Carpinteria Field Waterflood. Agenda Objective Phillips injection results Geologic aspects of waterflood Injection water supply o Quantity o Quality Water.

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

2 Casa 15m Perspectiva Lateral Izquierda.
Números.
Who Wants To Be A Millionaire?
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Welcome to Who Wants to be a Millionaire
AP STUDY SESSION 2.
1
EuroCondens SGB E.
Copyright © 2013 Elsevier Inc. All rights reserved.
STATISTICS INTERVAL ESTIMATION Professor Ke-Sheng Cheng Department of Bioenvironmental Systems Engineering National Taiwan University.
David Burdett May 11, 2004 Package Binding for WS CDL.
16 th April 2008 Energy Outlook View of an International Oil Company Thierry PFLIMLIN President & CEO Total Oil Asia-Pacific Pte Ltd 2 nd ARF Seminar on.
TexChem Group International LLC
CALENDAR.
Welcome to Who Wants to be a Millionaire
CHAPTER 18 The Ankle and Lower Leg
Who Wants To Be A Millionaire?
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
Welcome to Who Wants to be a Millionaire
The 5S numbers game..
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Media-Monitoring Final Report April - May 2010 News.
Break Time Remaining 10:00.
Meniv Rishon Ltd. The municipal water, drainage & waste water company.
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
FIGURE 6-1 Comparison of: (a) ac waveform: (b) dc waveform; (c) dc variable power supply and battery-sources of dc; (d) function generator-a source.
PP Test Review Sections 6-1 to 6-6
Unit Operations in Chemical Industries BY Dr.LEK WANTHA
MCQ Chapter 07.
2013 Fox Park Adopt-A-Hydrant Fund Raising & Beautification Campaign Now is your chance to take part in an effort to beautify our neighborhood by painting.
Real-Time Gas Lift Optimization
Regression with Panel Data
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Biology 2 Plant Kingdom Identification Test Review.
Chapter 1: Expressions, Equations, & Inequalities
Area under curves Consider the curve y = f(x) for x  [a, b] The actual area under the curve is units 2 The approximate area is the sum of areas.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
Before Between After.
FORESTRY EQUIPMENT ID 1. TREE STICK 2 DIAMETER TAPE 3.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
Figure 1. Oil Field Exporting to Pipeline (Data Type P) [36] Injected Water [34] Produced Water [35] Produced Water to Sea [1] Oil Production [4] Associated.
1 Lab 17-1 ONLINE LESSON. 2 If viewing this lesson in Powerpoint Use down or up arrows to navigate.
AS "PrivatBank" Main Figures as of 11 Months of 2008.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
FIGURE 12-1 Op-amp symbols and packages.
Clock will move after 1 minute
Water Resource Efficiency Gerard Enright STEM Project.
Physics for Scientists & Engineers, 3rd Edition
1.step PMIT start + initial project data input Concept Concept.
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Presented to: By: Date: Federal Aviation Administration FAA Safety Team FAASafety.gov AMT Awards Program Sun ‘n Fun Bryan Neville, FAASTeam April 21, 2009.
Quiz Number 2 Group 1 – North of Newark Thamer AbuDiak Reynald Benoit Jose Lopez Rosele Lynn Dave Neal Deyanira Pena Professor Kenneth D. Lawerence New.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
20,000 Barrel Per Day Produced Water Treatment System
Flow Network Construction
Presentation transcript:

Carpinteria Field Waterflood

Agenda Objective Phillips injection results Geologic aspects of waterflood Injection water supply o Quantity o Quality Water treatment Injection equipment

Waterflood Objective OCS-P 0166 Increase Oil Recovery by 10 to 15% of OOIP 16 – 20 MM bbls additional oil recovery

Carpinteria Offshore Field

Waterflood Objective OCS-P 0166 Increase Oil Recovery by 10% of OOIP 16 – 20 MM bbls additional oil recovery

Waterflood Objective OCS-P 0166 Increase Oil Recovery by 10% of OOIP 16 – 20 MM bbls additional oil recovery

OOIP Data DateSourceOOIP (MM bbls) Method 1968Phillips Volumetric 1998PACOPS157Volumetric 166Material Balance 2008PACOPS Decline Curve

The Phillips Water Disposal Program Pilot Disposal Test March – June ,846 bbls into Well A-32 5-year Limited SWD ,000,000 bbls into 5 Wells 300,000 – 500,000 STB from 8 offset producers Severe channeling Oil recovery was not maximized Enhanced oil recovery study 1983.

The Phillips Water Disposal Program Pilot Disposal Test March – June ,846 bbls into Well A-32 5-year Limited SWD ,000,000 bbls into 5 Wells 300,000 – 500,000 STB from 8 offset producers Severe channeling Oil recovery was not maximized Enhanced oil recovery study 1983.

The Phillips Water Disposal Program Pilot Disposal Test March – June ,846 bbls into Well A-32 5-year Limited SWD ,000,000 bbls into 5 Wells 300,000 – 500,000 STB from 8 offset producers Severe channeling Oil recovery was not maximized Enhanced oil recovery study 1983.

Repetto Producing Sands

Water Injection Wells, Top of F-1

Block M

Cross Section - Block M South North A-2 A-4 A-46ST1 A-1ST1 A-49WB1 A-43ST1 A-52ST1 F-1 F-3 F-2 F-4

Block – M Log Comparison A-2A-4 A-46ST1A-52ST1

SWD System at La Conchita Plant SWD Retention Tank Quintaplex Pumps Mixing Tank Media Filters To 4 line

SWD Rates Discharge to Ocean (250 total days from 6/2007 to 2/2008) % 21% 25% Number of Days Barrels per Day

Injection Water Quality Total Suspended Solids (TSS) Around 1 micron or less Critical Cations Calcium 66 ppm Barite unmeasurable Magnesium 80 ppm Other 0.5 ppm or less H 2 S 0.37 ppm dissolved O 2

Water Treatment Scale Inhibitor LSI: 0.4 – 1.53 Biocide SRBs Corrosion Inhibitor Treat Oxygen scavenger TBD

Equipment Layout at Platform Hogan Sampling point Chemical Injection Centrifugal pump Flow meter Low level High level Variable Choke Variable Choke 4 line from La Conchita Plant Disposal Tube Stabilizing Tank Flow Control Filter Bank Pressure gauge

Water Injection Wellhead and Manifold Layout 3 Master Valve 3 Well Manifold Kerotest valve Pressure gauge Sampling point 3 Actuated Wing Valve 3 Crown Valve Flow Tee or Cross 3 Choke Valve 3 Manifold Isolation Valve (MIV)3 Bowen Union Continuous Electronic Pressure Monitor Continuous Electronic Flowmeter

61 MM 52 MM EL OPEX $1.5 MM/Mo Oil Price $75/bbl

68 MM 52 MM EL