additional-changes-in-11aa-d9-0.dochttps://mentor.ieee.org/802.11/dcn/12/ aa- additional-changes-in-11aa-d9-0.doc Re-circulation of Sponsor ballot opened on January 17 and closes Jan 27, 2012 Graham Smith (DSP Group),

doc.: IEEE 11-12/0179r1 Submission Summary This presentation is the report to the IEEE 802 executive committee in support of completion of the requirements for approval to proceed to IEEE-SA RevCom Jan 2012 Graham Smith (DSP Group), Slide 3 Graham Smith (DSP Group), Slide 3

doc.: IEEE 11-12/0179r1 Submission January 2012 Graham Smith (DSP Group), Slide 4 IEEE 802 Sponsor Ballot Results – P802.11aa DraftOpenedClosedDaysPoolForAgainstAbstainReturn#Cmnts %% Post-ballot vote change

doc.: IEEE 11-12/0179r1 Submission January 2012 Graham Smith (DSP Group), Slide 5 Mandatory Coordination Coordination EntityDraftDateStatus IEEE-SA Editorial (MEC)D8.0Jan 12“Meets all editorial requirements. “ Quantities, Units and Letter Symbols (SCC14) Not required Terms and Definitions (SCC10) Not required Registration Authority Committee (RAC) D9.0?? Request Submitted for “GCR MAC Group Address” by Bruce Kraemer on Jan 11, 2011.

doc.: IEEE 11-12/0179r1 Submission TGaa Approval for submission to RevCom Approve document 11-12/0179r0 as the report to the IEEE 802 Executive Committee on the requirements for approval to forward P802.11aa to RevCom, and Empower the chair to make editorial changes if required, and On completion of the third sponsor ballot recirculation, if this ballot is successful, request the IEEE 802 Executive Committee to forward P802.11aa to RevCom. [Moved by on behalf of vote: Moved:, Seconded:, Result: y-n-a] January 2012 Graham Smith (DSP Group), Slide 6