Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.

Similar presentations


Presentation on theme: "1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with."— Presentation transcript:

1 1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with support documentation The HOME Program is a reimbursement program.

2 2

3 3 Draw Request status: (Creating Admin. Draw Request) Save Pending – not submitted to PM. Submit for Approval without Saving –authorized individual; submit the request to PM. Pending PM Approval – ready for PMs review. Disapproved by PM – Refer to the Notes for explanation & further instruction by PM. Pending Processing – Draw Request approved by PM & submitted to Acctg. Division for approval. Pending Accounting Approval – Draw Request reviewed by Acctg. Division & processed for a voucher number. Approved

4 4 Contract Summary Screen (Creating Admin. Draw Request) Select Draw Request in the lower right-hand corner of the Budget table.

5 5 Draw List (Creating Admin. Draw Request) Select Create New Draw Request in the lower right- hand corner of the Draw List screen.

6 6 Required Documentation (Creating Admin. Draw Request) ** Refer to current Checklist (available on website) for required documentation** A new Administrative Draw Request is initiated. Enter the Services Rendered dates (These dates must fall within the contract term). Click Save to continue the Draw Request and go to the next screen.

7 7 (Creating Admin. Draw Request)

8 8 Draws for Admin (Creating Admin. Draw Request) Enter draw amount in This Draw Amount column Enter the exact amount, including cents.

9 9 Approval Actions (Creating Admin. Draw Request) Save updates to Pending; OR Submit for Approval without Saving (2 step approval) updates to Pending PM Approval.

10 10 Overview (Creating Admin. Draw Request) Pending PM Approval status, the CA cannot perform any further action.

11 11 Draw Request (Creating Admin. Draw Request) Disapproved by PM - refer to the comments entered in the online in the Approval Action section (lower portion of the screen) for explanation and further instruction.

12 12 HBA Draw Requests If all HBA funds are being requested on the first Draw Request, refer to Creating a Final Project Draw Request and proceed as instructed in that section. If more than one HBA Draw Request will be made for a project, proceed as follows:

13 13 CREATING A PROJECT DRAW REQUEST The HOME Program is a reimbursement program. Complete a Checklist for HBA Draw Requests (Form 16.11). Match contribution is entered with project Draw Request. PM requires support documentation to include the following: –Description of expense –Date the expense was incurred –Draw Requests amount must agree with support documentation –Address of activity

14 14

15 15 Contract Summary Screen (Creating Project Draw Request) Select Activities at the upper right-hand corner of the screen.

16 16 Contract Activity (Creating Project Draw Request) Select appropriate activity number in the left-hand column.

17 17 Draw Balances (Creating Project Draw Request) Click on Draw Requests in the lower right-hand corner of the table.

18 18 Draw List (Creating Project Draw Request) Click Create New Draw Request in the lower right-hand corner

19 19 Required Documentation (Creating Project Draw Request) ** Refer to current Checklist (available on websites) for required documentation** A new Project Draw Request is initiated. Enter the Service Rendered dates (these dates must fall within the contract period). Select the box Check this box if all required documents…

20 20

21 21 Draws for Project (Creating Project Draw Request) Enter amount in This Draw Amount column. Entries to Miscellaneous should be minimal. All Miscellaneous entries should be identified and described in detail in the online Notes section

22 22 Approval Actions (Creating Project Draw Request) Save updates to Pending; OR Submit for Approval without Saving (2 step approval) updates to Pending PM Approval.

23 23 Draw Request (Creating Admin. Draw Request) Disapproved by PM Approval Action section (lower portion of the screen) for explanation and further instruction.

24 24 Modifying a Draw Request Contract Summary Screen (Modifying Project Draw Request) Select Activities at the upper right-hand corner of the screen.

25 25 Modifying a Draw Request Contract Activity (Modifying Project Draw Request) Select appropriate activity number in the left-hand column.

26 26 MODIFYING A DRAW REQUEST Draw List (Modifying Project Draw Request) Click the appropriate Draw Request number on the DRAW LIST screen and make the necessary changes. When the modified Draw Request is submitted to the Department (Submit approval without saving), it will be updated to Pending PM Approval

27 27 Processing Time Frame The funded amount (budget) data will not be updated until the Draw Request is approved by PM and by Accounting, and a voucher is assigned and entered into the System. This process requires 7-10 business days.

28 28 Creating a Final Draw Request Contract Summary Screen (Creating Final Draw Request) Select Activities at the upper right-hand corner of the screen.

29 29 Creating Final Draw Request Contract Activity (Creating Final Draw Request) Select appropriate activity number in the left-hand column.

30 30 Draw Balances Creating (Creating Final Draw Request) Select Draw Requests in the lower right-hand corner of the table.

31 31 Draw List (Creating Final Draw Request) Click Create New FINAL Draw Request.

32 32 Draw Request (Creating Final Draw Request) Confirm that the Final Draw box is checked and data is correct.

33 33 Additional information for Final Draws (Creating Final Draw Request) Note: The final Draw Request will not be approved without entering Project Completion (PCR – activity levelRelated section) data. All applicable Match for a project must also be reported before a final Draw Request will be approved by PM.

34 34 REPORTING MATCH CONTRIBUTION (Creating Final Draw Request) Match data should be entered with a project Draw Request. Provide proper support documentation

35 35 ENTERING A PROJECT COMPLETION REPORT (PCR) DATA PCR data is the final action Completed & submitted with the final Draw Request Select Activities (to get list of activities)

36 36 Contract Activity (Entering PCR) Select appropriate activity number in the left-hand column Then scroll down to the RELATED section of the activity screen.

37 37 Related Section (Entering PCR) Click on Project Completion Report

38 38 Project Completion Report. (Entering PCR) Scroll down the screen and enter data in each section, as applicable.

39 39 Property Details (Entering PCR) Property Type – Confirm data entry is correct. FHA Insured – Confirm data entry is correct. Initial Purchase Price – Enter amount as shown on HUD-1 After Rehabilitation Value – Do not enter anything in this field. Accessible – Confirm data entry is correct Activity Type – Confirm data entry is correct. Appraised Value – Do not enter anything in this field.

40 40 Home Funds (Entering PCR) HBA activities are deferred loans. Annual Interest Rate - Enter 0. Amortization Period – Enter 10. Enter amount of funds committed to the project.

41 41 Public Funds (Entering PCR) Enter data if applicable (i.e. grant from city).

42 42 Private Funds (Entering PCR) Enter data if applicable (i.e. conventional mortgage loan).

43 43 Approval Actions (Entering PCR) Save updates to Pending; OR Submit for Approval without Saving (2 step approval) updates to Pending PCR Approval.

44 44 Overview (Entering PCR) The PCR has now been processed.


Download ppt "1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with."

Similar presentations


Ads by Google