PROCEDURE DESIGN MASTER CLASS

Slides:



Advertisements
Similar presentations
Emergency COA Process Presented to: UAS All Users TELCON
Advertisements

B-RNAV OPERATIONS IN EUROPEAN AIRSPACE
MINIMUM NAVIGATION PERFORMANCE SPECIFICATION AIRSPACE (MNPS)
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Regional RAIM Prediction System – Progress Report
Introduction to Navigation Specifications
Overview of Continental En-route Navigation Specifications
International Flight Inspection Symposium
Identifying the Achilles Heels of Instrument Flight Procedures International Flight Inspection Symposium Oklahoma City, OK USA June 2008 Ivan Ferencz CAA.
RNAV Procedures AIXM Procedures Seminar 1-2 Sept 2010.
PBN ICAO HQ Activities Overview
Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 8/25/ A CO 2 versus noise trade-off study for the evaluation.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-85/PIA-3 Air Traffic Situational Awareness (ATSA) Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
Workshop on preparations for ANConf/12 − ASBU methodology
JAA TGL 10 Explained D J Hawkes UK CAA
P. GAYRAUD /B. RABILLER Cologne the 21st of June 2007
1 PP 48 Use of GNSS distance instead of DME B. Rabiller CNS-ATM steering group meeting Gatwick February 2008.
Procedure Design Considerations
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
PROCEDURE DESIGN CRITERIA
Specification and Validation of Navigation Data Business Rule
Instrument Ground Training Module 3 Randy Schoephoerster
USER COMMUNITY NAVIGATION TRANSITION PLAN 19 TH ANNUAL FAA/JAA INTERNATIONAL CONFERENCE June 3-7, 2002 Phoenix, Arizona Presented by Frank Alexander Northwest.
PBN Plan Development Aviation Industry Forum 18 November 2009.
PBN Airspace Concept Workshop ReviewReview. Review of Workshop 2 ✈ 10 day PBN Airspace Design Workshop ✈ ICAO Doc 9992: PBN in Airspace Design ✈ Plan,
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Area Nav: RNP Evolution
ELEC 4600 RADAR & NAVIGATION
CHARTING Regulation and issues
Special Topics Introduction to Aeronautical Engineering
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
OPERATIONAL SUPPORT AIRLIFT AGENCY DEPARTURE & CONTINGENCY PROCEDURES CW3 MICHAEL R. JEWETT OSAA FLIGHT STANDARDS CW3 MICHAEL R. JEWETT OSAA FLIGHT STANDARDS.
International Training: Area Navigation Pre-flight
International Civil Aviation Organization and ISO/TC 211 ISO/TC 211 Seminar Berlin, 29 October 2003 ISO/TC 211 Seminar Berlin, 29 October 2003.
Basic Indoctrination Navigation 2 HOURS
© 2011 The MITRE Corporation. All rights reserved. Advisory Vertical Guidance (Advisory VNAV) A Useful and Flexible Safety Enhancement S.V. Massimini,
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Navigation.
LECTURE 4: ICAO CHART requirements
Joining RNAV Approaches at a fix or waypoint Prepared by John D. Collins CFI/CFII.
1 Conditions for Mandating Data Link Equipage Steve Zerkowitz - IATA.
Arrival Charts and Procedures
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
ATS Route and Waypoint Implementation:
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
PlaneWrong AGM Thursday 13th October
Overview of Continental En-route Navigation Specifications
Workshop on preparations for ANConf/12 − ASBU methodology
PBN Performance Based Navigation
BWI Roundtable Presentation
RAAF AERONAUTICAL INFORMATION SERVICE
Performance Based Navigation: Navigation Specifications
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Regional RAIM Prediction System – Progress Report
PBN Airspace Concept Workshop
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
Oceanic and International Operations
ASEAN PBN Routes Objectives:
Workshop on preparations for ANConf/12 − ASBU methodology
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
RNAV and RNP Strategy in Japan
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
PBN ICAO HQ Activities Overview
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

PROCEDURE DESIGN MASTER CLASS James (Jim) W Gregory Civil Aviation Inspector and ATPL pilot with Transport Canada AIS and Airspace Standards Chair of ICAO OCP Participant at many RNAV related forums (RTCA SC-181, ATA FMS Task Force, FMS SID/STAR WG)

PROCEDURE DESIGN MASTER CLASS History of RNAV History of ARINC 424 Problems related to existing procedures Reason for limited ARINC 424 set

HISTORY OF RNAV (According to Gregory!!) Area Navigation (RNAV) a method of navigation that permits aircraft operation on any desired course within the coverage of station-referenced navigation signals or within the limits of a self contained system capability, or a combination of these.

HISTORY OF RNAV (According to Gregory!!) RNAV developed to provide more lateral freedom Better use of airspace Route not tied to fly-over navigation aids Initially RNAV commonly meant VOR based rho-theta RNAV systems Expanded to also include INS/IRS, OMEGA, LORAN C, Doppler, DME/DME and GNSS

HISTORY OF RNAV (According to Gregory!!) Use of RNAV began in late 1960’s Most were VOR/DME RNAV systems (for GA types; INS for large air carriers) 1st commercial RNAV system (course/track line computer) NARCO CLC-60 in mid 1968 System used waypoints based on radial/DME from VOR/DME facilities Maximum distance WP from facility was approximately 40 NM

HISTORY OF RNAV (According to Gregory!!) Early VOR/DME RNAV system (KNS 80) track line computer

HISTORY OF RNAV (According to Gregory!!) Rho-Theta RNAV Route Haines to Belgrade No database support required yet!

HISTORY OF RNAV (According to Gregory!!) Other agencies began exploring RNAV systems KLM/SwissAir/SAS/UTA had a co-operative effort SwissAir became responsible for the development of a database to support this effort

HISTORY OF RNAV (According to Gregory!!) 1972 (?) LITTON INS had database of facilities June 1973, National Air DC-10 equipped with Collins ANS-70 conducted RNAV operation, including approaches in VMC, with database

HISTORY OF RNAV/ARINC (According to Gregory!!) 1973 - avionics manufacturer’s requirement for databases became more critical Each manufacturer had their own unique requirements for data Aug 1973 - Jeppesen invites avionics manufacturers to meet Meeting described as cautious

HISTORY OF RNAV/ARINC (According to Gregory!!) Airlines Electronic Engineering Committee (AEEC) approached to broker industry standards for databases for navigation Sep 1973 - AEEC Area Navigation Subcommittee established working group to standardize RNAV system reference data format and encoding characteristics

HISTORY OF RNAV/ARINC (According to Gregory!!) Committee noted: different RNAV manufacturers taking divergent paths with respect to reference data organization unless trend was halted, airline industry would face very high costs of supporting the production of data files in several different formats economic benefits would result if resolution could be established

HISTORY OF RNAV/ARINC (According to Gregory!!) WG met Jan 74 examined ways different manufacturers dealt with reference data organization meeting described as “interesting” as attendees were engineers whose interests were not specifically Aeronautical Information Services

HISTORY OF RNAV/ARINC (According to Gregory!!) Subsequent WG meetings in Mar and May 74 concentrated on defining characteristics for data elements AEEC RNAV subcommittee reviewed WG’s first draft “Project Paper 424” Sep 74 RNAV subcommittee endorsed principles established by WG RNAV subcommittee took on work itself and disbanded the WG

HISTORY OF RNAV/ARINC (According to Gregory!!) Second draft document developed in Jan 75 additional amendments constituted 3rd draft 3rd draft “Project Paper 424 - Area Navigation System Data Base Specification” approved by AEEC in Spring 75

HISTORY OF RNAV/ARINC (According to Gregory!!) ARINC Specification 424, adopted by AEEC, first published 21 May 75 Spec amended regularly each amendment following first publication identified as 424-1, 424-2, 424-3, etc information up to ARINC 424-3 only included point-to-point-to-point navigation

HISTORY OF RNAV/ARINC (According to Gregory!!) ARINC 424-3, published 4 Nov 82, introduced concept of “path and terminator” “path and terminator” concept created by Sperry concept permits coding of terminal area procedures, SIDs, STARs and approaches

HISTORY OF RNAV/ARINC (According to Gregory!!) Concept established “rules” of coding Concept includes a set of defined codes known as “path terminators” or “leg type” Path Terminator “rules” contained in ARINC 424 Attachment 5 Currently there are 23 different “leg types”

HISTORY OF RNAV/ARINC (According to Gregory!!) Track to Fix (TF)

HISTORY OF RNAV/ARINC (According to Gregory!!) Initial Fix (IF)

HISTORY OF RNAV/ARINC (According to Gregory!!) Hold to Fix (HF), Hold to Altitude (HA), Hold to Manual termination (HM)

HISTORY OF RNAV/ARINC (According to Gregory!!) Direct to Fix (DF)

HISTORY OF RNAV/ARINC (According to Gregory!!) Fix to Altitude (FA)

HISTORY OF RNAV/ARINC (According to Gregory!!) Course to Fix (CF)

HISTORY OF RNAV/ARINC (According to Gregory!!) Procedure turn to Intercept (PI)

HISTORY OF RNAV/ARINC (According to Gregory!!) Course to Altitude (CA)

HISTORY OF RNAV/ARINC (According to Gregory!!) Course to Intercept (CI)

HISTORY OF RNAV/ARINC (According to Gregory!!) Course to DME termination (CD)

HISTORY OF RNAV/ARINC (According to Gregory!!) Course to Radial interception (CR)

HISTORY OF RNAV/ARINC (According to Gregory!!) Fix to distance on Course (FC)

HISTORY OF RNAV/ARINC (According to Gregory!!) Fix to DME termination (FD)

HISTORY OF RNAV/ARINC (According to Gregory!!) Fix to Manual termination (FM)

HISTORY OF RNAV/ARINC (According to Gregory!!) Arc to a Fix (AF)

HISTORY OF RNAV/ARINC (According to Gregory!!) Heading to DME distance (VD)

HISTORY OF RNAV/ARINC (According to Gregory!!) Heading to Altitude (VA)

HISTORY OF RNAV/ARINC (According to Gregory!!) Heading to Manual termination (VM)

HISTORY OF RNAV/ARINC (According to Gregory!!) Heading to next leg Intercept (VI)

HISTORY OF RNAV/ARINC (According to Gregory!!) Heading to Radial termination (VR)

HISTORY OF RNAV/ARINC (According to Gregory!!) Radius to a Fix (RF)

HISTORY OF RNAV/ARINC (According to Gregory!!) Certain path terminator assumptions are made to accommodate aircraft performance: speed - 210 K ground speed used to compute distance based upon 3.5 NM per min on course reversal - max distance of 4.3 NM used before turn inbound if no distance or time specified

HISTORY OF RNAV/ARINC (According to Gregory!!) Max 25 degree bank angle used to compute turn radius climb rate of 500 feet per NM used in computations intercept angles - no specified, 30 degrees for intercept of localizer based and 30 - 45 degrees for all others

HISTORY OF RNAV/ARINC (According to Gregory!!) Path terminator concept developed to code existing conventional instrument procedures However, not all conventional procedures easily coded “conditional” procedures, easy for pilot to interpret, are difficult for computer to describe

HISTORY OF RNAV/ARINC (According to Gregory!!) Industry made representation to ICAO OCP RNAV WG in Jun 91 regarding problems with coding conventional procedures OCP 10 Nov 94 proposed amendment 9 to PANS-OPS Vol I regarding use of FMS/RNAV on conventional procedures:

HISTORY OF RNAV/ARINC (According to Gregory!!) “FMS/RNAV…may be used…provided: procedure is monitored using basic display normally associated with that procedure; and tolerances for flight using raw data on the basic display are complied with.” “Lead radials are for non-RNAV equipped aircraft and are not intended to restrict the use of turn anticipation by the FMS”

HISTORY OF RNAV/ARINC (According to Gregory!!) Furthermore, agreement to have FMS-equipped aircraft fly tracks instead of procedural headings provided heading not required for ATC separation Industry requesting that design of terminal area procedures be compatible with increasing number of FMS equipped aircraft

HISTORY OF RNAV/ARINC (According to Gregory!!) New criteria introduced into PANS-OPS to cater to the needs of the modern aircraft navigation databases VOR/DME RNAV (Chap 31) GNSS “basic receiver” criteria (Chap 33) DME/DME RNAV (Chap 32) RNP (Chap 35) BARO-VNAV (Chap 34)

HISTORY OF RNAV/ARINC (According to Gregory!!) When developing RNAV procedures, following path terminators accommodate all procedures: IF, TF, DF, FA, CF, HF, HA, and HM When developing RNP RNAV procedures, the following path terminators are only used: IF, TF, RF, (DF and FA -discouraged), (CF - to be phased out), HF, HA and HM

HISTORY OF RNAV/ARINC (According to Gregory!!) OCP 12 introduced material for PANS-OPS Vol II and Procedure Design Manual concerning path terminators, their definitions, and their application Encourage procedure designers to become more knowledgeable about path terminator

HISTORY OF RNAV/ARINC (According to Gregory!!) On a personal note: aircraft operation is becoming more reliant upon computer technology rather than pilot skill computers are smart - but cannot think - yet! the days of decision making with regard to navigation is being replaced by “monitoring” crowded skies dictate clearly defined airspace structure and procedures

HISTORY OF RNAV/ARINC (According to Gregory!!) Hence, the reason for procedure designers to clearly understand the airborne technology You are the people who have the greatest influence on the success (or failure) of RNAV and RNP RNAV implementation

HISTORY OF RNAV/ARINC (According to Gregory!!) QUESTIONS ? ? ? ? ? ?