Harnessing the Giant: Storage Efficiency on an Anemic IT Budget Data Center Enhancements Inc.

Slides:



Advertisements
Similar presentations
Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Advertisements

Symantec 2010 Windows 7 Migration Global Results.
6 Sigma Consulting
Challenges in optimizing data center utilization
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
1 Nia Sutton Becta Total Cost of Ownership of ICT in schools.
Remuneration of using Green IT June 18, Agenda Approaches to green computing Drivers for adopting green technologies Progress so ICICI Financial.
Chicago Market Data Backup & Virtualization Overview.
Analysis of Financial Statements
TACTICAL/OPERATIONAL PLANNING
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Addition and Subtraction Equations
Towards Automating the Configuration of a Distributed Storage System Lauro B. Costa Matei Ripeanu {lauroc, NetSysLab University of British.
David Burdett May 11, 2004 Package Binding for WS CDL.
Air Permitting : Process Improvement Kaizen Event June 4 – 8, 2007 Transforming Government- the challenge and opportunity of the 21st century.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 Making Changes to Existing Name and Work/Expression Authority Records Module 7. Making Changes to Existing Name and Work/Expression Authority Records.
The 5S numbers game..
Green Datacenters solution March 17, 2009 By: Sanjay Sharma.
1 A B C
Inspections on an iPad, iPhone, iPod Touch, Android Tablet or Android Phone.
Operations Management
Impressive Star Softwares (P) Ltd. Presents Sent Item Box-Detail of Mails from Tally ( 1.0 )
MA Metal Finishing Forum Tools and Techniques for Optimizing Metal Finishing Process/Environmental MA Metal Finishing Forum Kevin L. Klink, P.E.
Break Time Remaining 10:00.
The basics for simulations
Chapter 5 – Enterprise Analysis
Matt Warner Future Facilities Proactive Airflow Management in Data Centre Operation - using CFD simulation to improve resilience, energy efficiency and.
Virtualization & Disaster Recovery
Deploying Virtualised Infrastructures for Improved Efficiency and Reduced Cost Adrian Groeneveld Senior Product Marketing Manager Adrian Groeneveld Senior.
PP Test Review Sections 6-1 to 6-6
Strategic Meetings Management 101
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
The Time Value of Money.
Capacity Planning For Products and Services
Capacity Planning For Products and Services
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Dynamic Access Control the file server, reimagined Presented by Mark on twitter 1 contents copyright 2013 Mark Minasi.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Intro to Enersol What is Retro-commissioning? Define Benefits of Retro-commissioning Define Retro-commissioning Process Discuss Retro-commissioning Findings.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
City Council Meeting Agenda Items October 28, 2013.
OCD Internal and Education and Training Purposes Only A New Approach for You to Create Broader, Long-term Customer Engagements CL12092.
Before Between After.
Subtraction: Adding UP
: 3 00.
5 minutes.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
Clock will move after 1 minute
PSSA Preparation.
Employment Ontario Literacy and Basic Skills Performance Management Reports Training For Service Providers.
Chapter 13 Preparing The Systems Proposal Systems Analysis and Design Kendall and Kendall Fifth Edition.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Introduction to ikhlas ikhlas is an affordable and effective Online Accounting Solution that is currently available in Brunei.
1 Making a Seamless Move to Windows ® 7 Imagine a migration that went so well, nobody noticed.
Aviation Management System 1 2  Silver Wings Aircraft Aviation Management System represents a functional “high – end” suite of integrated applications.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
Wayne Hogan National Storage Manager Sun Microsystems of Canada, Inc.
1 © 2004 Cisco Systems, Inc. All rights reserved. OPT _05_2004.c The Business Case for Storage Networks Storage Strategies for Lowering TCO.
STORAGE MANAGEMENT/MASTER: The Storage Control Center SRM, Performance Monitoring and Operations Jenney Fields Senior Consultant GlassHouse Technologies,
1 Implementing a Virtualized Dynamic Data Center Solution Jim Sweeney, Principal Solutions Architect, GTSI.
Presentation transcript:

Harnessing the Giant: Storage Efficiency on an Anemic IT Budget Data Center Enhancements Inc.

Theres a Storm on the Horizon According to AFCOMs Data Center Institute, power failures and limits on power availability will interrupt data center operations at more than 90% of all companies over the next five years.

Challenging the IT Environment Data center energy consumption continues to grow at a rate of 15% per year. Corporate storage requirements continue growing at 50% or more per year 2009 IT budgets are static or have declined, creating a financial squeeze for IT Understanding the underlying issues behind storage energy consumption will help IT Professional better manage this challenge

Current Efficiency Trends Billion BTUs

Energy Consumption by State

NY State Energy Prices per MM BTU U.S Dept. of Energy

Where Does the Energy Go?

Storage Power Consumption

Anatomy of a Storage System

Technology Enhancements Large Capacity Disks Multi-Tiered Storage Architecture Automated, Policy- Based Data Migration Software

File Access Over Time

Comparing Disk Drive Attributes

Disk Drive Power Consumption Estimated Electrical Cost per 100 TB by Disk Capacity and Type of Technology Vendor Disk Capacity in GB Disk Drive Type Rotation Speed Typical Power per Disk in Watts Idle Power per Disk in Watts Number of Raw Disks per 100 TB Total Power in KW/hr. **Average Cost per $ Year Power Cost per 100 TB 5-Year Power Cost per 100 TB Power Efficiency Index (Watts/GB) BTUs per disk BTU/hr per 100 TB Seagate3.5-inch73FC15K $1.29$11,273$56, ,371,365 Hitachi3.5-inch73FC15K $1.23$10,736$53, ,591,776 Seagate3.5-inch146FC15K $0.72$6,327$31, ,830,868 Hitachi3.5-inch146FC15K $0.69$6,020$30, ,099,674 Seagate3.5-inch300FC15K $0.40$3,515$17, ,128,669 Hitachi3.5-inch300FC15K $0.41$3,552$17, ,949,187 Seagate3.5-inch73FC10K $1.23$10,736$53, ,591,776 Hitachi3.5-inch73FC10K $1.23$10,813$54, ,274,574 Seagate3.5-inch146FC10K $0.68$5,943$29, ,416,876 Hitachi3.5-inch146FC10K $0.62$5,445$27, ,478,686 Seagate3.5-inch300FC10K $0.38$3,365$16, ,846,598 Hitachi3.5-inch300FC10K $0.36$3,160$15, ,333,751 Seagate3.5-inch400FC10K $0.19$1,693$8, ,156,680 Hitachi3.5-inch450FC10K $0.24$2,135$10, ,839,527 Seagate3.5-inch450FC10K Seagate3.5-inch600FC10K Seagate3.5-inch250SATA II7.2K $0.27$2,373$11, ,080,768 Hitachi3.5-inch250SATA II7.2K $0.15$1,338$6, ,368,436 Hitachi3.5-inch320SATA II7.2K $0.12$1,047$5, ,980,801 Seagate3.5-inch400SATA II7.2K $0.21$1,819$9, ,920,400 Seagate3.5-inch500SATA II7.2K $0.14$1,187$5, ,040,384 Hitachi3.5-inch500SATA II7.2K $0.08$669$3, ,684,218 Seagate3.5-inch750SATA II7.2K $0.10$870$4, ,093,006 Hitachi3.5-inch750SATA II7.2K $0.09$796$3, ,469,760 Seagate3.5-inch1000SATA II7.2K $0.07$649$3, ,248,512 Hitachi3.5-inch1000SATA II7.2K $0.08$660$3, ,485,705

A Typical Tiered Storage Architecture

How Do the Costs Add Up? $33,680

Technology Enhancements (cont.) Thin Provisioning Data Deduplication Energy Monitoring and Management

Configuration Changes Storage Consolidation Storage Virtualization FC Network Port Consolidation Performance Optimization Firmware Tune-Up Disk Spares Assignment RAID Array Layout

Loss from RAID5 Parity and Sparing

Configuration Changes (cont.) New Generation Power Supplies Eliminate Internal Disks (Boot-from-SAN) Centralize Storage Management Functions Reclaim Unused Storage Space

Operational Improvements Retire Legacy Equipment Shut Down All Inactive Systems Clean Up File Systems Preen Data for Unwanted/Illegal Files Review Schedules and Backup Lists

Operational Improvements (cont.) Implement File Aging and Expiration Retain Only Data that is Necessary Increase the Use of Off- Line Storage

Backup and Recovery Limiting Cloning Control the Number of File Copies Turn On Data Compression Use High Capacity Tape Drives

Advanced Technologies 2 1/2 inch Drives Solid State Disks Automatic Power Down Disk Drives Improved Storage Controller Efficiency DC Power Supply MAID Technology

Improve the Data Center Environment Replace Missing Floor Tiles Measure Air Pressure Under Raised Floor Eliminate Items Blocking Air Flow Replace Blank Panels in Storage Racks Evaluate Raising Temperature and Humidity Settings Implement Cabinet Cooling Technologies Obtain a Thermal Map of Airflow Turn off Video Monitors When Not in Use

Best Practices Increase User Awareness Data Classification Balancing Performance, Availability, Capacity, and Energy Efficiency Requirements Change the IT Culture

Changing the IT Culture Not the IT Environment of the 80s or 90s Make Energy Efficiency Part of Your Core Culture –Secure Executive Level Commitment –Train, train, and train for results –Make energy conservation a component in every IT employees evaluation criteria –Provide incentives and personal recognition for efficiency improvements –Raise the level of visibility and importance of energy efficiency

Potential Results EPA Report to Congress

Where Do We Start? If you dont know where youre going, how will you know when youve arrived? Begin with an Unbiased Assessment –Provides a clear picture of what you have now –Creates a baseline for measuring change –Allows you to prioritize your approach based on actual operating environment parameters –Will identify quick hit opportunities –Identifies scope, duration, gaps, and resource requirements needed for a successful project –Yields core information for strategic planning

Assessment Objectives What Should a Storage Assessment Provide? –Presents the big picture to management –Estimates the efficiency level of current storage equipment –Provides a documented operational baseline –Facilitates a gap analysis –Determines project resource requirements –Identifies and prioritizes area of greatest return –May provide ROI, TCO and other financial artifacts for a proposed remediation project

Implementation Strategy Improvement is a process, not an event A Storage Optimization Project should include: –A comprehensive transformation strategy –Quantifiable goals and key milestones –Key metrics that can be tracked and evaluated –A prioritized implementation timeline –Master Project Plan with key events identified –Annualized budget requirements –A methodology for staged implementation –Integration points that allow the project to gracefully merge with other IT projects

Summary Power and Cooling Expense will Be a Growing Factor in Future IT Budgets Many Opportunities Exist for Improvement Opportunities for Improvement Range from Quick and Simple to Complex and Obscure Dramatic Cost Savings can be Achieved over Time with a Good Strategy An Effective Energy Strategy Starts with a Comprehensive Assessment Energy Efficiency Improvement is a Continuous Process

RANDY COCHRAN - DATA CENTER ENHANCEMENTS INC. - PHONE: (630) WEB: Questions?

Forty Improvement Steps

Low Cost Improvements

Low Cost Improvements (Cont.)

Modest Cost Improvements

Modest Cost Improvements (Cont.)

Substantial Investments

Substantial Investments (cont.)

Re-Architected Solutions

Re-Architected Solutions (cont.)