RPS Compliance Reporting Working Group: Portfolio Content Category Classification Energy Division Staff: Robert Blackney and Sean Simon September 19, 2013.

Slides:



Advertisements
Similar presentations
1
Advertisements

Chapter 7 Constructors and Other Tools. Copyright © 2006 Pearson Addison-Wesley. All rights reserved. 7-2 Learning Objectives Constructors Definitions.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Extended Learning Module D (Office 2007 Version) Decision Analysis.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Module 7 Proposal Budgets.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
HL7 Project Management Tool Overview for HL7 Project Facilitators
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination. Introduction to the Business.
1 Introducing the Specifications of the Metro Ethernet Forum MEF 19 Abstract Test Suite for UNI Type 1 February 2008.
European Union Cohesion Policy
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Foreign Air Operator Validation & Surveillance
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
Measurements and Their Uncertainty 3.1
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Create an Application Title 1A - Adult Chapter 3.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
Human Service Providers and Referrals Chapter 5. Human Service Providers and Referrals 5-2 Objectives Demonstrate the process for entering a Human Service.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Plan My Care Brokerage Training Working in partnership with Improvement and Efficiency South East.
Applicable for Persons Registered under Article 10
Grants 3.0 Departmental Administrator Review January 22, 2014.
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S.A.F. 1 Commodity Councils 101 NAME (S) SAF/AQCDATE.
Break Time Remaining 10:00.
Chapter 5 – Enterprise Analysis
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
1 DARTBOARD Tutorial: DARTBOARD Access and Use for Faculty and Staff Tutorial: DARTBOARD Access and Use for Faculty and Staff.
User Friendly Price Book Maintenance A Family of Enhancements For iSeries 400 DMAS from Copyright I/O International, 2006, 2007, 2008, 2010 Skip Intro.
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
AEMCPAGE Relaunch 1 June 2009.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
1 Displaying Open Purchase Orders (F/Y 11). 2  At the end of this course, you should be able to: –Run a Location specific report of all Open Purchase.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
1 HR Presentation Living Sky School Division No. 202 October 26 th, 2010.
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
Page 1 of 43 To the ETS – Bidding Query by Map Online Training Course Welcome This training module provides the procedures for using Query by Map for a.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
1 FL EDI R3 Test Requirements Rule 69L , F.A.C.
GEtServices Services Training For Suppliers Requests/Proposals.
GL Interfaces 1 Using General Ledger Interfaces The File Maintenance and Procedures to successfully use the General Ledger Interfaces Jim Simunek, CPIM.
: 3 00.
5 minutes.
Analyzing Genes and Genomes
Essential Cell Biology
Clock will move after 1 minute
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Import Tracking and Landed Cost Processing An Enhancement For AS/400 DMAS from  Copyright I/O International, 2001, 2005, 2008, 2012 Skip Intro Version.
© Paradigm Publishing, Inc Excel 2013 Level 2 Unit 2Managing and Integrating Data and the Excel Environment Chapter 6Protecting and Sharing Workbooks.
1.  What is a Renewable Energy Credit (REC)?  What are they used for?  Who uses them?  How is REC ownership tracked?  What is the Renewable Portfolio.
California Energy Commission HEATHER RAITT Technical Director Renewable Energy Program Proposed Changes to RPS Guidelines April 17, 2006 Proposed Changes.
California’s Renewable Energy Credits (REC) Market Update
Presentation transcript:

RPS Compliance Reporting Working Group: Portfolio Content Category Classification Energy Division Staff: Robert Blackney and Sean Simon September 19,

Agenda 10:00 – 10:15Overview Housekeeping Introductions Working Group objectives and scope 10:15 – 10:30Clarify CPUC and California Energy Commission (CEC) Responsibilities and Processes 10:30 – 12:00Summary of PCC Definitions, Criteria and Information Required to Demonstrate a PCC classification 12:00 – 1:15Lunch 1:15 – 3:15The Auditable Package - CPUC Compliance Reporting Documents 3:15 – 3:45Spreadsheet Form and Functionality 3:45 – 4:00 Next steps 2

Working Group Objectives Staff propose the following objectives: Collaborative review of compliance requirements, the staff proposal, and stakeholder comments Identify appropriate information that retail sellers must provide with RPS compliance reports for all procurement claimed to meet any of the portfolio content categories, consistent with RPS statute and Commission decisions Discuss methods to optimize the functionality of RPS compliance spreadsheets- including the staff proposed templates - with an emphasis on methods to efficiently and effectively demonstrate retail seller’s RPS procurement properly belongs in the portfolio content category in which it is claimed for RPS compliance Working Group will not: Re-litigate definitions, rules and processes established in D and D Address RPS enforcement rules Address confidentiality rules established in D , D

Clarify CPUC and California Energy Commission (CEC) Responsibilities and Processes 4

Defining Agency Roles Clarify CPUC and California Energy Commission (CEC) Responsibilities and Processes CEC Roles Verification Certify renewable facilities as RPS eligible Design and implement an accounting system to track and verify RPS compliance (WREGIS) Verify no RECs are double counted by multiple retail sellers POU Regulations Adopt regulations for 33% RPS, specifying the enforcement provisions for publicly-owned electric utilities in meeting the RPS Issue a notice of violation and correction against a POU for not complying with the RPS Refer the POU’s violation to the California Air Resources Board for potential penalties CPUC Roles Compliance The CPUC determines retail seller compliance with the rules established in Commission Decisions D , D and D Procurement quantity requirement Portfolio balance requirement 36 month REC retirement rule Long-term contracting requirement PCC classification requirements Determine excess procurement 5

Summary of PCC Definitions, Criteria and Information Required to Demonstrate a PCC classification (D ,D ) 6

Portfolio Content Categories D and § In D , the CPUC defined and implemented three PCCs, established in Public Utilities Code Section PCC 1 – for RPS procurement from facilities with a first point of interconnection within a CBA, with generation scheduled into a CBA or with generation dynamically transferred into a CBA on an hourly or sub-hourly basis PCC 2 – for bundled that cannot be delivered to a CBA without substituting electricity from another source PCC3 – for other electricity products not qualifying as PCC 1 or PCC 2, including unbundled RECs 7

Procurement Content Category 1 8 Two Different Types of PCC 1 Transactions PCC 1 - Directly Interconnected to CBA Generation from a facility with first point of interconnection in the WECC and within the metered boundaries of a CBA PCC 1 – Not Directly Interconnected to CBA Generation from that facility scheduled into a CBA without substituting electricity from any other source Real-time ancillary services may be required to maintain an hourly or sub-hourly import schedule, but only generation from an RPS eligible facility from may qualify as PCC 1 Generation from that facility is scheduled into a CBA pursuant to a dynamic transfer agreement

Information Required for a PCC 1 Classification PCC 1 with First Point of Interconnection in a CBA Must be an demonstrate a first point of interconnection within a CBA: Demonstration of PCC 1 interconnected to a CBA: A copy of the facility’s transmission system interconnection agreement A copy of the facility’s distribution system interconnection agreement 9

Information Required for a PCC 1 Classification PCC 1 Claims Scheduled into or Dynamically Transferred into a CBA 10 In order for RECs from a facility scheduling generation into a CBA to qualify as PCC 1, ALL of the following conditions must be met: Electricity and RECs were procured by the retail seller through PPA (or other transaction) Demonstration: A copy of the original PPA and any additional amendments Electricity and RECs were generated by an RPS eligible facility Demonstration: Facility hourly meter data Electricity was scheduled into a CBA Demonstration: E-Tags and WREGIS Reports

Information Required for a PCC 2 Classification Claims from Bundled RPS Procurement That Cannot be Delivered Into a CBA Without Substituting Electricity from Another Source 11 In order for RECs to qualify for PCC 2, ALL of the following conditions must be met: Energy and RECs were simultaneously purchased from an RPS-eligible generation facility, and purchased energy must be available to the buyer Demonstration: A copy of the original PPA and any additional amendments An initial contract for substitute energy is acquired after the RPS-eligible energy is purchased Demonstration: A copy of the original PPA for substitute/incremental energy and any additional amendments The initial contract for substitute energy is acquired before the initial date of generation of the original contract Demonstration: A copy of the original PPA for substitute/incremental energy and any additional amendments

Information Required for a PCC 3 Classification REC Claims Outside of Portfolio Content Category Classifications 1, 2 – Including Unbundled RECs 12 In order for RECs to qualify for PCC 3, one of the following conditions must be met: A procurement contract consisting of unbundled RECs, originally associated with RPS eligible generation A procurement contract for RPS eligible generation that does not qualify to be classified as in either PCC 1 or PCC 2 Demonstration of a PCC 3 REC claim: A procurement contract Generation over the e-Tag scheduled amount

Information Required for a PCC 0 Classification REC Claims Exempt from the Portfolio Content Category Classifications 13 RECs from contracts executed before June 1, 2010 (implementation of AB 2187 may impact this date for ESPs), are not subject to the PCC classifications established in D , and will thus be known as PCC 0 RECs. Demonstration of a PCC 0 REC claim: A PPA with contract execution date An amendment to an original contract executed before June 1, 2010 that does not increase the nameplate capacity or quantities of generation

LUNCH BREAK 14

The Auditable Package - CPUC Reporting Documents for Verifying PCC Claims 15

16 The Auditable Package

The “Static Contract Information” Tab 17

The Auditable Package Static Contract Information On June 14, 2013 CPUC staff proposed the addition of a new reporting tab to the Annual RPS Compliance Report All PCC classifications require review of RPS contracts The “Static Contract Information” tab will report RPS contract information and enable CPUC staff to make accurate validations of retail seller PCC classification claims D provides a window of confidentiality for any contract submission to the CPUC 18

The Auditable Package Static Contract Information – Process 19 RPS contracts are necessary for verifying “Static Contract Information”, and required by D , Ordering Paragraph 41: The Director of Energy Division is authorized to require retail sellers to submit appropriate documentation, including but not limited to copies of renewables portfolio standard procurement contracts, to support the information in any report submitted in accordance with the requirements of this decision.

The Auditable Package Static Contract Information – Process 20 Retail sellers submit the “Static Contract Information” with each Compliance Report filing with one or more lines per RPS contract Retail sellers will update the “Static Contract Information” tab when a contract is amended Retail sellers will update the “Static Contract Information” tab when new contracts are added to their portfolio Retail sellers will update the “Static Contract Information” tab with new contracts and/or amendments for each Compliance Report filing

The Auditable Package Static Contract Information – Comments 21 Clarifying Question- What is the necessity of the proposed “Static Contract Information” tab: Several comments note that the CPUC has access to RPS contracts which contain the same information that is requested in the “Static Contract Information” tab. Why are retail sellers obligated to provide contract information in the RPS Compliance Report? Is there a better way for the CPUC to collect contract information?

The Auditable Package Static Contract Information – Comments 22 Clarifying Question- CPUC Confidentiality: Some retail sellers have expressed concern with providing the CPUC with PPA information. How will documentation submitted to the CPUC be collected? How market sensitive information will be kept confidential?

The Auditable Package Static Contract Information – Process 23 RPS contracts are protected under the CPUC confidentiality Decision (D.) , Ordering Paragraph 1: Where we find that data are market sensitive pursuant to Pub. Util. Code § 454.5(g) or otherwise entitled to confidentiality protection, in most cases, we adopt a window of confidentiality for Investor-Owned Utility (IOU) and Energy Service Provider (ESP) data that protects it for three years into the future, and one year in the past.

The Auditable Package Static Contract Information – Comments 24 Clarifying Question- Demonstration of Facility Point of Interconnection: Some retail sellers have expressed concern that they might not be able to provide interconnection agreements for facilities interconnected outside of their service territory: Can retail sellers provide interconnection agreements for all facilities? In the absence of interconnection agreements how can CPUC verify interconnection?

The Auditable Package Static Contract Information – Comments 25 Clarifying Question- Purpose/Necessity of Different “Online” Dates: The staff proposal requests that retail sellers report both the “Facility Beginning Online Date” and “Renewable Technology Online Date” – are both of these dates necessary for the CPUC to determine PCC classification of RPS compliance claims? a)“Facility Beginning Online Date” b)“Renewable Technology Online Date”

The Auditable Package Static Contract Information – Comments 26 Clarifying Question- Facility Source Name and OATI WebRegistry: The Staff Proposal states that facilities outside a CBA must enter the facility’s source name, as registered with OATI’s webRegistry. Why does the CPUC require OATI webRegistry naming conventions? How are facilities that are not in OATI treated - will procurement from such facilities comply with the RPS program?

The Auditable Package Static Contract Information – Comments 27 Clarifying Question- Duplicative Reporting Fields Retail sellers have noted that several reporting requirements in the “Static Contract Information” tab are duplicative with reporting requirements in the “Procurement Detail” tab: a)Technology b)Expected PCC Classification c)Contract Execution Date d)Contract Length What is the best way to resolve these duplicative reporting requirements - i.e. where do they belong in the compliance report? Can all “Static Contract Information” be included in the “Procurement Detail” Tab?

WREGIS e-Tag Summary Report 28

The Auditable Package WREGIS e-Tag Summary Report 29 The WREGIS e-Tag Summary Report is used to demonstrate that electricity was scheduled into California for RPS compliance WREGIS e-Tag Summary Report to the information will be compared to information in the Static Contract Information Tab to determine what e-Tags require audit

The “RPS Hourly e-Tag Summary Report” 30

The Auditable Package RPS Hourly e-Tag Summary Report 31 The “RPS Hourly e-Tag Summary Report” is used to synthesize important e-Tag information for the CPUC compliance process The “RPS Hourly e-Tag Summary Report” should only be used for RECs that are not reported in the WREGIS e-Tag Summary Report The information included in the “RPS Hourly e-Tag Summary Report” should match the information found on individual NERC e- Tags

The Auditable Package RPS Hourly e-Tag Summary Report – Comments 32 Accepted Change – Instructions and Data Definitions Load Serving Entity (PSE Sink) does not correspond with the definitions in report’s instructions or the Staff Proposal. CPUC staff will fix the instructions within the “RPS Hourly e-Tag Summary Report” to correspond with the column headers Is there any other information needed in order for the CPUC to verify retail seller e-Tag claims?

The “Hourly Meter and e-Tag Reconciliation Report” 33

The Auditable Package Hourly Meter and e-Tag Reconciliation Report 34 The “Hourly Meter and e-Tag Reconciliation Report” is used to compare hourly meter data with e-Tags schedules Real-time ancillary services may be required to maintain an hourly or sub-hourly import schedule Only generation from an RPS eligible facility may qualify as PCC 1 The “Hourly Meter and e-Tag Reconciliation Report” calculates the amount of generation eligible for PCC 1 No more than lesser of hourly generation and e-Tag schedule amount

The Auditable Package Hourly Meter and e-Tag Reconciliation Report – Comments 35 Accepted Change – Spreadsheet Form/Function Data Reporting when Multiple e-Tags are Generated in One Hour When there are multiple e-Tags in a single hour the current spread sheet could cause Hourly Meter Data to be reported twice. CPUC staff will change the formula options in the next version of “Hourly Meter and e-Tag Reconciliation Report” template

The Auditable Package Hourly Meter and e-Tag Reconciliation Report – Comments 36 Accepted Change – Spreadsheet Form/Function Percent Share of Final Schedule Versus Fixed Contract Volumes Retail sellers should be able to choose between the “Percentage Share Volume Contract” or “Fixed Volume Contract” for reporting e-Tags in the “Hourly Meter and e-Tag Reconciliation Report” Two ways that CPUC staff can fix this issue: 1. Adopt the CEC two tab methodology 2. Adjust the formulas within the CPUC proposed template - all e-tags and meter data reported in one tab

The Auditable Package Hourly Meter and e-Tag Reconciliation Report – Comments 37 Accepted Change – Spreadsheet Form/Function Significant Figures and Rounding Eligible PCC1 Volume - To account for rounding, the sum of the reported PCC1 volumes should be reported out to 4 decimal places. CPUC staff will change the formula options in the next version of “Hourly Meter and e-Tag Reconciliation Report” template This change is consistent with the CEC reporting methods

The Auditable Package Hourly Meter and e-Tag Reconciliation Report – Comments 38 Accepted Change – Instructions and Data Definitions There are some inconsistencies between the defined terms listed in the instructions and some of the column headings. a)“Used MWh,” b)“Amount of Hourly Meter Data Associated with Each Final Hourly Schedule (MWh),” c)“Final e-Tag Volume,” d)“Percent share of facility’s output. ” CPUC staff will fix the instructions within the “RPS Hourly Meter and e-Tag Reconciliation Report” to correspond with the column headers

WREGIS Compliance Report 39

The Auditable Package WREGIS Compliance Report 40 The WREGIS Compliance Report provides the quantity of RECs retired and the vintage/retirement date of RECs retired for compliance with the RPS program The WREGIS Compliance Report helps staff determine compliance with 36 Month Rules

The Auditable Package Timing of PCC Reporting 41 “Static Contract Information” Tab WREGIS e-Tag Summary Report “RPS Hourly e-Tag Summary Report” “Hourly Meter and e-Tag Reconciliation Report” Tab

Spreadsheet Form and Functionality 42

Change Requests for CPUC Reporting Spreadsheets Spreadsheet report template is too large (size MB) Instructions: Clarify what metric should be used to measure “PCC 2 Contract Length” in static information tab – e.g. years, months, days CPUC should remove “Expected Reporting Year” from spreadsheets CPUC should remove “Secondary Fuel Type” from spreadsheets Data definitions in the “Static Information” tab should match PDSR data definitions (IOUs only) CPUC should remove CPUC ID columns CPUC should clarify what “Additional Supporting Documentation” is necessary to substantiate “Resale Agreement” and “Contract Termination Date” fields 43

Next Steps 44

Next Steps Staff will draft a revised RPS compliance spreadsheet, as well as additional PCC reporting documents based today’s discussion, and will continue to collaborate with Working Group members as needed New drafted compliance spreadsheets, will be issued to the RPS service list (R ) for comment upon completion 45